Description
Key Learnings
- List some best practices for using InfraWorks combined with other BIM platforms
- Describe how InfraWorks can enable planning to create 3D conceptual models
- Define workflows to enable the geometry and intelligent data moving between Infrastructure Design Suite
- Distribute generated clash markups via email instantly and have users link to conflict areas within Revit
Speakers
- Joseph HuangJoseph ChuenHuei Huang, PhD, AIA is Principal Architect, BIM and Innovation Leader at Stantec. He has more than 25 years of professional experience in the AEC industry and has served as the BIM Manager for numerous large-scale projects including the Panama Canal Third Set of Locks. His project experience ranges from vertical construction to complex infrastructure, where he has successfully integrated BIM into project design and construction phases. Besides that, he is the author of Participatory Design for Prefab House: Using Internet and Query Approach of Customizing Prefabricated Houses and co-author of Industry 4.0 for the Built Environment. He presents BIM-related topics regularly to universities and global industry groups at international conferences like AU, BILT, SAME, ACADIA, eCAADe, and CADDRIA. He is a licensed architect registered in Illinois and Texas, and an active AIA, NCARB & LEED professional member.
- RBRaghavendra BhatRaghavendra Bhat is a Building Information Modeling (BIM) leader at MWH now part of Stantec, providing integrated project delivery expertise utilizing Autodesk, Inc., software. Bhat has over 12 years of professional experience working in the architecture, engineering, and construction (AEC) industry using BIM technology on a wide variety of international and local projects (for example, federal government, public works, wet infrastructure, and skyscrapers). Bhat has also mentored and trained, and he has developed standards and guidelines and project templates / standard templates.
No transcript
Downloads
Tags
Product | |
Industries | |
Topics |