説明
In this class, we will cover how KBR used BIM 360 software, Navisworks software, and iConstruct to facilitate their Advanced Work Packaging process and increased project visibility, construction productivity, quality, and safety on a $500 million industrial construction project on the Texas Gulf Coast.
主な学習内容
- Learn about how KBR applies Advanced Work Packaging to its projects
- Learn Navisworks, BIM 360, and iConstruct workflows and best practices
- Learn engineer/construction BIM best practices
- Understand the value received by KBR and the extended project team
スピーカー
- CMConnie McLaughlinI am a Technical Services Manager for US Construction at KBR where I lead the site team in Work Face Planning (WFP), Document Control, Turnover and Closeout including managing Requests for Information (RFI’s) and Non-conformance Reporting (NCRs). I have worked at KBR for 30 years in engineering and construction in the oil and gas industry with emphasis on project execution. Many assignments included system support roles as well as system development and deployment. All of these various roles helped me transition into a WFP Manager and a subject matter expert at KBR for Advanced Workface Planning (AWP).
- Cody AustinCody is a member of Autodesk’s Technical Solutions Team focused on connecting Autodesk’s solution portfolio with Customer’s challenges, goals and strategic initiatives . He brings with him over 14 years of Industrial Construction experience including: 4 Texas Gulf Coast projects with Zachry Group, laser scanning with Hi-CAD/LFM, plant design and engineering with AVEVA and now 7 years in his current role focusing on Industrial Construction and Advanced Work Packaging. Cody is also a member of the Construction Industry Institute, RT 364 integrating Commissioning and Startup activities into the AWP framework and RT 344 improving supply chain visibility.
Video Player is loading.
No transcript
Downloads
タグ
製品 | |
業種 | |
トピック |