AU Class
AU Class
class - AU

Infrastructure FM: Effective Maintenance of Railways and Roads Using BIM and GIS

このクラスを共有
ビデオ、プレゼンテーション スライド、配布資料のキーワードを検索する:

説明

What are the benefits of the integration between BIM (Building Information Modeling) and geographic information system (GIS) in infrastructure facility management? This class will demonstrate how combined usage of Esri GIS data and tools and the as-built intelligent models enables your organization to do the following: monitor the entire railway or road integrating the intelligent model into the environment. The use of GIS data like geological surveys, interferometric data, and historical data regarding hydrogeological risks can let us prevent infrastructure damages; plan preventive and corrective maintenance merging data from intelligent models and GIS information, for example, choosing the optimal route to reach the point of interest; choose optimal solutions that respect the environment by exploiting the functionality of specific tools (for example, solar exposure and irradiation); and communicate effectively with the team distributed throughout the territory.

主な学習内容

  • Discover best practices for getting started with integration between the Esri GIS platform and Autodesk software for facility management
  • Learn how to set up a workflow between BIM and GIS
  • Explore opportunities and benefits of GIS analysis
  • Learn how to foresee major issues to prevent infrastructure damages

スピーカー

  • Marcella Faraone
    Marcella Faraone employed by FS Tecnology. Head of Competence Center BIM GIS, She is responsible for researching new technologies and innovating workflows with BIM and GIS. She has a BIM management experience acquired in the Red Line North Underground project in Doha, where she has worked from 2014 as MEP BIM Coordinator. In 2012 she promoted the introduction of BIM in her company and started pilot project. The project was successful and, from that moment on, BIM has widely adopted by Italferr. Before starting to work with BIM, she took part in several ICT projects as a Project Managers. During this years Marcella acquired experience in GIS platform and awareness of great potentiality of GIS analysis. During 2018/2019 she participated as a speaker at the following events: ESRI Italia conference 2018, Autodesk Rail Summit, European GIS Transportation Summit, Autodesk University Las Vegas. Together with her team, she received the Special Achievement in GIS Award at the 2019 by Esri.
Video Player is loading.
Current Time 0:00
Duration 0:00
Loaded: 0%
Stream Type LIVE
Remaining Time 0:00
 
1x
  • Chapters
  • descriptions off, selected
  • subtitles off, selected
      Transcript

      MARCELLA FARAONE: Good afternoon, everybody. And thanks for coming today to hear from us the results of our activities. I'm Marcella Faraone. I'm from Italferr, Italy. And I'm the head of the Competence Center BIM GIS. I would like to introduce Paolo, who is [? supporting ?] me today in this class to present this class. Paolo, [? presenting. ?]

      PAOLO QUADRINI: Hello, I am Paolo Quadrini from Autodesk Consulting. I'm a BIM expert technical expert. And I have collaborated with Italferr since 2015.

      MARCELLA FARAONE: OK, so we are very happy to share with you the results of our activity, which is the integration between BIM and GIS. This integration, it's not only an integration from a technological point of view, but also we are reviewing processes inside our company.

      So we can see the workflow between the BIM and the GIS data would the environment-- would you like to call this [INAUDIBLE] data? And we can see this workflow that throughout the entire infrastructure lifecycle management from this feasibility and concept design till the [? handover ?] and the facility management phase.

      In this class, we will focus our attention on the facility management phase. And we will show how to achieve an effective maintenance integrating data from BIM and GIS. We will see how to plan effectively the maintenance, both ordinary and extraordinary managing this data. And we will see how to monitor the lines, railway, roads, and undergrounds, and tramway lines to prevent damages, for example from [INAUDIBLE] light. And we will see how to communicate effectively with the team distributed throughout the territory, sharing stored data in the clouds [INAUDIBLE] and Autodesk clouds.

      Look at the agenda. I will talk briefly about our company, that is Italferr, and our team, the Competence Center BIM GIS. We will see the beginning of the project. And then we will go deeply in the specific workflow for facility management. Then we will see other examples of how is this useful to integrate the data for maintenance of the infrastructure and the how to prevent-- to monitor the line to prevent damages.

      Let's start with a brief description of Italferr. Italferr is an engineering company belonging to the group Ferrovie dello Stato Italiano. We have several years of experience of large infrastructure projects like high speed rail, and conventional rail for transport, urban rail lines like underground tram lines. We have a a lot of experience in system integration and the high speed integration with existent lines.

      Our expertise ranges from project management to construction site management supervision, from engineering design to innovation solutions and research, and testing and commission [? of new ?] railway lines and [? then ?] the [? older ?] railway lines.

      Look at the figures. We have 34 years of experience. Currently, we are managing almost 1,000 projects, among these, 130 construction projects. And we have several offices in Italy and abroad. These are the offices in Italy. And the main projects in Italy regards mainly high speed rail, capacity, and corridors. We have several projects to connect the existent Italian lines the north of Italy from the other European countries.

      We have been involved with the redesign, organization design of some metropolitan nodes like in major Italian cities like, Rome, Milan, Torino, et cetera. And these [? reorganizations ?] consist in a redesign of the connection between the stations and the other point of the city or the other station with the other urban transport. We are managing a project also for technology innovation on the existent railway lines, especially for the implementation of GSM.

      These are the branches abroad. Abroad, we work especially for feasibility concept design, for [? detail ?] design of large infrastructure railway lines, underground lines, and for consultancy work. We work in the European Union, as already seen for the design of the corridors, in the other countries of Europe, in Africa, Algeria, Morocco, Ethiopia. In the Middle East, we work and manage the detail design of the Saudi land bridge which is 1,300 kilometers across the Saudi Arabia. And in Qatar, we work-- we design-- we be involved in a project of design, build the red line [INAUDIBLE] underground in Doha. We work also in Argentina, Peru, in India, and Australia.

      Just a brief introduction of our team, Competence Center BIM GIS-- inside the organization chart of Italferr, we are under the strategy and innovations office, inside the IT department. And we've been supporting the introduction of BIM in Italferr since 2012. We've been involved in BIM management coordination, BIM coordination activity in the design of now the red line [INAUDIBLE] underground in Doha. And at present, the main objective of our team is the research on new technologies with [INAUDIBLE] workflow with BIM and GIS in order to support the core processes of Italferr, of our company, which are the engineering design and the construction site management. l

      Just one year ago started this project that involved also Autodesk and ESRI. We established a partnership with the Autodesk, with accounting team and the consulting team. And Paolo is a representation of the Autodesk team this day in this class. And with ESRI Italia, the girls from ESRI.

      Let's talk about the project. So as I already said, we consider workflow within these two platforms. So what we call the BIM model and GIS data, and this workflow can be used throughout the entire building lifecycle management.

      We started this project almost two years ago with the Italferr geoportal. What is the Italferr geoportal? It is a place where to share all geographical information, as in geological surveys, map surveys, environmental constraint. But we finally found it very useful, also, to publish in this place also the information from the project, especially if design BIM Why? Why this? Because we think we will see that the-- take-- import the BIM model into the environment can allow us to take a great advantage from the potential-- for the potential-- [? great ?] potential analysis 2D and 3D GIS analysis.

      These are the software used during these experimental activities. From one side, Autodesk software, we use BIM 360 as the common data environment to store all files on the project. To design the model, the entire infrastructure model, we used Civil 3D [? Revit ?] Dynamo. For 3D coordination for the simulation, we used Infoworks and Navisworks.

      On the other side, we use-- these are the software. We use the data from geoportal and other [? XNR ?] sources and the ArcGIS Pro software, ArcGIS online, the first for 2D and 3D analysis. And the second to publish this data the entire data, the model data from the model and the [INAUDIBLE] information, that can be used from the apps Navigator and Collector.

      Now we will see the workflow, a specific workflow in the facility management phase with the software used. Starting from the GIS data export-- at the beginning of the project, especially for infrastructure project-- a rail line, road, et cetera-- we have two geographical database to design and to model the entire infrastructure. So we use the ArcGIS Pro to elaborate this data, for example, the digital elevation model. And then with Autodesk Civil 3D Revit Dynamo we design and model the entire infrastructure.

      All the model will then be imported into ArcGIS Pro and published into ArcGIS online to be used from the apps Navigator and Collector from the field operator for doing the maintenance operation. And then all-- the return, now, all the data changed in the maintenance operation will be imported into the BIM model to change the BIM model.

      Now at present, Italferr is managing the concept design of the Brescia Tramway, a city in the north of Italy. We are using this project as a proof of concept to simulate the entire infrastructure lifecycle management, from feasibility design to handover and facility management. And now Paolo will show a demo, this will flow applied in this project for in the phase-- focusing, obviously, on the management phase.

      PAOLO QUADRINI: So in this step by step workflow video, we will see quickly how to achieve the goal of collaboration, prevention, monitoring, and management in rail maintenance from a technical point of view. This is Brescia. And here you can see the white line. That is the [INAUDIBLE] Tramway Line Project. And in our proof of concept, we have retraced the BIM design process to provide and share BIM data to our GIS platform, and vise versa to move information from GIS to BIM.

      Now let's start the video to see that more in detail. In this first part, I'm going to show you how to create a corridor in Civil 3D. So in a new file, we set coordinates by searching and selecting the correct coordinate system. As you know, to create a corridor, we need an alignment, a topographic surface, a profile, and an assembly. We import the alignment from an external file. And we use the shape file instead of a DWG, because the shape file is G referenced.

      So we have the alignment. And we just have to turn on the aerial map to see if the coordination is well done. And now we have to create the alignment. Because before it was just a [? pulley ?] line. And this [? pulley ?] line is composed of four tracks. Two are left and right main tracks. And the other are a part of our [INAUDIBLE]. We convert every track to an alignment.

      We could have created the alignment just inside Civil 3D. But in our workflow, the civil designers didn't use Civil. We can now import the surface, a DEM surface, so a digital elevation model. We took this open data from [? INSPRA, ?] an Italian Institute of Environment, Protection, and Research. And we elaborated it with our GIS Pro. Civil 3D adds some problem to import this kind of data.

      So we create that profile and then our profile view. These 2D [? pulley ?] lines-- this [? pulley ?] line shows us the height of the-- as you know, the height of the alignment. Here you can see just one profile. We have four profiles. And now it's time to create an assembly. We have three types of assembly, a single way, a double way that's full of both left and right tracks-- we have here the marked point that ensured the joint between the two part of assembly-- and a tunnel way.

      So we create the corridor with all the parameters, the type of assembly, and the target surface. And we set all parameters to set all regions, all targets, or what we need. And we have the corridor. Then we have to extract the corridor in DWG.

      So extract the corridor. We set the parameter. We choose what kind of element to extract. And we save the DWG externally. So unfortunately, we don't have yet the possibility to link directly our civil corridor into Revit or to import it as a generic model.

      So in this case, we pass through Dynamo and import the geometry. But Dynamo, out of the box, doesn't manage DWG file. So we had to open the DWG file in AutoCAD and export the SAT file.

      So we open the DWG from AutoCAD. We select all geometries. And we export the geometry, the 3D geometry in a [? SAT ?] file. After that, in a new Revit project with a standard template, we have to set the coordinates. And we do that by importing the alignment CAD file. It's another file, not the same.

      As you can see, the Revit project base point is set to zero. Here so-- a little-- no, it's zero. It's normal. And we have to acquire the coordinates from this CAD. And we check the new coordinates. And we erase the CAD.

      So we open Dynamo. We select the SAT file. And we run the Dynamo definition. And depending on the size of the SAT file, it takes several or a few minutes.

      Now we have the corridor is not really Revit [? family. ?] It's just a direct shape, so it's only geometry. But in this case, we need only geometry to move this information to our GIS.

      It's different with the punctual element. Because here we have linked all the punctual elements. As you can see now, the mass cable, the traffic lights, and so on. And these kind of elements have all the Revit information, not only geometry.

      Now in this third part, we will see how to set up the work environment to quickly plan the work orders and to use this set to go and work on the field. In our GIS Pro, we create a new local scene. We have the default map. And we add a folder connection to create a link with the folder that contains all Revit files in our desktop, for example. ArcGIS needs a link with a desktop.

      So here we have the BIM from Italferr, [? 28-10-18. ?] Here we have all the Revit files we need. Now we have to set the system coordinates. And we assign the same coordinates we used in Civil, obviously.

      So now ArcGIS is charging the new projected map with the UTN zone 32, the same of Civil. Now we have the new map. It's a projected map, not a global map. And-- I'm sorry-- some-- and we turned off the-- we a new detailed map the same we used in Civil, so our DEM surface.

      And now we turn off the world elevation for the terrain-- the default terrain. And now we see we can navigate inside our Revit file. So it's really a Revit file. It's not an IFC or another kind of exchange file. ArcGIS can read directly our Revit file. So we have the discipline and the categories. It's very easy, also, to import this file inside the ArcGIS Pro, just drag and drop.

      And to the left panel, the contents, we see all-- fan all category we insert inside the ArcGIS as a 3D layer, not a Revit element. So we have the 3D layers on the left, and the Revit file on the right.

      Now we take a look on the punctual elements we have loaded-- added. So these elements are Revit elements with all information. So only the corridor has the geometry information. But the traffic lights, switch boxes, mass cable, and also the panel I have whole information from Revit.

      Now to make our scene catcher, we add also the Brescia building footprints. But it's two dimensional-- be dimensional. So we create a virtual 3D representation. And we take the height information of the buildings inside the building. And we create a 3D representation. It's not really 3D. It's just a representation. It's not solid.

      Now again, a little tour inside the tramway-- and now we have to create the scene on the cloud. And to do that, we have to publish on ArcGIS online all the multipatches feature class we need. Multipatch is a 3D element on ArcGIS. We have also other kinds of feature classes, like point, lines, polygon, and so on.

      So we just imported file on ArcGIS Pro. We see here the corridor. But we have not yet converted the Revit information into something ArcGIS can read, edit, and handle. So we export the Revit geometry into feature classes, multipatches. We do that in our geodatabase-- this one. We drag and drop inside the ArcGIS Pro workspace this new multipatch.

      And now we have to share as a web layer this multipatch, this corridor, in ArcGIS online, so on the cloud. We type a name, a summary, a tag, a folder, and a group. We publish. But before to publish usually it is a good practice to analyze the multipatch. But it takes several minutes. So we didn't do that.

      We do the same with the MSR phase. Again, name, and summary, tags, folder, and group, and we publish the DEM surface. We go to the portal, the ArcGIS online. We log in. And we have to create a new local scene. New Scene, and New Local Scene-- it's different to the global scene.

      Now we have the standard map. So we have to add all layers we need, so the DEM surface and the corridors. We have added the map. We can remove the default one. And we search the web layer we created, the corridor generic model. So we had this corridor-- just some second-- and then we can zoom on the corridor. And Save Scene-- again, a title, a summary, a tag, and when we save the scene, we can share this scene with other people inside our team. So the group is-- to choose the group is very important. Because people outside the group cannot see our scene, what we have [? done. ?]

      Here we added also the buildings in an area surrounding the alignment. Because it was very big data. And we have, again, all Revit elements, the punctual elements. For example, this switch box had so many information and also a link to BIM 360 model.

      After that, in the following step we will describe a possible workflow to engage the workers in the field with the use of Navigator and Collector for ArcGIS. So we will prepare a map and a route.

      To create route planning, we have added the work orders, the pink one, the purple one starting from the Revit elements. So every work order point contains a link to the BIM 360 Revit element. We have, again, all the information of the Revit information we uploaded on BIM 360.

      Now we create the route layer. We import-- we have to create the stops. And the stops are the same of the work order. So we have to import the stop from the work orders. And we have now the stops at the same place of the work orders.

      We can choose some details, some information about the route planning. And now we have to run the route analysis to have our route-- preplanned route to give this information to the worker on the field. Now we have to share, to upload on the web, this kind of information, again, with a name, a summary, a tags, and a folder, and group.

      Now, have on ArcGIS online. We log in again. We have to create a new map, the new map for work order from content. We create a new map. And we added all the web layers. So here we have the link to this preplanned route. And we can share this link to our workers, to our group.

      Now we do the same thing with the work orders before we share the route. Now we shared the work orders in order to give to inspectors the possibility to collect and to modify, to edit all the information on the field and to put this information, this modification, inside the cloud.

      So we do, again, the same things. We share as a web layer this information. We publish. Now we create a new map, a new map with a title, work orders, some tag, a summary, and then a folder, and group.

      So now we have the same scenario we had in ArcGIS Pro. But we are in ArcGIS online now. So we have the purple points, the work orders, with the same information we had in ArcGIS Pro, so the link to the BIM 360 in the same element. And now we share this information with the users inside the group we choose. We save, and that's it.

      Now we build a simulation on the field to see a possible use of what we have prepared. So now you can see our handsome actor simulating a normal working day. He received an email with the work order we prepared before. And he starts his task.

      So with his tablet, he opens his email. He taps on the email link. That opened ArcGIS online. And again, he taps on Navigator stop list. Navigator starts. And he has just to start the navigation.

      Now we can appreciate the city of Rome. Of course, we could have chosen, I don't know, a simulation maintenance near the Colosseum. But it would have seemed so unreal.

      Now we are on the switch box. So the operator take a look of the situation of the switch box. He can find all information he needs inside BIM 360 with the link inside the Navigator and Collector. He can make some kind of query, like so he can take some measure. It's a little bit difficult to take a measure here. And he can navigate the information of the element inside the properties. We have all information. We switch back on the collector. And we can start to move on the second stop.

      So from Collector, the ArcGIS environment opened the Navigator. We are on the next step with a traffic light. Here another example of a Revit element inside the BIM 360 with all properties. And here we are, the team on the field.

      MARCELLA FARAONE: Greetings from Rome. OK. Look at again the workflow shown step by step by Paolo. We experimented an alternative scenario, tried to simplify the workflow. And we used-- already with ArcGIS Pro in some way, Civil 3D Revit [INAUDIBLE] and BIM 360 Docs next gen. And we imported the old data into BIM 360 Glue to create the sets of equipment. And then we published the data in Field BIM 360 Classic to make a mapping between set of equipment in order to generate the bar code, QR code, of every single equipment.

      In this way, we can substitute Collector with the app BIM 360 Field and read information of each single equipment, each single element with the direct read. We can direct read the QR code of the element in the field with the iPad.

      In this way, the operator work will be simplified. But the workflow is too much complicated. Because we have to use BIM 360 next gen, Docs, and the Classic. As far as we know, the entire workflow will be implemented into the next gen platform. So to experiment this part again in this way will we wait for the BIM 360, the entire workflow implemented in the BIM 360 Field management next gen.

      Now let's see other example again to see how it's useful, this integration between BIM and GIS. This is a portion of the line [? mount ?] or the red line [? mount ?] underground in Doha. [INAUDIBLE] Also all the tunnels, all the stretches between one section to the other has been modelled-- the structure, the architectural part, and also the equipment. Now putting together the geographical coordinates-- in analogy as already seen in the demo shown by Paolo-- and visualizing the elements, all the information maintenance of each element we can simplify. We can have an effect in maintenance of the mapping and tunnel.

      Just another example of this integration, its regard the underground utilities. During the maintenance of the Tramway lines or the railway lines, we have to involve all the stakeholders responsible for the maintenance of the underground utilities-- aqueduct, the [? sewer, ?] and the public lighting system. And so we can use ArcGIS Pro with first [INAUDIBLE] first analysis to see, to importing the data on the alignment and the corridor to see all the underground utilities involved in the maintenance.

      We can transform this 2D data into 3D data using the functionality feature 2D, 3D by attribute and using the information on the depth values of the pipes. And we can transform a 2D to 3D data in order to highlight the pipes. And we can create a 3D buffer area around the corridor. In this way, you can highlight-- you can see the pipes highlighted in yellow-- all the pipes to be done first doing maintenance work, and all information regarding these utilities and the stakeholders responsible to be involved with them.

      Another useful analysis during the maintenance work could be the network analysis. Especially inside a city, during the maintenance work, we have to interrupt a way that intersects the alignment. And so we can quickly recalculate the route to avoid the issue-- many issues to the traffic. And we can plan these very easily these alternative routes when maintenance, the work site moves along the lines.

      We can use the network analysis also to calculate the best route for the waste management from the work site to the depot site. Also, with a look to the sustainability, we are working inside the city we have to prevent damage from pollution.

      We can monitor in an effective way the lines. We can see now-- we will see two examples. This is the Tramway alignment. And the green area is an area of hydrogeological risk. So merging the data of the project with the map of the hydrogeological risk could help us to prevent flooding in the area around the line, for example.

      This is an example of the project that is in Italferr currently managing. The [? IXP ?] [? railway ?] that goes from [? Fortezza ?] to [? Punto Gardena, ?] two localities in the Northeast of Italy. We were working on the detail design of the high speed rail that goes from this side to this side when the geological department found to the analysis of the picture taken from satellite a body landslide upstream the line the points in red.

      Geological surveys and interferometric data confirmed that the body, the landslide was still active. So the design was changed. The alignment was changed from this to this. But in this, we have also a highway and a conventional line still existent. So an extraordinary maintenance was ordered for the highway and the conventional line near the body landslides to prevent damages in the future.

      Now some points of attention-- we are at the end of this presentation. We are still at some critical points in with technology integration from every platform and the Autodesk software. The issue, if the issue will be solved, we can simplify the workflow and simplify the work of the design, or the construction site [INAUDIBLE].

      For example, we saw the example of an underground utilities. The still difficult to export the three data from the other platform to Autodesk softer like Navisworks, for example, for 3D coordination, or for the design of the station to connect the station equipment to the aqueduct pipe, public lighting system.

      There are still issues, too, as we see, to import the corridors model design in Civil 3D into ArcGIS Pro. Their workflow will be simplified if the integration between Civil 3D and Revit could be enhanced.

      So conclusions-- we saw the benefit of the integration between BIM and GIS and how to get started with a workflow between the two platforms, [INAUDIBLE] and Autodesk, how to monitor in an effective way the lines, how to achieve an effective maintenance, and how to communicate effectively with a team distributed throughout the territory, storing the data in the Autodesk clouds and ESRI clouds.

      Thank you again for coming. Please remember to fill out the survey on this class. Goodbye.

      [LAUGHTER]

      [APPLAUSE]

      ______
      icon-svg-close-thick

      Cookieの設定

      弊社にとって、お客様のプライバシーを守ることと最適な体験を提供することは、どちらも大変重要です。弊社では、お客様に合わせてカスタマイズした情報を提供し、並びにアプリケーションの開発に役立てることを目的に、本サイトのご利用方法についてのデータを収集しております。

      そこで、お客様のデータの収集と使用を許可いただけるかどうかをお答えください。

      弊社が利用しているサードパーティのサービスについての説明とプライバシー ステートメントも、併せてご確認ください。

      サイト動作に必須:オートデスクのサイトが正常に動作し、お客様へサービスを提供するために必要な機能です

      Cookie を有効にすることで、お客様の好みやログイン情報が記録され、このデータに基づき操作に対する応答や、ショッピング カートへの商品追加が最適化されます。

      使用感が向上:お客様に最適な情報が表示されます

      Cookie を有効にすることで、拡張機能が正常に動作し、サイト表示が個々に合わせてカスタマイズされます。お客様に最適な情報をお届けし、使用感を向上させるためのこうした設定は、オードデスクまたはサードパーティのサービス プロバイダーが行います。 Cookie が無効に設定されている場合、一部またはすべてのサービスをご利用いただけない場合があります。

      広告表示をカスタマイズ:お客様に関連する広告が表示されます

      Cookie を有効にすることで、サイトのご利用内容やご興味に関するデータが収集され、これに基づきお客様に関連する広告が表示されるなど、効率的な動作が可能になります。また、継続的にデータを収集することで、お客様のご興味にさらに関連する広告を配信することが可能になります。Cookie が無効に設定されている場合、お客様に関連しない広告が表示される可能性があります。

      icon-svg-close-thick

      サードパーティのサービス

      それぞれの情報で弊社が利用しているサードパーティのサービスと、オンラインで収集するお客様のデータの使用方法を詳しく説明いたします。

      icon-svg-hide-thick

      icon-svg-show-thick

      サイト動作に必須:オートデスクのサイトが正常に動作し、お客様へサービスを提供するために必要な機能です

      Qualtrics
      弊社はQualtricsを利用し、アンケート調査やオンライン フォームを通じてお客様が弊社にフィードバックを提供できるようにしています。アンケートの回答は無作為に選んだお客様にお願いしておりますが、お客様から自発的に弊社にフィードバックを提供することも可能です。データを収集する目的は、アンケートの回答前にお客様がとられた行動を、より正しく理解するためです。収集したデータは、発生していた可能性がある問題のトラブルシューティングに役立てさせていただきます。. Qualtrics プライバシー ポリシー
      Akamai mPulse
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Akamai mPulseを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Akamai mPulse プライバシー ポリシー
      Digital River
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Digital Riverを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Digital River プライバシー ポリシー
      Dynatrace
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Dynatraceを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Dynatrace プライバシー ポリシー
      Khoros
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Khorosを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Khoros プライバシー ポリシー
      Launch Darkly
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Launch Darklyを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Launch Darkly プライバシー ポリシー
      New Relic
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、New Relicを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. New Relic プライバシー ポリシー
      Salesforce Live Agent
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Salesforce Live Agentを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Salesforce Live Agent プライバシー ポリシー
      Wistia
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Wistiaを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Wistia プライバシー ポリシー
      Tealium
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Tealiumを利用しています。データには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Tealium プライバシー ポリシー<>
      Typepad Stats
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Typepad Statsを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Typepad Stats プライバシー ポリシー
      Geo Targetly
      当社では、Geo Targetly を使用して Web サイトの訪問者を最適な Web ページに誘導し、訪問者のいる場所に応じて調整したコンテンツを提供します。Geo Targetly は、Web サイト訪問者の IP アドレスを使用して、訪問者のデバイスのおおよその位置を特定します。このため、訪問者は (ほとんどの場合) 自分のローカル言語でコンテンツを閲覧できます。Geo Targetly プライバシー ポリシー
      SpeedCurve
      弊社は、SpeedCurve を使用して、Web ページの読み込み時間と画像、スクリプト、テキストなど後続の要素の応答性を計測することにより、お客様の Web サイト エクスペリエンスのパフォーマンスをモニタリングおよび計測します。SpeedCurve プライバシー ポリシー
      Qualified
      Qualified is the Autodesk Live Chat agent platform. This platform provides services to allow our customers to communicate in real-time with Autodesk support. We may collect unique ID for specific browser sessions during a chat. Qualified Privacy Policy

      icon-svg-hide-thick

      icon-svg-show-thick

      使用感が向上:お客様に最適な情報が表示されます

      Google Optimize
      弊社はGoogle Optimizeを利用して、弊社サイトの新機能をテストし、お客様に合わせた方法で機能を使えるようにしています。そのため弊社では、弊社サイトにアクセスしているお客様から、行動に関するデータを収集しています。収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID などが含まれます。機能のテストの結果によっては、お客様がご利用のサイトのバージョンが変わったり、サイトにアクセスするユーザの属性に応じて、パーソナライズされたコンテンツが表示されるようになる場合があります。. Google Optimize プライバシー ポリシー
      ClickTale
      弊社は、弊社サイトをご利用になるお客様が、どこで操作につまづいたかを正しく理解できるよう、ClickTaleを利用しています。弊社ではセッションの記録を基に、ページの要素を含めて、お客様がサイトでどのような操作を行っているかを確認しています。お客様の特定につながる個人情報は非表示にし、収集も行いません。. ClickTale プライバシー ポリシー
      OneSignal
      弊社は、OneSignalがサポートするサイトに広告を配置するために、OneSignalを利用しています。広告には、OneSignalのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、OneSignalがお客様から収集したデータを使用する場合があります。OneSignalに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. OneSignal プライバシー ポリシー
      Optimizely
      弊社はOptimizelyを利用して、弊社サイトの新機能をテストし、お客様に合わせた方法で機能を使えるようにしています。そのため弊社では、弊社サイトにアクセスしているお客様から、行動に関するデータを収集しています。収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID などが含まれます。機能のテストの結果によっては、お客様がご利用のサイトのバージョンが変わったり、サイトにアクセスするユーザの属性に応じて、パーソナライズされたコンテンツが表示されるようになる場合があります。. Optimizely プライバシー ポリシー
      Amplitude
      弊社はAmplitudeを利用して、弊社サイトの新機能をテストし、お客様に合わせた方法で機能を使えるようにしています。そのため弊社では、弊社サイトにアクセスしているお客様から、行動に関するデータを収集しています。収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID などが含まれます。機能のテストの結果によっては、お客様がご利用のサイトのバージョンが変わったり、サイトにアクセスするユーザの属性に応じて、パーソナライズされたコンテンツが表示されるようになる場合があります。. Amplitude プライバシー ポリシー
      Snowplow
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Snowplowを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Snowplow プライバシー ポリシー
      UserVoice
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、UserVoiceを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. UserVoice プライバシー ポリシー
      Clearbit
      Clearbit を使用すると、リアルタイムのデータ強化により、お客様に合わせてパーソナライズされた適切なエクスペリエンスを提供できます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。Clearbit プライバシー ポリシー
      YouTube
      YouTube はビデオ共有プラットフォームで、埋め込まれたビデオを当社のウェブ サイトで表示および共有することができます。YouTube は、視聴者のビデオのパフォーマンスの測定値を提供しています。 YouTube 社のプライバシー ポリシー

      icon-svg-hide-thick

      icon-svg-show-thick

      広告表示をカスタマイズ:お客様に関連する広告が表示されます

      Adobe Analytics
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Adobe Analyticsを利用しています。収集する情報には、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Adobe Analytics プライバシー ポリシー
      Google Analytics (Web Analytics)
      弊社は、弊社サイトでのお客様の行動に関するデータを収集するために、Google Analytics (Web Analytics)を利用しています。データには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。このデータを基にサイトのパフォーマンスを測定したり、オンラインでの操作のしやすさを検証して機能強化に役立てています。併せて高度な解析手法を使用し、メールでのお問い合わせやカスタマー サポート、営業へのお問い合わせで、お客様に最適な体験が提供されるようにしています。. Google Analytics (Web Analytics) プライバシー ポリシー<>
      Marketo
      弊社は、お客様に関連性のあるコンテンツを、適切なタイミングにメールで配信できるよう、Marketoを利用しています。そのため、お客様のオンラインでの行動や、弊社からお送りするメールへの反応について、データを収集しています。収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、メールの開封率、クリックしたリンクなどが含まれます。このデータに、他の収集先から集めたデータを組み合わせ、営業やカスタマー サービスへの満足度を向上させるとともに、高度な解析処理によって、より関連性の高いコンテンツを提供するようにしています。. Marketo プライバシー ポリシー
      Doubleclick
      弊社は、Doubleclickがサポートするサイトに広告を配置するために、Doubleclickを利用しています。広告には、Doubleclickのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Doubleclickがお客様から収集したデータを使用する場合があります。Doubleclickに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Doubleclick プライバシー ポリシー
      HubSpot
      弊社は、お客様に関連性のあるコンテンツを、適切なタイミングにメールで配信できるよう、HubSpotを利用しています。そのため、お客様のオンラインでの行動や、弊社からお送りするメールへの反応について、データを収集しています。収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、メールの開封率、クリックしたリンクなどが含まれます。. HubSpot プライバシー ポリシー
      Twitter
      弊社は、Twitterがサポートするサイトに広告を配置するために、Twitterを利用しています。広告には、Twitterのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Twitterがお客様から収集したデータを使用する場合があります。Twitterに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Twitter プライバシー ポリシー
      Facebook
      弊社は、Facebookがサポートするサイトに広告を配置するために、Facebookを利用しています。広告には、Facebookのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Facebookがお客様から収集したデータを使用する場合があります。Facebookに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Facebook プライバシー ポリシー
      LinkedIn
      弊社は、LinkedInがサポートするサイトに広告を配置するために、LinkedInを利用しています。広告には、LinkedInのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、LinkedInがお客様から収集したデータを使用する場合があります。LinkedInに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. LinkedIn プライバシー ポリシー
      Yahoo! Japan
      弊社は、Yahoo! Japanがサポートするサイトに広告を配置するために、Yahoo! Japanを利用しています。広告には、Yahoo! Japanのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Yahoo! Japanがお客様から収集したデータを使用する場合があります。Yahoo! Japanに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Yahoo! Japan プライバシー ポリシー
      Naver
      弊社は、Naverがサポートするサイトに広告を配置するために、Naverを利用しています。広告には、Naverのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Naverがお客様から収集したデータを使用する場合があります。Naverに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Naver プライバシー ポリシー
      Quantcast
      弊社は、Quantcastがサポートするサイトに広告を配置するために、Quantcastを利用しています。広告には、Quantcastのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Quantcastがお客様から収集したデータを使用する場合があります。Quantcastに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Quantcast プライバシー ポリシー
      Call Tracking
      弊社は、キャンペーン用にカスタマイズした電話番号を提供するために、Call Trackingを利用しています。カスタマイズした電話番号を使用することで、お客様は弊社の担当者にすぐ連絡できるようになり、弊社はサービスのパフォーマンスをより正確に評価できるようになります。弊社では、提供した電話番号を基に、サイトでのお客様の行動に関するデータを収集する場合があります。. Call Tracking プライバシー ポリシー
      Wunderkind
      弊社は、Wunderkindがサポートするサイトに広告を配置するために、Wunderkindを利用しています。広告には、Wunderkindのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Wunderkindがお客様から収集したデータを使用する場合があります。Wunderkindに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Wunderkind プライバシー ポリシー
      ADC Media
      弊社は、ADC Mediaがサポートするサイトに広告を配置するために、ADC Mediaを利用しています。広告には、ADC Mediaのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、ADC Mediaがお客様から収集したデータを使用する場合があります。ADC Mediaに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. ADC Media プライバシー ポリシー
      AgrantSEM
      弊社は、AgrantSEMがサポートするサイトに広告を配置するために、AgrantSEMを利用しています。広告には、AgrantSEMのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、AgrantSEMがお客様から収集したデータを使用する場合があります。AgrantSEMに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. AgrantSEM プライバシー ポリシー
      Bidtellect
      弊社は、Bidtellectがサポートするサイトに広告を配置するために、Bidtellectを利用しています。広告には、Bidtellectのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Bidtellectがお客様から収集したデータを使用する場合があります。Bidtellectに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Bidtellect プライバシー ポリシー
      Bing
      弊社は、Bingがサポートするサイトに広告を配置するために、Bingを利用しています。広告には、Bingのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Bingがお客様から収集したデータを使用する場合があります。Bingに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Bing プライバシー ポリシー
      G2Crowd
      弊社は、G2Crowdがサポートするサイトに広告を配置するために、G2Crowdを利用しています。広告には、G2Crowdのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、G2Crowdがお客様から収集したデータを使用する場合があります。G2Crowdに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. G2Crowd プライバシー ポリシー
      NMPI Display
      弊社は、NMPI Displayがサポートするサイトに広告を配置するために、NMPI Displayを利用しています。広告には、NMPI Displayのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、NMPI Displayがお客様から収集したデータを使用する場合があります。NMPI Displayに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. NMPI Display プライバシー ポリシー
      VK
      弊社は、VKがサポートするサイトに広告を配置するために、VKを利用しています。広告には、VKのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、VKがお客様から収集したデータを使用する場合があります。VKに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. VK プライバシー ポリシー
      Adobe Target
      弊社はAdobe Targetを利用して、弊社サイトの新機能をテストし、お客様に合わせた方法で機能を使えるようにしています。そのため弊社では、弊社サイトにアクセスしているお客様から、行動に関するデータを収集しています。収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID、お客様の Autodesk ID などが含まれます。機能のテストの結果によっては、お客様がご利用のサイトのバージョンが変わったり、サイトにアクセスするユーザの属性に応じて、パーソナライズされたコンテンツが表示されるようになる場合があります。. Adobe Target プライバシー ポリシー
      Google Analytics (Advertising)
      弊社は、Google Analytics (Advertising)がサポートするサイトに広告を配置するために、Google Analytics (Advertising)を利用しています。広告には、Google Analytics (Advertising)のデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Google Analytics (Advertising)がお客様から収集したデータを使用する場合があります。Google Analytics (Advertising)に提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Google Analytics (Advertising) プライバシー ポリシー
      Trendkite
      弊社は、Trendkiteがサポートするサイトに広告を配置するために、Trendkiteを利用しています。広告には、Trendkiteのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Trendkiteがお客様から収集したデータを使用する場合があります。Trendkiteに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Trendkite プライバシー ポリシー
      Hotjar
      弊社は、Hotjarがサポートするサイトに広告を配置するために、Hotjarを利用しています。広告には、Hotjarのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Hotjarがお客様から収集したデータを使用する場合があります。Hotjarに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Hotjar プライバシー ポリシー
      6 Sense
      弊社は、6 Senseがサポートするサイトに広告を配置するために、6 Senseを利用しています。広告には、6 Senseのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、6 Senseがお客様から収集したデータを使用する場合があります。6 Senseに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. 6 Sense プライバシー ポリシー
      Terminus
      弊社は、Terminusがサポートするサイトに広告を配置するために、Terminusを利用しています。広告には、Terminusのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、Terminusがお客様から収集したデータを使用する場合があります。Terminusに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. Terminus プライバシー ポリシー
      StackAdapt
      弊社は、StackAdaptがサポートするサイトに広告を配置するために、StackAdaptを利用しています。広告には、StackAdaptのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、StackAdaptがお客様から収集したデータを使用する場合があります。StackAdaptに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. StackAdapt プライバシー ポリシー
      The Trade Desk
      弊社は、The Trade Deskがサポートするサイトに広告を配置するために、The Trade Deskを利用しています。広告には、The Trade Deskのデータと、弊社サイトにアクセスしているお客様から弊社が収集する行動に関するデータの両方が使われます。弊社が収集するデータには、お客様がアクセスしたページ、ご利用中の体験版、再生したビデオ、購入した製品やサービス、お客様の IP アドレスまたはデバイスの ID が含まれます。この情報に併せて、The Trade Deskがお客様から収集したデータを使用する場合があります。The Trade Deskに提供しているデータを弊社が使用するのは、お客様のデジタル広告体験をより適切にカスタマイズし、関連性の高い広告をお客様に配信するためです。. The Trade Desk プライバシー ポリシー
      RollWorks
      We use RollWorks to deploy digital advertising on sites supported by RollWorks. Ads are based on both RollWorks data and behavioral data that we collect while you’re on our sites. The data we collect may include pages you’ve visited, trials you’ve initiated, videos you’ve played, purchases you’ve made, and your IP address or device ID. This information may be combined with data that RollWorks has collected from you. We use the data that we provide to RollWorks to better customize your digital advertising experience and present you with more relevant ads. RollWorks Privacy Policy

      オンライン体験の品質向上にぜひご協力ください

      オートデスクは、弊社の製品やサービスをご利用いただくお客様に、優れた体験を提供することを目指しています。これまでの画面の各項目で[はい]を選択したお客様については、弊社でデータを収集し、カスタマイズされた体験の提供とアプリケーションの品質向上に役立てさせていただきます。この設定は、プライバシー ステートメントにアクセスすると、いつでも変更できます。

      お客様の顧客体験は、お客様が自由に決められます。

      オートデスクはお客様のプライバシーを尊重します。オートデスクでは収集したデータを基に、お客様が弊社製品をどのように利用されているのか、お客様が関心を示しそうな情報は何か、オートデスクとの関係をより価値あるものにするには、どのような改善が可能かを理解するよう務めています。

      そこで、お客様一人ひとりに合わせた体験を提供するために、お客様のデータを収集し、使用することを許可いただけるかどうかお答えください。

      体験をカスタマイズすることのメリットにつきましては、本サイトのプライバシー設定の管理でご確認いただけます。弊社のプライバシー ステートメントでも、選択肢について詳しく説明しております。