Enhancing Labor, Quality, and Prefabrication Through In-Wall Coordination

이 강의 공유하기

설명

In-wall coordination is arguably one of the most complex workflows to manage throughout the whole lifecycle of a project build. But it doesn't have to be. There are many factors that go into designing and building the interiors of any project, and this can become even more complex in projects involving health care and life sciences. In the construction industry, it's not uncommon for the walls of a building to be coordinated by traditionally marking up construction documentation, or by field coordinating MEP rough-in. However, this approach can lead to a lot of RFIs and rework—and an overall quality reduction. Enhancing in-wall coordination through a virtual coordination process will not only improve the overall efficiency of your project build, it will also unlock many prefabrication opportunities for the general contractor and trade partners. And it will provide opportunities for multitrade layout through robotics, combat labor shortages, and greatly increase the overall quality output of the project.

주요 학습

  • Learn the different techniques to managing in-wall coordination through a virtual process, from basic to advanced.
  • Learn how in-wall coordination unlocks many prefabrication opportunities for both the general contractor and the trade contractors.
  • Gain insights into how automation and robotics are used throughout the in-wall coordination process.

발표자

  • Dustin Ridley 님의 아바타
    Dustin Ridley
    Dustin Ridley leads a large group of 40+ VDC professionals in DPR’s southwest region. Dustin works closely with project teams and regional leadership to lead, influence, and empower Building Information Modeling (BIM) and Virtual Design and Construction (VDC) driven project management, process workflow, and field technology deployment in Arizona and Southern California. Prior to joining DPR Construction, Dustin had spent time working at civil, interior design, structural, and architectural design firms as well as freelancing 3DS MAX Vray 3D Rendering before joining the trades side of construction. On the trades side, Dustin spent 5 years modeling and detailing for concrete and 6 years managing BIM at a local electrical subcontractor. Dustin has helped to create a program and maintained for 6 years a teaching position at the Electrical Joint Apprenticeship Training Committee in Phoenix, Arizona, bringing BIM education to local electrical foremen and journeymen so they can better be equipped to be part of BIM & VDC on their projects. These experiences have shaped Dustin’s career path to be equipped and prepared to lead in the construction industry technology as a seasoned veteran with 20 years in the industry.
  • Varun Raja
    Varun Raja is an accomplished technical builder with expertise in leveraging Virtual Design and Construction (VDC) best practices and Building Information Modeling (BIM) tools to advance project outcomes. He utilizes his extensive experience to establish both custom and standardized workflows that fully harness BIM, driving teams towards leaner processes and superior quality construction. With early career experience as an MEP engineer/coordinator, Varun has developed a unique perspective and skill set that enhance project coordination through design thinking and constructive production. As a proficient design integrator, he excels in guiding teams to make informed decisions that improve construction production and facilitate seamless multi-trade coordination. He is a forward thinker who challenges the status quo, constantly seeking more efficient methods to execute workstreams and pave the way for scalable innovations. An innovator at heart, Varun approaches every problem as an opportunity to innovate and solve it efficiently. His recent endeavors in implementing prefabrication solutions through Lean and VDC principles have further strengthened his design integration workflows, making them scalable and templatized.
Video Player is loading.
Current Time 0:00
Duration 0:00
Loaded: 0%
Stream Type LIVE
Remaining Time 0:00
 
1x
  • Chapters
  • descriptions off, selected
  • subtitles off, selected
      Transcript

      DUSTIN RIDLEY: Hello, everybody. Welcome to Autodesk University. Today, we are going to provide instruction on how to implement model-based in-wall coordination, and you will be learning how, through in-wall coordination, we can enhance labor, quality, and prefabrication on your projects.

      That said, I would like to note the technical handout and our presentation. Though full of really great information, it is not meant to be a literal "thou shalt do this" guidebook. Rather, the content itself should give the audience ideas and inspiration on how to implement what makes sense for their projects.

      But first, before we get started, we want to introduce ourselves so you know who your speakers are. My name is Dustin Ridley, and I am the Southwest Region VDC Leader for DPR Construction, and I do have 12 years experience implementing coordination from both the trades and GC side.

      VARUN RAJA: Everyone, my name is Varun Raja, and I'm a little shy of Dustin's experience here, but getting there, and I'm the VDC Manager for the Bay Area region in California. And I see my passion as being a design integrator, where I try to get involved as much left of the line as possible and make a influence change. And then what keeps me motivated is essentially just finding solutions to democratize information to the project team.

      DUSTIN RIDLEY: Awesome. On a final note, I do want to say what I like about Varun and I presenting together is that I represent old-school in-wall coordination, and Varun represents next gen in-wall coordination. And together, we are creating and pushing the boundaries of in-wall to its next evolution. So hopefully, that is something that shines through our session.

      OK, so Varun and I both work for DPR Construction. If you're not familiar with DPR, we are a large commercial general contractor. And one thing I want to call attention to is that we build technically complex and challenging projects, and as such, our core markets lend themselves to benefiting from this more advanced in-wall coordination approach to how we build.

      Additionally, we self-perform our interior framing, and we have 100% VDC adoption goal in our company. So this all marries very well with pushing the industry expectations around in-wall, and this is why we want to share this with you today.

      And one more thing that I want to point out-- the text that you see on the screen here is one of DPR's vivid descriptions on how we approach quality and innovation, which is really about continuous improvement and endless innovation. And innovation is our ever forward spirit.

      So if one were to ask, why do we take in-wall coordination to the level that we do, which is well above industry expectations, it is because we build technically complex projects and it is part of our mission at DPR to drive for endless improvement and to be most admired.

      VARUN RAJA: And a few of the key highlights about our presentation here is we want to make sure you walk away with learning different techniques on managing in-wall coordination. And it could be as basic as we showcase it, or some of the advanced workflows that we're going to be talking about.

      And really, you could see how it unlocks some of the potentials in managing your construction in a more lean and productive manner by unlocking prefabrication and also the robotics and construction. In order for us to also get to that point, you would need some workflows that you could scale, essentially.

      And that's where automation of some of these workflow discussions are going to be part of this presentation as well. That's going to be key to this whole process.

      DUSTIN RIDLEY: Awesome. Thank you, Varun. OK, before we cover some of our more technical aspects of in-wall coordination, it is important to go over some insights on highlighting the why, of why in-wall coordination in the first place.

      It is to improve this. Shown on the screen here is an elevated wall, and these are my mark-ups from nine years ago, when I worked in the electrical trades. I was pointing out missing information, conflicting devices, duplicate devices, and framing needs. And this is just one of thousands of walls on the project.

      Ultimately, through in-wall coordination, we are trying to improve the design intent by bringing the constructible means and methods into the model, versus doing that in the field. And it is to avoid this. And by this, I mean rework.

      What you see here on the screen is a myriad of patchwork fixes from the field. And when we have to do patchwork like this, the cost for every instance can range from a few hundred dollars to a few thousand dollars, depending on project type and situation.

      And that is not even taking into account the other things, such as lost opportunity to focus on moving the project forward instead of doing rework, or the impact to schedule and morale. Additionally, if RFIs are involved with the patchwork fixes, each RFI itself can cost a project up to $1,000 in total administrative time.

      Now imagine thousands of instances of this across hundreds of projects. We are looking at potentially millions of dollars of waste. And it is also to avoid this. [LAUGHS]

      Obviously, this is an exaggeration, but the intent here is to bring attention to what is on the wall is just important as what is in the wall. And there is nothing more disappointing to an owner that to see the aesthetics of their walls not as they imagined. Because after all, it is not what is in the walls or above the walls that the public will see, it is what is on the walls in the room that they will see.

      And it is ultimately to avoid this too, a long, tedious punch list, which ultimately costs the project time, money, and resources. Not to mention, again, if we are sending teams back to do rework, we are losing optimization of time and energy to move the project forward.

      And so the more that we can focus on preventing issues and installing work the first time, the less time that will be spent out looking for issues. So now, a reflection of the previous slides. I do recall, and I want to bring up this very short story of a time that I spent with Mr. Jeff here on the screen, on a project in Tucson, Arizona.

      He was expressing a healthy dose of frustration with me regarding the lack of information and coordination of the architectural elevated drawings for his project. And in my efforts to calm Jeff's nerves, I explained to him, this is why we have model coordination environments in the first place, is to address the design intent to constructible means and methods gap in the industry.

      And I remember Jeff pausing for a moment and thinking. And then he said, well, if a picture is worth a thousand words, then I guess a 3D model is worth a million. And I think this was his way of accepting our current situation and saying, OK, let's use this model environment to solve these problems.

      This conversation stuck with me for quite some time. And so speaking of 3D models and a million words, here's a big, beautiful 3D model, which is a healthcare campus in Phoenix, Arizona. Beautiful model.

      However, if we zoom in a bit closer, we begin to see there's more to this beautiful 3D model, which are these complex, busy environments that we call rooms. And the more detail we put into these rooms, the more we can do with it. And the exam room shown here on the screen is one of thousands of rooms on this hospital campus.

      Now, if we zoom in a little bit more to see inside these rooms, we begin to see there is more going on here, such as wall protection modeled, medical equipment modeled, framing modeled, wall devices, wall backing strips, conduit sealing devices, and fixtures and et cetera. There's a lot going in here. These are busy environments.

      And if we zoom in one more time to a single wall, what we see here is infill framing models, conduit routed up vertically through the wall, devices modeled and located to correct dimensions, conduit from devices stubbing above the modeled ACT ceiling, and so on. And really, the value at this level of detail brings, is that it informs on design optimization with constructible means, quantities pulled from the model, cost management opportunities, schedule optimization, and prefabrication opportunities, which ultimately improves our productivity.

      However, if we don't take the model environment seriously, as a one source of truth, you get these dull and less environments-- less useful environments, excuse me. Here I have removed all the in-wall focus scope that I was showing you on the previous screen, and the other related scopes to leave just the overhead MEPF. Quite lackluster, isn't it?

      So what we end up with really is a bunch of question marks. That's not good. So what are we really trying to improve here? In the traditional approach, there is a tendency to take the design documentation of elevated walls and to go straight to construction, wall framing, and roughing.

      However with a fuller, more complete room environment through in-wall coordination, we can achieve better certainty on what we are building through constructability reviews, fuller coordination with more detail, and detailed elevated drawings, and therefore, having certainty on what we are designing and building and driving quality and efficiency.

      So to recap, why do we do in-wall coordination? Well, it is to achieve the highly detailed, elevated wall details that you see on the right of the screen here. It is to increase quality and reduce rework, to optimize design and labor utilization, to facilitate better overall model coordination experience, enable prefab opportunities, and ultimately deliver a superior experience and as built model to the client. This is why we do this.

      And on a final note, in the Southwest region of DPR Construction, we really tried our best to track some data on six of our larger healthcare projects that we have implemented in-wall coordination on, and this is as of recent as the last few years. In total, we have coordinated over 13,000 walls. We have coordinated over 35,000 devices and we have created over 4,000 elevated sheets and we have identified over 3,000 issues.

      And these are issues, not clashes. And so just think of this. If just 50% of those issues made it to the field and resulted in RFIs and rework, we are looking at several million dollars worth of cost to the projects in the form of waste, potentially.

      OK. So now we know why in-wall coordination, the next topic is getting buy-in. And this is an important topic to cover because we get to more of the technical aspects of the project, the more buying you're going to need. And what I mean by that is you can't just start a project and go out and start doing in-wall coordination. There's a lot of planning and buy-in that needs to happen upfront to be successful in this.

      This is because making the transition from traditional overhead coordination to a fuller, more complete, total room coordination approach can be very complex, especially if every wall in the project is given coordination time. However, there is a meet in the middle approach, and that is depicted here in the middle of the screen, which is what we call Traditional Plus.

      And this is where we would plan for traditional overhead MEP coordination, however, with selected critical walls identified to implement in-wall coordination on, such as head walls, foot walls, full height walls, precast panels, et cetera. These type of walls often will be part of various prefabrication strategies.

      That said, to implement advanced in-wall coordination in the more total room approach that we're describing here, where all walls are addressed, there are some very important key factors and steps for success that need to be taken into consideration, which I will talk about next.

      So here, we've done our best to outline the 13 key steps to achieve advanced in-wall coordination on your project. Admittedly, some of these steps are steps you would take on any project leveraging BIM, regardless if you're doing in-wall coordination or not.

      And in those instances, you just want to make sure to include in-wall in the documentation and dialogue. However, some of the other steps are more complex and nuanced and need further explanation, such as synergy and scope buyout. So let's get into it.

      Step 1, synergy. What does that mean? This is essentially the first step that precedes all others, and it is the most important step. And it is the most important step because in order to achieve advanced in-wall coordination in the first place, there needs to be synergy or alignment between all the players on the project, which include the owner, the architects, GC, engineers, trades, and vendors, which I'll explain in a little more detail in the next slide.

      Step 2, scope buyout. This is also a very important step. This is where you need to be very clear on the ask of your trade partners at bidding, which we'll go into more detail in the next couple of slides. Steps 3, 4, 5, and 6, you're going to do these things anyways on your project if you are implementing them, or at least I hope you are.

      That said, you just want to include the in-wall related details in those steps. And if you want more information on that, I would recommend referring to our technical handout, which covers these steps in a little bit more detail there. Step 7 and 8, sheet management and prefab strategy. We have actually chosen those two steps to cover in more detail in this session today, so we will talk about that a little later in this presentation.

      Step 9, review and sign off strategy. The one thing I will mention here is to ensure you have upfront discussions with the design team on the in-wall coordination plan and review expectations. Sometimes the expectations can catch the design team off guard and you risk getting add services to the project from the design team if they find themselves answering questions outside the normal RFI workflow.

      Step 10, change management. Here you want to make sure to have a custom workflow to address PR changes or RFI changes, especially if walls are be constructed at the same time design changes are being made. It is very easy to fall behind pace of construction and get confused with revisions and updates. So you want to have a little bit more attention to how you're addressing changes to the design when you're doing in-wall coordination.

      And step 11 and 12, bend the field and QA/QC. We have also chosen these two steps to cover in more detail in our session today, so you will hear more about that a little later. And lastly, step 13, and this is really the last stage in the form of a handoff. And if we do all the other 12 steps, then the owner is going to get a superior product, an as-built turned over to them, well above their expectations.

      So congratulations. We've gone through the 13 steps. OK. As promised, we were going to talk about step 1 a little bit more, which is synergy. And really, this is a prereq, as I would call it, to getting to the other steps. This is about having proper alignment with all the parties that need to have buy-in to implementing in-wall coordination.

      And if any one of these things are missing, this will be challenging to execute. So BIM culture. Does the general contractor have a good BIM culture? Do they believe in BIM? Do they build from the model? Do their leadership support this?

      You want to make sure that this is one of the very first things that exist when evaluating in-wall coordination. And through that BIM culture, does the pre-construction teams understand the value of implementing in-wall coordination? After all, they will need to bring on trade partners that can support it, and trade partners that will price to it.

      And pre-construction teams will need to evaluate if the project budget overall can support it. Buy-in with owner and design teams. How does the owner view in-wall coordination? Do they see value on providing that level of detail to their project in their walls?

      Does a core market and project type support it? Will the design team be part of the review discussions? Will they answer your questions in a timely manner? You want the buy-in there.

      BIM as a source of truth. Even if you have a good BIM culture, a GC, sometimes that may not trickle all the way down to a project team. They might have other ideas. So you want to make sure that the project team actually building the project sees BIM as a one source of truth and will build from the model.

      Technical capability of your trade partners. You want to make sure to evaluate if your trade partners have on-site resources, in-house resources, versus off-site resources, because this can have impact on how the flow of communication happens and the speed at which that happens. This becomes very crucial when design changes start happening with real-time construction.

      Do they have the resources to support the work and the technical capability? Because it can be complex. Vendors. Do we know what we need from them? For example, medical equipment vendors, there could be an opportunity in which we need better models from them to include in these rooms that we're coordinating. And if they can't do that, we will identify that as a scope gap that we pick up.

      All in all, do you have the resources to do this? Depending on the intensity and complexity of the in-wall coordination effort, you might need a full-time resource from a GC standpoint to execute the work. Or maybe it's a split between a PE and a VDC engineer or VDC manager, and the same questions can be applied to trade partners.

      So you really want to evaluate all these things. However, hope is not lost. If you're not checking all these boxes, there are ways to manage in-wall coordination internally as a GC, which we will highlight at the end of this session. But definitely want to make sure that these things are very important to evaluate.

      Step 2, scope buyout. We said we're going to talk about this a little bit more. And this is really about. Making sure we're articulating to our trade partners at bidding what we expect from them. And this is going to happen after we all agree we're going to do in-wall coordination, now we need our buyout trades to support this.

      And one of the things that has been very helpful for us is just to think about the rooms that we're going to be building and what is in the room. And then we basically just matrix out all of that into a model responsibility matrix and assign expectations on who we need model content from.

      So you can see on the right here of the screen, we have mechanical with modeling expectations that we are needing for them. We have electrical and framing with modeling expectations that we can articulate to them. We have also identified in this particular example, scope gap.

      We couldn't get the particular trades that would provide those list of items to carry that within their budget, so we identified that as scope gap and needed to address this internally. And of course, there's going to be items that the design team is going to provide that get incorporated to that bottled environment.

      And we need to ensure who's reviewing all this work from a model and sheet review standpoint. So this really helps articulate what are we needing and to what level of detail and development and when. Also, on another note, I really want to emphasize the framing model.

      This is probably one of the single most important pieces to have included in your scope at buyout, is a 3D framing model by the framers. This is a skeleton into which coordination and in-wall coordination depends on. In fact, even if you were not doing involved coordination on a project, just having a framing, a detailed framing model, part of your BIM coordination process will enrich it in many ways that are lesser known.

      For example, infill. A lot of teams will model the kings and corners and bottom and top track of framing, but we ask them to include infill as well. And it's an easy thing to do. It's just a few more button clicks and you get the infill in there.

      And really, what that does is it provides the MEP trades opportunities to weave their onesie twosie pipes between the framing so that is done ahead of time, rather than having that conversation in the field. So we're optimizing that. So in coordination itself, it improves. But for in-wall, we really need to see this framing to know where to position devices and how to block out openings. It's very important.

      So once we get all this organized, you really can start packaging this up in your VDC execution plan, your exhibits, an A2, and have that all stacked correctly so that you're buying things out with clarity and accountability. OK, so we're going to move on to sheet automation, which is what I find very exciting.

      If I had this many years ago, this would have made my life much easier. And the reason we chose sheet creation for today's instructional step-by-step is it can be very tedious and time consuming. So we want to pass this off to Varun and he's going to walk us through this and how to make your life easier if you're doing sheets.

      VARUN RAJA: Thank you, Dustin. Thank you for walking us through such detailed step-by-step process to get us to that starting point of actually in-wall coordination itself. And now that we've all understood what needs to be done way left of the line to have that successful coordination process, let's really talk about the process itself and how to scale that, and really understand what are the necessary key ingredients to have successful in-wall coordination process.

      So I want to start here with the understanding, the first point right here, which is removing silos. And what I mean by removing silos here is essentially moving away from a Bluebeam session to ACC. So this snapshot here shows you a workflow where we have posted all of our spool sheets into the collections module of Autodesk Construction Cloud sheets module.

      And how this removes silos is-- nothing against Bluebeam, but when you have a workflow that might be focused but it's restrictive to the broader team, it creates those silos and it's not a collaborative environment anymore. What is really powerful here is as you go through the weekly cadence, the sheets themselves version, and you could really track the progress of your coordination and look at the history of why a certain device has moved, or where it is right now.

      And that's the power of removing that silos and making sure you start with the collaborative environment. And moving on to the next one. It's really talking about how do we enable easy access to this information.

      In order to understand this process, we are leveraging the ACC assets module. And what you see here in the screen is a snapshot of a floorplan that within which each room is tagged as an asset, and we connect that asset to the spool sheet that we're going to be using for in-wall coordination process itself, where we'll be able to mark up issues.

      Everyone consumes information in a different way, but within the AC industry, I think we can comfortably say that we all understand floorplans better, and we consume information in this format. And this would be something that you really need to think through and see if this is the best fit for your project team as well.

      So once you have really talked about understanding how that easy access to information workflow is, next, it's about creating those spool sheets and how do you automate that package creation. What you see here in the snapshot is the beautiful spool sheet that we've created for each room to help us enable that in-wall coordination process itself.

      And in order to achieve this, we've used a plugin called Glyph within Revit, and I'll dive into a step-by-step process on actually how to get there in an automated fashion. And the last and final process is you essentially need to make sure you have a tracking methodology in terms of understanding where you are within the coordination process itself.

      Again, we are leveraging the ACC assets module to keep track of the coordination progress. And what you see here is essentially different colors with each color connected to a particular status, milestone, or a handoff within that process itself.

      And now, let's jump into that sheet automation that we all are eagerly looking for. So in order to get to that beautiful room level spool sheets, we'll have to do some initial setup. And what the first initial setup entails is around the view template alignment.

      And it's exactly what it means, which is you pull up a panel view, like what you see in this image, and you collaboratively have a discussion with the participants of this coordination meeting to make sure you're aligned with respect to the devices that you want to see in these views, and maybe the color scheme of these devices that makes sense for the team itself and makes your coordination process a little bit simpler.

      And by color scheme, I mean, really diving into the details, right? So often, you will find while doing in-wall coordination, you'll ask questions about these equipments within the room layout. If the equipment such as mobile, if the equipment is fixed. If it's fixed, does it have a utility tie-in, or even if it's on wheels, does it have a utility tie-in or does it need utility tie-ins?

      So this could go on with so many combinations. And in order to answer these questions in a more visual manner, it's good to have that setup kind of done in the very initial stages itself. And what you see in this image is exactly that. We have categorized those different type of combinations into different work sets, and we've assigned a color so that visually you will be able to understand what you're looking at.

      So once you're done with this view template setup, the next setup is around the room boundary settings. And this is really key for actually using the Glyph module because that's how Glyph understands the constraints of a room. And when you try to create these packages by room, the trigger point is essentially through the room boundary itself.

      And we try to get these room boundaries from the architectural model where we copy monitor them into our file. Maybe we'll throw it in a different work set so it's a little bit organized. One key step to remember once you have done the copy monitor is essentially pick an elevation view of a particular room boundary and make sure the expense of that room boundary goes from floor to floor.

      Because when you create a panel view, you would want to see the entire panel itself and you don't want anything cropped out. So once you're done with the initial setup, now we can really talk about how to essentially use Glyph to automate these packages. So this is essentially the first step, and this is the interface of what Glyph looks like.

      And Glyph makes it very easy for us to actually get to that final point of spool sheet creation. So they have a module called As Creating Bundles. What you see here in this example is we created a bundle called Inwall Coordination bundle, and its bundle is nothing but there are several automated tools just combined together, put in a sequential operation.

      So here, we've got three automated tools within the bundle which starts from creating the views by room, followed by creating the sheets for that room, and finally, placing those views that you've created into the sheets that you've created. So now, let's understand each step in a little bit more detail and see how the workflow entails.

      So moving into the next step here, which is about creating those views. Here, in this example, I've picked creating a floor plan view. So remember our first step where we talked about getting that view template aligned, that's essentially what you are selecting what it calls out here for room QC plan view. You essentially select your view template.

      So once you're done with that, we need to make sure to select the call out instead of separate views, so that you don't get disjointed views but instead, you have a view that's created, that's connected to the parent floor plan. And finally, you want to make sure you come up with a naming convention so that you're consistent.

      Once you're done with this, we move on to the next step of creating the sheets. Now, here, it's really critical that you select this option where you're tying a connection between this ongoing step to the previous step so that Glyph understands it's a sequence. So make sure you hit that output from previous task.

      Once you're done with that, now you really define the properties of what this sheet is going to look like. It's recommended that you have your own title block. Here, you could see we have selected DPR's own title block format, followed by coming up with a naming convention for these sheets so that it's consistent.

      Once you're done with that, we move on to the final step of actually placing these views on the sheets themselves. So remember to again, make sure you are selecting the output from previous tasks so that again, Glyph understands that it's a sequence. Once you're done with that, now we really dive into the details of defining what the sheet really looks like.

      So what you see here in this graphic is Glyph giving us options to define the zones of what the sheet can be divided into to help place those views that you've created. So in this example, you could see there is seven of different zones in a sheet. And this is essentially, if you hit that pencil button icon, you can really define your zones.

      If you hit Next, you can see the highlights. And then, Glyph also gives you an option where you can actually attach a particular view type to a particular zone as shown in this example. Like I always prefer the floor to be in the center, so that's something that I could be able to define it, which is really convenient.

      So once you're done with these settings, you're really good to go, and you hit that play button. Actually, don't. What we have found out with a lot of trial and error is Glyph takes a little bit lengthier time to process when you have all of the related trade Revit links turned on.

      And since we have already defined our view template settings, we should be OK to unload them, except for the architectural file, and then hit the Play button. So this actually really improves the efficiency by almost 80%. So once you're done unloading and when you hit that Play button, your sheet is created, and it looks something like this.

      Not to worry about it. Now all you have to do is go back to that Manage Links, and then hit Load, and then your sheet will look something like this, where you have all the relevant content and you are achieving this at a much faster pace with greater efficiency.

      So now that you've seen how you could essentially create these amazing spool sheets, you could really scale this process across projects to give you that opportunity to implement in-wall coordination. And why this matters is you'll start seeing this directly or indirectly, that it unlocks some of the opportunities to improve production on site.

      So let's dive into how exactly this unlocks some of the prefab opportunities and how you can manage this process through ACC assets. Over to you, Dustin.

      DUSTIN RIDLEY: Awesome. Thank you for Varun for making my life easier. [LAUGHS] OK, so how is prefabrication improved by in-wall coordination? Well, there are two avenues to prefabrication, and that is off-site prefab and on-site prefab.

      And when we think of in-wall coordination, a lot of off-site prefab products that come to mind are headwalls, foot walls, exterior wall paneling, precast panels, modular pods and et cetera. And the one common thread that all of these products have is doing really good, detailed in-wall coordination. It's really kind of a must.

      So we also have use cases of doing on-site manufacturing of head walls and foot walls, which you can refer to in our technical handout for more details, because we actually spent some time detailing that out. Those steps, which also require detailed in-wall coordination. It was vital to the success and execution.

      Now, that being said, it is true there is a lot of focus in the industry on what a general contractor can prefabricate as a product and how we can design to this prefab. However, I think we can give more attention, even in the most smallest ways. We really should be thinking about these things.

      When you move beyond selected critical walls to prefab to a more total room coordination approach, you can then truly unlock and enable any prefab opportunities that you can think of, such as black boxes for electrical. When you have the level of detail that's shown here in the 3D model image to the left and multiply it across the entire project, you can then truly plan for, quantify and strategize for prefabrication of anything.

      In fact, the list that you see here to the right of the screen is a list of 85 different use cases for trade prefabrication from a recent healthcare hospital we built. Pretty amazing, if you ask me. So here are some images of those brief application opportunities for the trades on this hospital project.

      You're seeing light fixtures that were prefabbed, electrical panels, conduit racks in the overhead, zone file boxes and plumbing, and so on and so forth. Not really in-wall related, but this next image is.

      What you see here in the image on the top is a bunch of containers that are on wheels with prefabricated components for in-wall put in them, and they can be wheeled to the rooms that they associate with in terms of the elevated drawings that have been created. So to be able to quantify this and prefab this ahead of time, whether it's on-site or off-site, really is a powerful thing to have.

      VARUN RAJA: And what we have also learned is that in order to be successful in these pre-fabrication efforts, it's very important to have a detailed step-by-step process written out, similar to our in-wall coordination step-by-step process. So what you see here in the snapshot is essentially that.

      At a high level, we have categorized it into two different buckets. What you see in yellow is the physical action itself that involves putting the panel together. And what you see in blue highlights are an ACC asset action.

      Because to track the production flow of a prefabricated panel, we have used the ACC asset module itself, where it starts by scanning a QR code that enables the access to this spool sheet through that asset module, and it captures the handoff between different teams through the status workflow.

      And you'll start to see that in the next image on how the end product looks like. So the fruits of having a detailed in-wall coordination is essentially what you see in this picture, which as a coordination process is efficient and the tracking progress is efficient, and all of that tying together. So this is essentially, each panel here and colors are representing the status of where that panel is within that production line.

      And that panel is linked to, as an asset, through the native authored file itself. So when you select a panel, you can actually see the spool sheet that was used to build it and also a reference image that the crew took during the handoff for better documentation. And what you see here is essentially that we have detailed what each status means and essentially, it is to capture that handoff between the teams.

      So when you pull up a detailed activity log of a panel E2-621, as shown in this example, you could really see the flow of that panel through the production line from start to end. And with the timestamp. So you could take this data and find out the production of your production line in a very easy manner. And you don't have to spin up another dashboard to do so.

      Now we've seen that how all of this ties to unlocking some of the opportunities around prefab. On a similar note, we want to talk about how doing an effective in-wall coordination and planning for it actually helps us unlock some of the robotic layout capabilities. Over to you, Dustin.

      DUSTIN RIDLEY: Awesome Thank you, Varun. So this is an area that is pretty exciting because in this part of the session, you start to see the byproducts of doing great in-wall coordination. And in this example, the images on the right, what you see is pony walls that have been detailed, and we leverage Dusty Robotics to go lay that out.

      Well, where we're taking this a step further is, OK, if we're doing in-wall coordination, how else can we leverage this for multi-trade layout? And this is where through in-wall coordination, you have certainty on device placement, in terms of elevation and horizontal position.

      You can get information related to the MEP blockouts in the framing and backing strips and other information. So that's where we really start to see the benefits of in-wall coordination come out, is when you can leverage robotic total stations and Dusty Robotics for layout.

      And this is a benefit, not only to the bottom track layout of the walls, but you can start to lay out sleeve penetrations and device locations and elevations, and block out openings in the wall. And so we are really starting to explore different ways how in-wall coordination can benefit the BIM to field process.

      So we touched on prefab strategy and we touched on Dusty Robotics as great byproducts of doing good in-wall coordination. Another area we're actually very excited to show you is how we're leveraging augmented reality for QA/QC. And there are many different ways you can think of to leverage augmented reality, but the one that we're going to focus on today is in-wall QA/QC, with AR.

      And what would we look for in a QA/QC effort with AR? Well, it's incorrect in-wall device locations and in-wall devices installed but not shown in the model, incorrect stud spacing and framing openings, incorrect in-wall pipe stub ups, and so on and so forth.

      If we have this information in the model and we have a fully coordinated room, why not take that and overlay it to the field to quickly see if we have deviations? So Varun's going to take us through how we're doing that and what products we're using to do that.

      VARUN RAJA: Thanks, Dustin. That's essentially it. We want to make sure there is a way for the project teams to access information in a very easy fashion, and they're not really struggling to get there. What you see here in the video is essentially how easy it is to pull up your phone and scan maybe the two QR codes at a minimum.

      And once you've done that, you essentially have the overlay of a coordinated model, and then you can toggle different layers as you need based on what you want to review. That's essentially it. You're essentially providing a tool that's easy to use and easy to deploy, and essentially helping that QA/QC workflow to be very successful.

      In order to do this, we want to also make sure on the left of it, the setup is also very easy and scalable. And that's what this three steps kind of detail out in a very easy manner for us to understand. It starts with that setting up of the model itself, and then followed by how you correlate the model to the real world using QR codes that you saw in the video.

      And finally, the most important one is really finding the champions that really help push folks on the project team to leverage this technology, and actually spend some time training the folks to use this. So let's look into some of the details of how exactly the setting up of the model within the platform called Sitelink works.

      So what you saw in the video in the previous slide, is again, from Sitelink. And this is one of the platforms that DPR is invested in and is currently deployed in several job sites. That's very active.

      And you can see some of the formats that this platform supports and it essentially starts with the integration with ACC. That's what is the key differentiator for this platform, that it integrates well with the Autodesk Construction Cloud itself. And with that ability, we are able to pull all the models into the Sitelinks portal as individual layers that you could turn on and off.

      So once you're done with that model setup, now you have to try to correlate that to the real life. And the way we do that is with these QR codes. And the QR codes are either pasted on the floor or on the columns with a minimum spacing of anywhere between 12 to 15 feet.

      And the reason we maintain that distance is to control the level of drift and the accuracy of the model alignment itself. And what Sitelink kind of makes it easier on us is it gives you that feedback on exactly how accurate that model alignment is, and how bad or good that drift is. So depending on that feedback, you can really adjust your placement of the QR codes itself.

      And you can also get creative by using Dusty to print out those QR codes on the floor, as you see. So now, what to do? Once you have that set up, you're ready to start that QC process.

      So one such example that I want to share with you folks is, at a recent project site, we established this workflow where two weeks prior to something getting installed, we want to do a field walk with this tool in our hand and make sure we have a better understanding of what's coming up, and see if we can spot any issues. Well, we did.

      In this walk, what happened was we spotted a misalignment of a plumbing riser against the layout of the drywall itself. And the way we track the progress of that issue resolution is through that pin that you see in the first image, which we call it as a Sitelink. And what's neat about it is it integrates very well with ACC issues.

      And once we have a resolution, you can see the model is updated and the ACC issue gets updated. Throughout all this process, the entire project team is kept informed. Everyone has transparency towards what's happening on the jobsite, and this is a very efficient way to manage your field issue control.

      So that's just one example. Another example, maybe not related to in-wall, but you could obviously use it for in-wall QA/QC, is this is another recent example where our site superintendent kind of felt the layout of the mechanical shaft was a little funky and it was not what was planned.

      What's the next step that he has to do in order to verify? Obviously, they pull out a tape measure and try to measure the layout itself against something that is a fixed reference. Well, in this case, the sheer wall that was closer to the layout itself happened to be that reference.

      But once you're done with that measurement, he really has two options. Either he could verify that himself by looking at it and comparing it to the shop drawings, or he can delegate that over to a PE or a VDC resource, because we all know how busy the superintendents are.

      Well, what's a different way to approach this problem and to resolve this? What you see here is another example of how you could utilize the existing hardware on your phone within the Sitelink app itself. In lieu of taking markups, you can actually scan the environment using the LiDAR scanner.

      And that's what you see in the video. Once you're done with that scanning process, you can publish that to the cloud. And then from that point onwards, if you go to the next slide, you'll really see the evolution of how you could go from having to do these markups to essentially, doing the comparison yourself by comparing it with the model.

      So in this snapshot, you see the point cloud data of the ground compared against the coordinated model. And really, the key here is the superintendent himself is able to do all this in the same day without having to involve an additional resource, or having a lag in actually understanding if this actually is a problem.

      Fortunately, this was not a problem. Everything was OK. We moved on. So you could see how you could really connect the dots here with in-wall coordination.

      DUSTIN RIDLEY: Awesome. Thank you, Varun. So, exciting stuff and you might be asking, OK, where is this going? Here's an image of something I shared earlier on in our presentation. And this is a ACC punch list that we were doing for electrical scope. And if you look at the top right picture or document, what you're going to see is some in-wall framing.

      And then to the very left of that is an iPad with the elevated drawing, which represents our coordinated in-wall efforts. Now, what they did, and we're very happy that they did this, is that they're bringing up the drawing on their iPad, and they're looking at the wall and making comparative notes.

      Where this AR technology is going is instead of doing that, you can just bypass that step and just overlay the model to the wall itself in the field and create the ACC issues right there. And that is going to continue to enhance and evolve how we're doing in wall coordination and QA/QC, and leveraging augmented reality to do that. So very cool stuff.

      So I promised I was going to talk about this and this would be quick. The basics. What do you do if you're not DPR? What do you do if you're not a self-performing GC of interior framing? What do you do if you don't have 100% VDC adoption culture in your company?

      What do you do if you don't have a framing model? So hope isn't lost. There are methods you can take to implement in-wall coordination on your own, as low hanging fruit. These two examples represent two examples done by a MEP coordinator and a PM at DPR.

      On the left here, this is done on a smaller project. This was done several years ago, where the project didn't have a budget to provide to the trade team to do in-wall coordination. So the MEP coordinator was determined not to let this be a barrier and they, in AutoCAD, modeled and detailed their own framing, and they overlaid all the electrical devices in the wall by doing a cross disciplinary review of the documentation for the project.

      And they leveraged this to answer questions, to request information through RFIs, and to coordinate with the trade partners and owner. And this was helpful to the project. And on the right, this is the exact same process, but done with our strategic partner vConstruct.

      And we employed them on this project to model the framing and overlay the electrical devices in the wall and create these elevated details. And this enabled the PM to do the same thing, to ask questions about the interior framing and electrical devices and information that may have been missing conflicting. So this was something that they did on the project themselves.

      And now, I wouldn't recommend doing this on a 500,000 square foot hospital project, because this would be very tedious. But on a smaller project, you can absolutely do this. So the most important thing to take away here, as long as you're putting attention to in-wall coordination in any effort, there's going to be value to your project.

      What we're doing today, mostly is showing you how to implement advanced in-wall coordination. So that being said, this concludes our session. And on a final note, we just wanted to say that we truly believe at DPR in the value of leveraging technology and construction on all projects, regardless of size.

      And this is something that resonates from our presentation last year, small projects, big VDC. We believe in endless innovation and continuous improvement. And this really feeds our Ever Forward spirit. And so how we approach in-wall coordination at DPR is absolutely industry setting and we hope that we inspired you to try something new.

      And if anything that you walk away with today is, don't look at this as a literal, you have to do every step this way. If you can just walk out of this session today with a couple new ideas on how to approach in-wall coordination and leverage technology to do that, or to try something new, then we see this as a win and an improvement to the industry. Varun, any final thoughts?

      VARUN RAJA: No, I think you summed it up pretty well. It's essentially, hopefully, inspired you enough that you either fall in the bucket of oh, this is really overwhelming, or you really say, I have a good guiding book now to refer to in-wall coordination. Either way, we wanted you to at least start having the thought of implementing in-wall coordination, and this is like your first step to maybe helping you to do that.

      DUSTIN RIDLEY: Awesome. Thank you.

      VARUN RAJA: Thank you.

      ______
      icon-svg-close-thick

      쿠기 기본 설정

      오토데스크는 고객의 개인 정보와 최상의 경험을 중요시합니다. 오토데스크는 정보를 사용자화하고 응용프로그램을 만들기 위해 고객의 본 사이트 사용에 관한 데이터를 수집합니다.

      오토데스크에서 고객의 데이터를 수집하고 사용하도록 허용하시겠습니까?

      오토데스크에서 사용하는타사 서비스개인정보 처리방침 정책을 자세히 알아보십시오.

      반드시 필요 - 사이트가 제대로 작동하고 사용자에게 서비스를 원활하게 제공하기 위해 필수적임

      이 쿠키는 오토데스크에서 사용자 기본 설정 또는 로그인 정보를 저장하거나, 사용자 요청에 응답하거나, 장바구니의 품목을 처리하기 위해 필요합니다.

      사용자 경험 향상 – 사용자와 관련된 항목을 표시할 수 있게 해 줌

      이 쿠키는 오토데스크가 보다 향상된 기능을 제공하고 사용자에게 맞는 정보를 제공할 수 있게 해 줍니다. 사용자에게 맞는 정보 및 환경을 제공하기 위해 오토데스크 또는 서비스를 제공하는 협력업체에서 이 쿠키를 설정할 수 있습니다. 이 쿠키를 허용하지 않을 경우 이러한 서비스 중 일부 또는 전체를 이용하지 못하게 될 수 있습니다.

      광고 수신 설정 – 사용자에게 타겟팅된 광고를 제공할 수 있게 해 줌

      이 쿠키는 사용자와 관련성이 높은 광고를 표시하고 그 효과를 추적하기 위해 사용자 활동 및 관심 사항에 대한 데이터를 수집합니다. 이렇게 데이터를 수집함으로써 사용자의 관심 사항에 더 적합한 광고를 표시할 수 있습니다. 이 쿠키를 허용하지 않을 경우 관심 분야에 해당되지 않는 광고가 표시될 수 있습니다.

      icon-svg-close-thick

      타사 서비스

      각 범주에서 오토데스크가 사용하는 타사 서비스와 온라인에서 고객으로부터 수집하는 데이터를 사용하는 방식에 대해 자세히 알아보십시오.

      icon-svg-hide-thick

      icon-svg-show-thick

      반드시 필요 - 사이트가 제대로 작동하고 사용자에게 서비스를 원활하게 제공하기 위해 필수적임

      Qualtrics
      오토데스크는 고객에게 더욱 시의적절하며 관련 있는 이메일 컨텐츠를 제공하기 위해 Qualtrics를 이용합니다. 이를 위해, 고객의 온라인 행동 및 오토데스크에서 전송하는 이메일과의 상호 작용에 관한 데이터를 수집합니다. 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 이메일 확인율, 클릭한 링크 등이 포함될 수 있습니다. 오토데스크는 이 데이터를 다른 소스에서 수집된 데이터와 결합하여 고객의 판매 또는 고객 서비스 경험을 개선하며, 고급 분석 처리에 기초하여 보다 관련 있는 컨텐츠를 제공합니다. Qualtrics 개인정보취급방침
      Akamai mPulse
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Akamai mPulse를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Akamai mPulse 개인정보취급방침
      Digital River
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Digital River를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Digital River 개인정보취급방침
      Dynatrace
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Dynatrace를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Dynatrace 개인정보취급방침
      Khoros
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Khoros를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Khoros 개인정보취급방침
      Launch Darkly
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Launch Darkly를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Launch Darkly 개인정보취급방침
      New Relic
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 New Relic를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. New Relic 개인정보취급방침
      Salesforce Live Agent
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Salesforce Live Agent를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Salesforce Live Agent 개인정보취급방침
      Wistia
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Wistia를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Wistia 개인정보취급방침
      Tealium
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Tealium를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Upsellit
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Upsellit를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. CJ Affiliates
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 CJ Affiliates를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Commission Factory
      Typepad Stats
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Typepad Stats를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Typepad Stats 개인정보취급방침
      Geo Targetly
      Autodesk는 Geo Targetly를 사용하여 웹 사이트 방문자를 가장 적합한 웹 페이지로 안내하거나 위치를 기반으로 맞춤형 콘텐츠를 제공합니다. Geo Targetly는 웹 사이트 방문자의 IP 주소를 사용하여 방문자 장치의 대략적인 위치를 파악합니다. 이렇게 하면 방문자가 (대부분의 경우) 현지 언어로 된 콘텐츠를 볼 수 있습니다.Geo Targetly 개인정보취급방침
      SpeedCurve
      Autodesk에서는 SpeedCurve를 사용하여 웹 페이지 로드 시간과 이미지, 스크립트, 텍스트 등의 후속 요소 응답성을 측정하여 웹 사이트 환경의 성능을 모니터링하고 측정합니다. SpeedCurve 개인정보취급방침
      Qualified
      Qualified is the Autodesk Live Chat agent platform. This platform provides services to allow our customers to communicate in real-time with Autodesk support. We may collect unique ID for specific browser sessions during a chat. Qualified Privacy Policy

      icon-svg-hide-thick

      icon-svg-show-thick

      사용자 경험 향상 – 사용자와 관련된 항목을 표시할 수 있게 해 줌

      Google Optimize
      오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Google Optimize을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Google Optimize 개인정보취급방침
      ClickTale
      오토데스크는 고객이 사이트에서 겪을 수 있는 어려움을 더 잘 파악하기 위해 ClickTale을 이용합니다. 페이지의 모든 요소를 포함해 고객이 오토데스크 사이트와 상호 작용하는 방식을 이해하기 위해 세션 녹화를 사용합니다. 개인적으로 식별 가능한 정보는 가려지며 수집되지 않습니다. ClickTale 개인정보취급방침
      OneSignal
      오토데스크는 OneSignal가 지원하는 사이트에 디지털 광고를 배포하기 위해 OneSignal를 이용합니다. 광고는 OneSignal 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 OneSignal에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 OneSignal에 제공하는 데이터를 사용합니다. OneSignal 개인정보취급방침
      Optimizely
      오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Optimizely을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Optimizely 개인정보취급방침
      Amplitude
      오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Amplitude을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Amplitude 개인정보취급방침
      Snowplow
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Snowplow를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Snowplow 개인정보취급방침
      UserVoice
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 UserVoice를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. UserVoice 개인정보취급방침
      Clearbit
      Clearbit를 사용하면 실시간 데이터 보강 기능을 통해 고객에게 개인화되고 관련 있는 환경을 제공할 수 있습니다. Autodesk가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. Clearbit 개인정보취급방침
      YouTube
      YouTube는 사용자가 웹 사이트에 포함된 비디오를 보고 공유할 수 있도록 해주는 비디오 공유 플랫폼입니다. YouTube는 비디오 성능에 대한 시청 지표를 제공합니다. YouTube 개인정보보호 정책

      icon-svg-hide-thick

      icon-svg-show-thick

      광고 수신 설정 – 사용자에게 타겟팅된 광고를 제공할 수 있게 해 줌

      Adobe Analytics
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Adobe Analytics를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Adobe Analytics 개인정보취급방침
      Google Analytics (Web Analytics)
      오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Google Analytics (Web Analytics)를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. AdWords
      Marketo
      오토데스크는 고객에게 더욱 시의적절하며 관련 있는 이메일 컨텐츠를 제공하기 위해 Marketo를 이용합니다. 이를 위해, 고객의 온라인 행동 및 오토데스크에서 전송하는 이메일과의 상호 작용에 관한 데이터를 수집합니다. 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 이메일 확인율, 클릭한 링크 등이 포함될 수 있습니다. 오토데스크는 이 데이터를 다른 소스에서 수집된 데이터와 결합하여 고객의 판매 또는 고객 서비스 경험을 개선하며, 고급 분석 처리에 기초하여 보다 관련 있는 컨텐츠를 제공합니다. Marketo 개인정보취급방침
      Doubleclick
      오토데스크는 Doubleclick가 지원하는 사이트에 디지털 광고를 배포하기 위해 Doubleclick를 이용합니다. 광고는 Doubleclick 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Doubleclick에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Doubleclick에 제공하는 데이터를 사용합니다. Doubleclick 개인정보취급방침
      HubSpot
      오토데스크는 고객에게 더욱 시의적절하며 관련 있는 이메일 컨텐츠를 제공하기 위해 HubSpot을 이용합니다. 이를 위해, 고객의 온라인 행동 및 오토데스크에서 전송하는 이메일과의 상호 작용에 관한 데이터를 수집합니다. 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 이메일 확인율, 클릭한 링크 등이 포함될 수 있습니다. HubSpot 개인정보취급방침
      Twitter
      오토데스크는 Twitter가 지원하는 사이트에 디지털 광고를 배포하기 위해 Twitter를 이용합니다. 광고는 Twitter 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Twitter에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Twitter에 제공하는 데이터를 사용합니다. Twitter 개인정보취급방침
      Facebook
      오토데스크는 Facebook가 지원하는 사이트에 디지털 광고를 배포하기 위해 Facebook를 이용합니다. 광고는 Facebook 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Facebook에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Facebook에 제공하는 데이터를 사용합니다. Facebook 개인정보취급방침
      LinkedIn
      오토데스크는 LinkedIn가 지원하는 사이트에 디지털 광고를 배포하기 위해 LinkedIn를 이용합니다. 광고는 LinkedIn 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 LinkedIn에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 LinkedIn에 제공하는 데이터를 사용합니다. LinkedIn 개인정보취급방침
      Yahoo! Japan
      오토데스크는 Yahoo! Japan가 지원하는 사이트에 디지털 광고를 배포하기 위해 Yahoo! Japan를 이용합니다. 광고는 Yahoo! Japan 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Yahoo! Japan에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Yahoo! Japan에 제공하는 데이터를 사용합니다. Yahoo! Japan 개인정보취급방침
      Naver
      오토데스크는 Naver가 지원하는 사이트에 디지털 광고를 배포하기 위해 Naver를 이용합니다. 광고는 Naver 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Naver에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Naver에 제공하는 데이터를 사용합니다. Naver 개인정보취급방침
      Quantcast
      오토데스크는 Quantcast가 지원하는 사이트에 디지털 광고를 배포하기 위해 Quantcast를 이용합니다. 광고는 Quantcast 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Quantcast에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Quantcast에 제공하는 데이터를 사용합니다. Quantcast 개인정보취급방침
      Call Tracking
      오토데스크는 캠페인을 위해 사용자화된 전화번호를 제공하기 위하여 Call Tracking을 이용합니다. 그렇게 하면 고객이 오토데스크 담당자에게 더욱 빠르게 액세스할 수 있으며, 오토데스크의 성과를 더욱 정확하게 평가하는 데 도움이 됩니다. 제공된 전화번호를 기준으로 사이트에서 고객 행동에 관한 데이터를 수집할 수도 있습니다. Call Tracking 개인정보취급방침
      Wunderkind
      오토데스크는 Wunderkind가 지원하는 사이트에 디지털 광고를 배포하기 위해 Wunderkind를 이용합니다. 광고는 Wunderkind 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Wunderkind에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Wunderkind에 제공하는 데이터를 사용합니다. Wunderkind 개인정보취급방침
      ADC Media
      오토데스크는 ADC Media가 지원하는 사이트에 디지털 광고를 배포하기 위해 ADC Media를 이용합니다. 광고는 ADC Media 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 ADC Media에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 ADC Media에 제공하는 데이터를 사용합니다. ADC Media 개인정보취급방침
      AgrantSEM
      오토데스크는 AgrantSEM가 지원하는 사이트에 디지털 광고를 배포하기 위해 AgrantSEM를 이용합니다. 광고는 AgrantSEM 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 AgrantSEM에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 AgrantSEM에 제공하는 데이터를 사용합니다. AgrantSEM 개인정보취급방침
      Bidtellect
      오토데스크는 Bidtellect가 지원하는 사이트에 디지털 광고를 배포하기 위해 Bidtellect를 이용합니다. 광고는 Bidtellect 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Bidtellect에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Bidtellect에 제공하는 데이터를 사용합니다. Bidtellect 개인정보취급방침
      Bing
      오토데스크는 Bing가 지원하는 사이트에 디지털 광고를 배포하기 위해 Bing를 이용합니다. 광고는 Bing 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Bing에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Bing에 제공하는 데이터를 사용합니다. Bing 개인정보취급방침
      G2Crowd
      오토데스크는 G2Crowd가 지원하는 사이트에 디지털 광고를 배포하기 위해 G2Crowd를 이용합니다. 광고는 G2Crowd 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 G2Crowd에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 G2Crowd에 제공하는 데이터를 사용합니다. G2Crowd 개인정보취급방침
      NMPI Display
      오토데스크는 NMPI Display가 지원하는 사이트에 디지털 광고를 배포하기 위해 NMPI Display를 이용합니다. 광고는 NMPI Display 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 NMPI Display에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 NMPI Display에 제공하는 데이터를 사용합니다. NMPI Display 개인정보취급방침
      VK
      오토데스크는 VK가 지원하는 사이트에 디지털 광고를 배포하기 위해 VK를 이용합니다. 광고는 VK 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 VK에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 VK에 제공하는 데이터를 사용합니다. VK 개인정보취급방침
      Adobe Target
      오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Adobe Target을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Adobe Target 개인정보취급방침
      Google Analytics (Advertising)
      오토데스크는 Google Analytics (Advertising)가 지원하는 사이트에 디지털 광고를 배포하기 위해 Google Analytics (Advertising)를 이용합니다. 광고는 Google Analytics (Advertising) 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Google Analytics (Advertising)에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Google Analytics (Advertising)에 제공하는 데이터를 사용합니다. Google Analytics (Advertising) 개인정보취급방침
      Trendkite
      오토데스크는 Trendkite가 지원하는 사이트에 디지털 광고를 배포하기 위해 Trendkite를 이용합니다. 광고는 Trendkite 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Trendkite에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Trendkite에 제공하는 데이터를 사용합니다. Trendkite 개인정보취급방침
      Hotjar
      오토데스크는 Hotjar가 지원하는 사이트에 디지털 광고를 배포하기 위해 Hotjar를 이용합니다. 광고는 Hotjar 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Hotjar에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Hotjar에 제공하는 데이터를 사용합니다. Hotjar 개인정보취급방침
      6 Sense
      오토데스크는 6 Sense가 지원하는 사이트에 디지털 광고를 배포하기 위해 6 Sense를 이용합니다. 광고는 6 Sense 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 6 Sense에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 6 Sense에 제공하는 데이터를 사용합니다. 6 Sense 개인정보취급방침
      Terminus
      오토데스크는 Terminus가 지원하는 사이트에 디지털 광고를 배포하기 위해 Terminus를 이용합니다. 광고는 Terminus 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Terminus에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Terminus에 제공하는 데이터를 사용합니다. Terminus 개인정보취급방침
      StackAdapt
      오토데스크는 StackAdapt가 지원하는 사이트에 디지털 광고를 배포하기 위해 StackAdapt를 이용합니다. 광고는 StackAdapt 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 StackAdapt에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 StackAdapt에 제공하는 데이터를 사용합니다. StackAdapt 개인정보취급방침
      The Trade Desk
      오토데스크는 The Trade Desk가 지원하는 사이트에 디지털 광고를 배포하기 위해 The Trade Desk를 이용합니다. 광고는 The Trade Desk 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 The Trade Desk에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 The Trade Desk에 제공하는 데이터를 사용합니다. The Trade Desk 개인정보취급방침
      RollWorks
      We use RollWorks to deploy digital advertising on sites supported by RollWorks. Ads are based on both RollWorks data and behavioral data that we collect while you’re on our sites. The data we collect may include pages you’ve visited, trials you’ve initiated, videos you’ve played, purchases you’ve made, and your IP address or device ID. This information may be combined with data that RollWorks has collected from you. We use the data that we provide to RollWorks to better customize your digital advertising experience and present you with more relevant ads. RollWorks Privacy Policy

      정말 더 적은 온라인 경험을 원하십니까?

      오토데스크는 고객 여러분에게 좋은 경험을 드리고 싶습니다. 이전 화면의 범주에 대해 "예"를 선택하셨다면 오토데스크는 고객을 위해 고객 경험을 사용자화하고 향상된 응용프로그램을 제작하기 위해 귀하의 데이터를 수집하고 사용합니다. 언제든지 개인정보 처리방침을 방문해 설정을 변경할 수 있습니다.

      고객의 경험. 고객의 선택.

      오토데스크는 고객의 개인 정보 보호를 중요시합니다. 오토데스크에서 수집하는 정보는 오토데스크 제품 사용 방법, 고객이 관심을 가질 만한 정보, 오토데스크에서 더욱 뜻깊은 경험을 제공하기 위한 개선 사항을 이해하는 데 도움이 됩니다.

      오토데스크에서 고객님께 적합한 경험을 제공해 드리기 위해 고객님의 데이터를 수집하고 사용하도록 허용하시겠습니까?

      선택할 수 있는 옵션을 자세히 알아보려면 이 사이트의 개인 정보 설정을 관리해 사용자화된 경험으로 어떤 이점을 얻을 수 있는지 살펴보거나 오토데스크 개인정보 처리방침 정책을 확인해 보십시오.