Introduction to BIM Execution Planning with Case Study

이 강의 공유하기

설명

We face misunderstandings, confusion and blame on a daily basis due to poor project planning in the construction industry. Why are we always behind on our tasks and why do we not make our deadlines? Why are our protocol documents volumes of pages that nobody ever reads? This session provides an introduction to better BIM Execution Planning – Contracting for the right BIM at the right time for the right people and for the right reason, all in promotion of better collaboration, coordination and communication. This session includes a case study of how we can integrate our BEP's with our 3D models using Autodesk BIM 360.

주요 학습

  • Understand the importance of BIM Execution Planning and what to include in it.
  • Identify BIM uses and begin drawing up a well defined BEP.
  • Engage teams and get agreement on scope of works.
  • Integrate BEP with BIM 360.

발표자

  • Ahmed Cassim 님의 아바타
    Ahmed Cassim
    Experienced Application Engineer and BIM consultant with a demonstrated history of working in the computer software industry. Skilled in Autodesk Revit, AutoCAD, BIM 360 and Microsoft Office. Strong architectural design professional with a focus in consulting and BIM coordination and management.
Video Player is loading.
Current Time 0:00
Duration 41:44
Loaded: 0.39%
Stream Type LIVE
Remaining Time 41:44
 
1x
  • Chapters
  • descriptions off, selected
  • en (Main), selected
Transcript

AHMED CASSIM: Good day and welcome, everyone, to Autodesk University. Today, we will be talking about the introduction to BIM Execution Planning with a case study. I'm Ahmed Cassim and I am an AEC applications engineer and BIM consultant at Moderna AEC and Infrastructure.

Moderna AEC and Infrastructure are your digital partners. We are situated in South Africa at the tip of Africa. We are the largest Autodesk partner in Africa. And we are also the Autodesk Platinum Partners. Our vision is systematically unlocking strategic creativity. And we are a leading digital consultant and service company with developed innovative products and solutions.

The learning objectives for today are four parts. So beginning with understanding the importance of BIM Execution Planning and what to include in it. Identifying BIM users and begin drawing up well-defined BIM Execution plans, how to engage your teams and get agreement on the scope of works. And then integrating the BIM Execution Plan with your model on Autodesk BIM 360.

The learning objectives will be split up into these sections which make up our agenda. Firstly, why do we create the BIM Execution Plans or BEPs? Some best practices to create successful BEPs.

How to get agreement on a clear BIM scope. How to sequence your BIM tasks. Solutions for and progress management. Management and verification of BIM. And some tips on BIM compliance. And then lastly, a case study.

So firstly, why do we create BIM Execution Plans? Why should we create a BEP? Well, unfortunately, as many of you know, this is how projects usually work. They consist of multiple teams, usually with different views of what project success looks like.

So firstly, how the customer explained it. How the BIM consultant described it. How the project was actually documented. What was actually installed. And finally, what the customer actually wanted was just a tire swing.

So BIM Execution Plans, or your BEPs are needed to help teams find common agreement between these multiple teams or disciplines so that everyone can follow the same standards and processes required to get to the right outcome. What happens when we don't plan.

Well, there are multiple teams. If we don't plan, there can be a lot of finger pointing. Is it a 6 or is it a 9? And we end up with this blame game. Some statistics from PMI. Almost 30% of why BEPs fail is due to poor communication and insufficient planning following right behind. These are mostly related to things we can plan for.

The BIM Execution Plan provides governance for the project. Does every BIM project need one? Well, BEPs are starting to be common practice in many large owners contracts and most medium and large BIM projects. And BEPs are also becoming part more and more of standard government requirements too. They're becoming mandatory.

So what are some of the challenges? A good question. What we have found out from some of the companies using BIM is that their current BIM Execution Process takes too long to create and manage. The BEP is usually a static document, usually created by one person. And it's mostly copied and pasted from previous projects.

Again, no one reads the BEP. Usually, it's just one large text document. It can be 100 plus pages that also references other external standards and processes that are unclear and not aligned to the specific project's needs. And then cross company agreement from all stakeholders is extremely challenging.

Processes and standards naturally evolve throughout the project, which is OK. And multiple teams need quick access toolbar reference or update. And the cycling of gathering comments and updating and receiving and sending the whole document seems never ending. All of this whilst the contract needs to be fixed.

We also hear that some are created as PDFs, are not read, get filed away. Yes, in the bottom drawer gathering dust. Only reviewed if there is a problem that needs to be addressed. So a question that we ask is, when does the BEP get used?

And the answer mostly is, only when the dirt hits the fan. So how do we make sure that it doesn't end up in that drawer gathering dust? So that's why we need one. In order to define the BIM uses and requirements. But what do we need to include in our BEP?

Some people have unrealistic expectations of BIM as well. We want LOD 500 plus COBie. Wanting everything for a BIM model may also not be effective. And you end up with either too much BIM, you're either modeling too much or you're getting this overlapping information. Or you end up with too little, where the contract didn't define enough BIM or nobody knew who was responsible for certain items. And we end up with this missing information.

So the trick is to have clear BIM goals. Make it SMART. S-M-A-R-T, for specific, measurable, attainable, relevant, and time bound BIM goals. Here are some typical categories for the types of BIM content in your BIM Execution plan. Maybe starting with an introduction of why we are doing BIM in the first place on this project specifically, through to the BIM uses, processes to follow.

We've got standards to reference, tech to support, formats to deliver. Terms to comply with and the scope for each participant. A BIM Execution Plan should include everything from project information to teams, team members and their contact details. Even some links out to other web applications that the project needs to use.

The introduction can be different based on the team's knowledge of BIM. Define the BIM users, define the customer, align the services with the capabilities. Which processes do you need in order to achieve those BIM uses? Do you need to explain it in a flow diagram? How to create some deliverables perhaps?

And then are you following certain standards? Are you following the ISO standards, ISO 19650. Defining the terminologies so that everyone on the project speaks the same language. For example, what is an asset information model and how will you ensure that the model created is fit for this purpose?

How do you standardize? How will you support this with the right technology? How will you manage software versions?

If you're using the ISO standards, again, why not have a template for it? Will you be using the OIR, PIR, EIR or your RACI documentation methods. And your deliverables. Is that IFC perhaps? Remember the BEP needs to be a contract.

Scope. Probably the most important part of the BIM Execution Plan is the scope. Having a clear scope helps everyone on a project. So some best practices to create successful BIM Execution Plans. First and foremost, understand why you are doing BIM. These are called BIM users.

Is it for design, 3D coordination, quantities? Lately, your virtual reality or augmented reality, VR or AR. We see a lot of success when teams build their BEPs together using a collaborative approach. So make sure that you add all the team members early so that their opinion is included.

And have a central location for all of your team to access, like an online or web-based BIM Execution Plan. And instead of it being one person, let's pull the BEP together. Make sure to use built in templates, again, to standardize the processes.

We also see increased engagement when you have good content. So not just having a plain text document that gets PDFed then completely ignored. Using video actually improves visualization and saves space which documents would have taken up. Information within sections also should be easy to search and easy to navigate.

And embedding those visually rich information. So using your videos, images, iframes, flowcharts is favorable. As people just don't want to read it if it's too long. So adding videos and pictures make a huge difference.

Also gaining multiparty agreement. Having all teams agree on something, it's not easy. So have a place for contributors to comment on the various aspects of the proposed plan, like on social media. So what's great is that it keeps all the information together in one place, rather than one person emailing the suggestions to another person.

Here, everyone can see the comments. And this helps collaborative working. And it's a never ending cycle when you're trying to agree on an entire document. It could be hundreds pages long. So splitting it up into bit-sized sections. The commenting, the workflow, sharing them and publishing them, being able to comment on each and every single section, allows you to break it up into these smaller, more manageable sections so we can publish filling out each section as we go so that you want to have it always up to date and access online.

To have built-in communication and approval workflow. Progress approval, again, by the bite-sized section. Collaboration and updates should-- and continue throughout the project. And then being able to print an archive, the contract document at each important contractual stage.

So quickly recapping on which is the BIM Execution Planning and helping that to be a part of your BIM management workflow. Most of the success we see is when it's online and collaborative. Also, people really enjoy being able to comment and contribute to the structure of the BIM Execution Plan.

They really feel part of it, which has a great effect on the quality of their work and the effort that they put in. And again, having the approval process in your bite-sized form, being able to approve certain parts without approving everything allows you to move forward on what has been agreed, which saves time and money.

OK, we've covered the importance of a BEP. But shouldn't the scope document also be part of the BEP? Yes, absolutely. Let's take a look at how we can agree on a clearer BIM Scope that you can include in your BEP.

So why do we need to agree-- or agree rather on a BIM Scope? We know that most project stakeholders usually have different BIM goals. Be they architect, the engineer or trade manager, everyone has their own idea on what their BIM should include.

But why is agreement between these stakeholders so difficult sometimes? We hear from project teams that these are some of the challenges that they face. Unfortunately, many teams end up contracting to an incorrect overly-detailed, overly-generalized BIM Scope spreadsheet. These can be disastrous for the teams and the project.

Unfortunately, these scopes are generally mandated and not agreed upon. And it's usually built by a one person, and it's mandated to the other teams. Only viewed as a PDF or spreadsheet with a set of confusing numbers. And usually, inaccessible by others.

And we know using a spreadsheet to define the who, what, when, and where becomes too complex and confusing for most. And again, unclear scope spreadsheets cause models that are missing scope models with duplicate or overlapping scope. And it's just a huge waste of time.

But let's look at some tips to agree on a clearer BIM Scope. The key to unlocking most challenges is being able to ask the right questions. Yeah, some of those questions.

Why are we doing them? What is the scope required for that BIM use? How much is actually needed? When is the scope needed? Who is responsible and where do we start?

So when it comes to defining the why, why are we doing BIM? What are the most important BIM uses for this particular project? Why are teams creating a 3D model in the first place? Why are they modeling it 3D in the first place? What's the purpose for BIM?

And once you've got that, you need to know what scope needs to be managed on the project. What's the list of elements that will need to be estimated, coordinated, handed over? And then each BIM use team must decide and define how much BIM is actually required. How much matters for each customer of the model at each stage of the project?

And then define the required geometry, documentation and information requirements, very important. And some of the most important parts are understanding and defining when critical handovers of responsibility occur. Like here, for the stairs, from the architect to the structural team. So knowing who is responsible and when is critical for project success.

What's needed for the perfect BIM Scope? Answers to these questions reveal what's important, when it's required, for what BIM use or purpose, who is responsible and what handovers are expected or agreed to. So a quick recap.

Always start with a purpose. Why are we creating a model in the first place? What scope is required? How much is actually needed? When is the scope needed and who is responsible? We see a lot of teams responding well to a visual grid.

So not just the information or the accuracy or the geometry, it's a combination of all those. So we define what is required by whom and then being able to assign them. And that helps us see the handover from one team to another.

And very importantly, we are making it a lean, less cluttered workflow. So everyone understands what the requirements are and is able to deliver. And then we move on to sequencing our BIM tasks. So why sequence BIM tasks?

It's all about making sure tasks get completed at the right time and in the right way. Why? Well, if we get them in the wrong order, even if we were to avoid a clash, it could still lose us money. On the left hand side, the pipes don't run through the cable tray. But it will cost more in materials and time-- more bins and wells, more supports.

But if we get the sequence right, if we get the plumbing installed before the cable tray and avoid losing time and money-- so how do we prioritize tasks to minimize the impact on cost? Sequencing the less expensive content or element to route around the other will reduce cost.

And why is sequencing BIM tasks such a challenge? Well, some teams report these challenges. Since we can't all be in the same office and it's difficult to influence other people's work, and we can't end up with-- or we may end up with out of sequence work which leads to rework due to having to move something because it didn't work out. And again, this method of lean design management concepts are starting to become more common.

But for most, this is a completely new concept perhaps. So let's talk about some tips on how to sequence the tasks in a more optimal order. Well, the big picture is that if we can have a system priority structure which sets the foundation, the more important or less flexible items first, your architectural and your structural items, again, they're before you're civil. Then going on to the more flexible or less costly things like your gravity systems and mechanical systems to work on.

And that would be really smart and cost and time effective. And also, implementing a lean design management workflow and your pool planning and phase planning. So we can really sequence the tasks effectively. And this can help to ensure that everyone is contributing to the plan and agreeing to the most optimum sequence.

We can start to capture those critical dependencies and assign tasks digitally to team members so that the assignments carry forward for when they are not in the office perhaps. And the result is that we can have a plan to start each team at the right time, even if it means in vastly different project stages or project phases. So that we avoid unnecessary waste and rework.

And this means we are not wasting people's time. They are adding to the model at the right time and in the right place. We are we are reducing the amount of rework on a project. And this directly impacts the project cost.

A quick recap. We are enhancing teamwork. Again, collaboration is key. All of us need to agree on the system priority structure. Everyone involved needs to be present for the pool planning. Have your end task in mind and then what you need before that, what you need before that and before that.

And ultimately, this reduces all the amount of work, it makes managing and completing schedules lean and more straightforward. But why is updating project progress such a challenge for teams? Everyone tends to create and manage their own to-do list in their own isolated environment.

It's usually up to one person to gather everyone's updates. And even when you do receive that information, can you trust it? So let's look at some tips for simple and seamless progress updates that teams can trust.

So we've seen the best results when teams use simple Kanban boards. It's a column based chart that you can drag and drop cards to quickly understand the status. And you can have lots of different columns to represent those.

What is prioritized? What is ready for review, perhaps? And the power comes from consolidating all team members tasks in a single location. But it's not just the Kanban board, it's about doing everything in one place, one location, one source of truth.

And this means that everyone is tracking the progress together, not in their individual silos. On the left hand side of the screen, we see tasks that are simply filtered and that makes it really easy for the user to just drag and drop their updates. And on the right hand side, we see another user, a manager, who is able to see the overview of all the tasks, making it a lot easier to understand the process.

And then it's important to make sure that the updates are a team effort instead of it being one person being responsible for going around and collecting the reports. Each team member can filter their own tasks and make updates. Then the managers can see all the tasks and understand the big picture.

A quick recap. One to-do list can help all the team members collaborate in sequence and effectively communicate when tasks and content will be completed. Kanban boards help visualize this process and keep everything all in one place. Then it's imperative to ensure that teams are meeting those requirements.

So let's take a look at how teams can verify that these objectives have been met. So why verify BIM compliance? First of all, well, if there is one bad apple or bad model then it can cause a significant impact on all of the other models. Cause a lot of problems for everyone else in terms of clashes and missing content, which can really affect the whole status of the project.

We want to keep it all on track, so it's really important to make sure you have compliance. And if you've missed content, trying to coordinate around it, it's virtually impossible. Think about the impact of missing content on the quantities for an estimate.

And why is this such a challenge? Why is verifying against those requirements sometimes such a big challenge? Well, a lot of the time, unfortunately, again, the original requirements are unclear. Is it a 6, is it a 9? We use disconnected tools which make it difficult to bring that data together, to connect the requirements to the deliverables.

Also, understanding contracts and how risk is usually allocated in our design and construction industry really does not help. It's a big challenge when someone is not on the hook for something that is part of their requirements from a budget perspective. So we are given deadlines.

And whether it's ready or not, it has to be delivered on the deadline. We get a start date and an end date. And on the end date, there is a whole lot of things that need to be done or reviewed. Imagine having to solve 100 clashes in one day.

But if we had bit-sized processes for our deadlines, solving those 100 clashes in, say, a month's time doesn't feel that bad. For example, let's get first floor coordinated and then move to second floor. And once that's done, the next thing and so forth and so forth.

So sequencing when you can deliver on a weekly or biweekly basis is a lot more efficient. So using the Kanban board, as you can see, people can just drag and drop something from in progress to ready for review to show when they've completed it. It doesn't have to be the whole model. It may just be a set of elements that are ready for your review. And you will be notified about that too.

How to check this? Well, it would be great to have the BIM Execution Plan and the BIM requirements, the BIM scope and the BIM deliverable all in one platform. And imagine that it was all connected to the model on Autodesk 360. Now that would be powerful.

Imagine being able to explode the building and sort elements into these groups, which you can review. As if walking into a store and you walk through the aisle and lighting fixtures on the left and all grouped together. And then in this case, the stairs on the other side and then review the items without having to search for them separately in a model.

So if you had a set of information requirements-- for example, going through the process to check whether geometry and information requirements are present and verified before delivering the model to somebody else-- how do you then check progress and BIM compliance?

Usually, it's just a checklist that you go through. And then you can see whether you are 50% complete or not or whatever the percentage is. But imagine if you can connect that to your BIM tasks and BIM requirements and visually see the model from Autodesk BIM 360 and filter and hide what's been verified and completed every time you check off a task in the model. And then see the model metrics and status instantly, imagine.

And then how about making sure that when you have a model and that checklist is finished, that is the only time that you then share and publish that model. And the relevant people or teams will get notified when things are verified and published or fully baked. No half-baked models.

So with regard to BIM compliance, it's really important to consolidate those requirements, making sure we have reviewed all our models against the checklists before we share and publish them. So let's talk about a few tips on BIM compliance.

The first important task is to prepare and consolidate your requirements. So one of those things might be to organize your requirements, whether they're by team, team members, status, milestones, whatever that may be. You just want to grab that information organized by team, team member, date, status and milestone.

You will want to organize your scope list. Then consolidate your reference materials as attachments. Perhaps then the list requirements for each system or element. Again, tying back to the scope of requirements that you had initially planned.

This could be information requirements and your LOI requirements per stage. Having all these requirements in one place specifically ties to an element really helps you begin that verification process. Then having all of this in one place makes it easier to review against the deliverables.

We can review if those contracted tasks have been completed. The most important part of this whole workflow is getting to a deliverable that meets requirements and can be released. Only models that meet the original requirements can and should be published for the intended BIM use.

Again, never publish a model that has not been verified. So as we change this model over from share to publish, we need to make sure that it has met those requirements. So a quick recap. Let's consolidate the requirements in one place. Let's make sure that we review every single model before it's released.

And to anybody else, Let's make sure we can go through that QA list and make sure it's consolidated. Then we can make it a lot easier to review before we share and publish that model.

Case study. So back at Moderna, we do a lot of scanning and modeling. And the main setback or pain, if you like, was that we would end up with a lot of coordination issues. And we wanted to know how having a BEP by identifying our BIM use, having our processes and standards in place, having the different modeling teams agreed to their deliverables, having an agreed scope and prioritizing the deliverables and somehow linking all this up with our model, which always sits on BIM 360 in the cloud-- how will this resolve our coordination issues?

The thesis here was that traditional design management follows a large batching process through your schematic design, design development, construction development. And a large batching process causes inflammation buildup. And too many assumptions are made on information which is out of date.

And misunderstandings are a root cause for the most waste. And all of this results in incomplete and late design. And in the past, we would follow a very traditional approach where we would get a project and get a conceptual design, a point cloud, if it went as build project. We plan for a few hours.

Assign responsibilities maybe within the day. And from there we get straight behind our desks and start modeling. So we get a design and a basic layout, send it to the relevant teams. And everybody would spend the rest of the weeks modeling. So the typical workflow is that we model for, say, a long time.

And after a few weeks, we get together and have coordination meetings and find clashes. And then another few weeks are spent updating the models. Then we do the cycle over a few months to try and get good quality clash-free models.

Unfortunately, we're still experiencing thousands of issues and clashes and challenges. It's mostly reflective or reactive coordination processes. And out of all the BIM uses, the most common is coordination. We put models together and we make it a semi-automatic process. We refine issues and fix them.

But because we're working in 3D, we are finding more and more clashes. So we have the tools to model correctly. We know when and where these clashes will most likely happen. But we still run clash detection and get this long list of clashes in our models.

And yet after all that going back and forth, we still end up making these mistakes. And this would affect the model quality and our deadlines. And the root causes are-- well, for clashes, we have two objects trying to occupy the same space. And that's what flags a clash.

This is usually because the models were uploaded at the same time. Because sometimes in other cases, that's what the contract tells you to do, whether it's a specified daily or weekly or monthly. The reason why that is is because we are operating using a traditional phased-based workflow. And in turn, we are creating large patches of work.

So what would the solution be? How about we plan and agree on smaller batches of work. And we get people to agree on a specific scope. And also, between teams, to agree on a sequence of that work having a priority structure in mind.

So it's not possible to prioritize easily if you have just three or four or five major phases of a project. Your schematic design, design development, construction documentation, it's very, very difficult to prioritize with so few phases of a project. Because you have got so much of work to issue in each phase.

So what we had done was we broke this phase-based approach down into smaller stages. So as many as 15 stages on our new projects. So we now have a more focused group to prioritize work within a stage. And closing out those stages is much more easier and manageable then having longer stages that housed a lot more modeling work.

So you have these smaller batches of work to issue at smaller intervals. It also meant that we were able to start the right teams at the right time and at the right stage and at the right sequence inside of that stage. And the output of that stage or the deliverable had less issues.

So teams, instead of using only a day or so for planning, we spend a few days-- a couple of days, perhaps. We start by pool planning our tasks. So having the end goal in mind in first. And then planning backwards what we need before that and what we need before that and so on, until we come to what's needed to start off with.

So planning backward with the end goal in mind, instead of running off to start modeling, we have conversations with each other. Well, I'm not going to start off modeling plumbing layouts until you have modeled the interior worlds because we need to know the layout. Or I will only model lights after you have given me the ceiling layout.

So the architect would probably just need 2D symbols on where the lights would be. So there were a series of conversations that occurred and that do occur that do not necessarily happen in the traditional approach. Fortunately, we have the ability to do this in digital form that everybody will have access to.

And those tasks-- those cards can be represented as the period of time that they have just committed to. And also, represented so that we can have the dependencies that they have asked for. And we will have a checklist in digital form as well.

So the conversation was that, what do you need before you can actually model something? So this leads to the discussions on prioritizing. So we realize that these elements or these other items that are flexible and these are the items that are less flexible or not as flexible. And an observation that was noted was that we were talking more continuously throughout the process, instead of it being quiet like before when we use the traditional method.

So understanding what others are doing made everyone's contribution so much more engaging, so much more powerful. So there are these exchanges of information that are required at each stage. And now, you can filter by week or you can remove filters. The purpose of the weekly planning and check-in is for accountability.

You want to hold yourself accountable. But you also want to hold others accountable for the deliverables that you require so that you can do your work on a timely basis. And you can manage those tasks in a simple Kanban board with its visual nature and simple drag and drop features. And using the filtering to see specific tasks within a specific time and also checking off what needs to be done. Making sure everybody and everything that was captured in the pool planning is then tracked and controlled and updated so that everyone knows where things are at which stage.

And then linking them up with your model. Or in our case, linking them up with our models which sit on Autodesk BIM 360. So in BIM 360 in your Account Admin module, you will go to the Apps tab where you can link up with a loads of apps that Autodesk BIM 360 has to offer. And we find the Plannerly app.

And once you select it, you can see a whole lot of information here on it and some workflows. And so you will click on to add to BIM 360. You will give Plannerly access to your BIM 360 account and documentation management. And now, you have activated your Plannerly app within BIM 360. And you've linked the two platforms.

So going back to the Project Admin and Document Management module in the folders just to showcase the model that we wish to link to the BEP on Plannerly to the sample architectural project in Revit in Plannerly. In the Verify module, you can drag or drop a model or you can choose to drag one or bring it in from BIM 360.

You will be allowed to browse through your projects in BIM 360, find the relevant one and basically, add it in. And the project is now loaded into Plannerly with it's versioning from BIM 360. And you can now cluster the two. It allows you to group elements where you can hit the button to consolidate it again.

By clustering these elements, we can choose which elements we need to link to a specific task that we had made using the cards in the Kanban board. Hit the button to consolidate the model again. We have the Status tool to see how much of the project has been verified at that stage.

And once we've verified enough of the model, we can then publish the latest model as well. So turn the model from shared to publish. And the result?

Well, compared to the results of similar sized projects with similar scopes and deliverables, we had found that by having a BEP, by identifying our users, having our processes and standards in place, having our different modeling teams agree to their deliverables, having an agreed upon scope prioritizing the deliverables, ironing out any misunderstandings of the deliverables-- and more importantly-- now being able to link our elements in the scope up with our model on BIM 360 and verify each of the elements at different stages of the project, we were able to see our model progress.

And we were able to verify compliance. And in turn, saving weeks of time on projects. And more importantly, dealing with far fewer clashes. I trust that this will lead us to create clearly defined BIM Execution Plans and will assist in incorporating much leaner and more collaborative workflows in BIM management.

And hopefully, this will take our meetings between us and our clients and the rest of the teams involved from this to this. Thank you, everyone, for joining. Keep well, stay safe and enjoy.

______
icon-svg-close-thick

쿠기 기본 설정

오토데스크는 고객의 개인 정보와 최상의 경험을 중요시합니다. 오토데스크는 정보를 사용자화하고 응용프로그램을 만들기 위해 고객의 본 사이트 사용에 관한 데이터를 수집합니다.

오토데스크에서 고객의 데이터를 수집하고 사용하도록 허용하시겠습니까?

오토데스크에서 사용하는타사 서비스개인정보 처리방침 정책을 자세히 알아보십시오.

반드시 필요 - 사이트가 제대로 작동하고 사용자에게 서비스를 원활하게 제공하기 위해 필수적임

이 쿠키는 오토데스크에서 사용자 기본 설정 또는 로그인 정보를 저장하거나, 사용자 요청에 응답하거나, 장바구니의 품목을 처리하기 위해 필요합니다.

사용자 경험 향상 – 사용자와 관련된 항목을 표시할 수 있게 해 줌

이 쿠키는 오토데스크가 보다 향상된 기능을 제공하고 사용자에게 맞는 정보를 제공할 수 있게 해 줍니다. 사용자에게 맞는 정보 및 환경을 제공하기 위해 오토데스크 또는 서비스를 제공하는 협력업체에서 이 쿠키를 설정할 수 있습니다. 이 쿠키를 허용하지 않을 경우 이러한 서비스 중 일부 또는 전체를 이용하지 못하게 될 수 있습니다.

광고 수신 설정 – 사용자에게 타겟팅된 광고를 제공할 수 있게 해 줌

이 쿠키는 사용자와 관련성이 높은 광고를 표시하고 그 효과를 추적하기 위해 사용자 활동 및 관심 사항에 대한 데이터를 수집합니다. 이렇게 데이터를 수집함으로써 사용자의 관심 사항에 더 적합한 광고를 표시할 수 있습니다. 이 쿠키를 허용하지 않을 경우 관심 분야에 해당되지 않는 광고가 표시될 수 있습니다.

icon-svg-close-thick

타사 서비스

각 범주에서 오토데스크가 사용하는 타사 서비스와 온라인에서 고객으로부터 수집하는 데이터를 사용하는 방식에 대해 자세히 알아보십시오.

icon-svg-hide-thick

icon-svg-show-thick

반드시 필요 - 사이트가 제대로 작동하고 사용자에게 서비스를 원활하게 제공하기 위해 필수적임

Qualtrics
오토데스크는 고객에게 더욱 시의적절하며 관련 있는 이메일 컨텐츠를 제공하기 위해 Qualtrics를 이용합니다. 이를 위해, 고객의 온라인 행동 및 오토데스크에서 전송하는 이메일과의 상호 작용에 관한 데이터를 수집합니다. 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 이메일 확인율, 클릭한 링크 등이 포함될 수 있습니다. 오토데스크는 이 데이터를 다른 소스에서 수집된 데이터와 결합하여 고객의 판매 또는 고객 서비스 경험을 개선하며, 고급 분석 처리에 기초하여 보다 관련 있는 컨텐츠를 제공합니다. Qualtrics 개인정보취급방침
Akamai mPulse
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Akamai mPulse를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Akamai mPulse 개인정보취급방침
Digital River
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Digital River를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Digital River 개인정보취급방침
Dynatrace
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Dynatrace를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Dynatrace 개인정보취급방침
Khoros
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Khoros를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Khoros 개인정보취급방침
Launch Darkly
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Launch Darkly를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Launch Darkly 개인정보취급방침
New Relic
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 New Relic를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. New Relic 개인정보취급방침
Salesforce Live Agent
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Salesforce Live Agent를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Salesforce Live Agent 개인정보취급방침
Wistia
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Wistia를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Wistia 개인정보취급방침
Tealium
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Tealium를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Upsellit
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Upsellit를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. CJ Affiliates
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 CJ Affiliates를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Commission Factory
Typepad Stats
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Typepad Stats를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Typepad Stats 개인정보취급방침
Geo Targetly
Autodesk는 Geo Targetly를 사용하여 웹 사이트 방문자를 가장 적합한 웹 페이지로 안내하거나 위치를 기반으로 맞춤형 콘텐츠를 제공합니다. Geo Targetly는 웹 사이트 방문자의 IP 주소를 사용하여 방문자 장치의 대략적인 위치를 파악합니다. 이렇게 하면 방문자가 (대부분의 경우) 현지 언어로 된 콘텐츠를 볼 수 있습니다.Geo Targetly 개인정보취급방침
SpeedCurve
Autodesk에서는 SpeedCurve를 사용하여 웹 페이지 로드 시간과 이미지, 스크립트, 텍스트 등의 후속 요소 응답성을 측정하여 웹 사이트 환경의 성능을 모니터링하고 측정합니다. SpeedCurve 개인정보취급방침
Qualified
Qualified is the Autodesk Live Chat agent platform. This platform provides services to allow our customers to communicate in real-time with Autodesk support. We may collect unique ID for specific browser sessions during a chat. Qualified Privacy Policy

icon-svg-hide-thick

icon-svg-show-thick

사용자 경험 향상 – 사용자와 관련된 항목을 표시할 수 있게 해 줌

Google Optimize
오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Google Optimize을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Google Optimize 개인정보취급방침
ClickTale
오토데스크는 고객이 사이트에서 겪을 수 있는 어려움을 더 잘 파악하기 위해 ClickTale을 이용합니다. 페이지의 모든 요소를 포함해 고객이 오토데스크 사이트와 상호 작용하는 방식을 이해하기 위해 세션 녹화를 사용합니다. 개인적으로 식별 가능한 정보는 가려지며 수집되지 않습니다. ClickTale 개인정보취급방침
OneSignal
오토데스크는 OneSignal가 지원하는 사이트에 디지털 광고를 배포하기 위해 OneSignal를 이용합니다. 광고는 OneSignal 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 OneSignal에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 OneSignal에 제공하는 데이터를 사용합니다. OneSignal 개인정보취급방침
Optimizely
오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Optimizely을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Optimizely 개인정보취급방침
Amplitude
오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Amplitude을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Amplitude 개인정보취급방침
Snowplow
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Snowplow를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Snowplow 개인정보취급방침
UserVoice
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 UserVoice를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. UserVoice 개인정보취급방침
Clearbit
Clearbit를 사용하면 실시간 데이터 보강 기능을 통해 고객에게 개인화되고 관련 있는 환경을 제공할 수 있습니다. Autodesk가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. Clearbit 개인정보취급방침
YouTube
YouTube는 사용자가 웹 사이트에 포함된 비디오를 보고 공유할 수 있도록 해주는 비디오 공유 플랫폼입니다. YouTube는 비디오 성능에 대한 시청 지표를 제공합니다. YouTube 개인정보보호 정책

icon-svg-hide-thick

icon-svg-show-thick

광고 수신 설정 – 사용자에게 타겟팅된 광고를 제공할 수 있게 해 줌

Adobe Analytics
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Adobe Analytics를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Adobe Analytics 개인정보취급방침
Google Analytics (Web Analytics)
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Google Analytics (Web Analytics)를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. AdWords
Marketo
오토데스크는 고객에게 더욱 시의적절하며 관련 있는 이메일 컨텐츠를 제공하기 위해 Marketo를 이용합니다. 이를 위해, 고객의 온라인 행동 및 오토데스크에서 전송하는 이메일과의 상호 작용에 관한 데이터를 수집합니다. 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 이메일 확인율, 클릭한 링크 등이 포함될 수 있습니다. 오토데스크는 이 데이터를 다른 소스에서 수집된 데이터와 결합하여 고객의 판매 또는 고객 서비스 경험을 개선하며, 고급 분석 처리에 기초하여 보다 관련 있는 컨텐츠를 제공합니다. Marketo 개인정보취급방침
Doubleclick
오토데스크는 Doubleclick가 지원하는 사이트에 디지털 광고를 배포하기 위해 Doubleclick를 이용합니다. 광고는 Doubleclick 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Doubleclick에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Doubleclick에 제공하는 데이터를 사용합니다. Doubleclick 개인정보취급방침
HubSpot
오토데스크는 고객에게 더욱 시의적절하며 관련 있는 이메일 컨텐츠를 제공하기 위해 HubSpot을 이용합니다. 이를 위해, 고객의 온라인 행동 및 오토데스크에서 전송하는 이메일과의 상호 작용에 관한 데이터를 수집합니다. 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 이메일 확인율, 클릭한 링크 등이 포함될 수 있습니다. HubSpot 개인정보취급방침
Twitter
오토데스크는 Twitter가 지원하는 사이트에 디지털 광고를 배포하기 위해 Twitter를 이용합니다. 광고는 Twitter 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Twitter에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Twitter에 제공하는 데이터를 사용합니다. Twitter 개인정보취급방침
Facebook
오토데스크는 Facebook가 지원하는 사이트에 디지털 광고를 배포하기 위해 Facebook를 이용합니다. 광고는 Facebook 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Facebook에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Facebook에 제공하는 데이터를 사용합니다. Facebook 개인정보취급방침
LinkedIn
오토데스크는 LinkedIn가 지원하는 사이트에 디지털 광고를 배포하기 위해 LinkedIn를 이용합니다. 광고는 LinkedIn 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 LinkedIn에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 LinkedIn에 제공하는 데이터를 사용합니다. LinkedIn 개인정보취급방침
Yahoo! Japan
오토데스크는 Yahoo! Japan가 지원하는 사이트에 디지털 광고를 배포하기 위해 Yahoo! Japan를 이용합니다. 광고는 Yahoo! Japan 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Yahoo! Japan에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Yahoo! Japan에 제공하는 데이터를 사용합니다. Yahoo! Japan 개인정보취급방침
Naver
오토데스크는 Naver가 지원하는 사이트에 디지털 광고를 배포하기 위해 Naver를 이용합니다. 광고는 Naver 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Naver에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Naver에 제공하는 데이터를 사용합니다. Naver 개인정보취급방침
Quantcast
오토데스크는 Quantcast가 지원하는 사이트에 디지털 광고를 배포하기 위해 Quantcast를 이용합니다. 광고는 Quantcast 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Quantcast에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Quantcast에 제공하는 데이터를 사용합니다. Quantcast 개인정보취급방침
Call Tracking
오토데스크는 캠페인을 위해 사용자화된 전화번호를 제공하기 위하여 Call Tracking을 이용합니다. 그렇게 하면 고객이 오토데스크 담당자에게 더욱 빠르게 액세스할 수 있으며, 오토데스크의 성과를 더욱 정확하게 평가하는 데 도움이 됩니다. 제공된 전화번호를 기준으로 사이트에서 고객 행동에 관한 데이터를 수집할 수도 있습니다. Call Tracking 개인정보취급방침
Wunderkind
오토데스크는 Wunderkind가 지원하는 사이트에 디지털 광고를 배포하기 위해 Wunderkind를 이용합니다. 광고는 Wunderkind 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Wunderkind에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Wunderkind에 제공하는 데이터를 사용합니다. Wunderkind 개인정보취급방침
ADC Media
오토데스크는 ADC Media가 지원하는 사이트에 디지털 광고를 배포하기 위해 ADC Media를 이용합니다. 광고는 ADC Media 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 ADC Media에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 ADC Media에 제공하는 데이터를 사용합니다. ADC Media 개인정보취급방침
AgrantSEM
오토데스크는 AgrantSEM가 지원하는 사이트에 디지털 광고를 배포하기 위해 AgrantSEM를 이용합니다. 광고는 AgrantSEM 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 AgrantSEM에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 AgrantSEM에 제공하는 데이터를 사용합니다. AgrantSEM 개인정보취급방침
Bidtellect
오토데스크는 Bidtellect가 지원하는 사이트에 디지털 광고를 배포하기 위해 Bidtellect를 이용합니다. 광고는 Bidtellect 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Bidtellect에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Bidtellect에 제공하는 데이터를 사용합니다. Bidtellect 개인정보취급방침
Bing
오토데스크는 Bing가 지원하는 사이트에 디지털 광고를 배포하기 위해 Bing를 이용합니다. 광고는 Bing 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Bing에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Bing에 제공하는 데이터를 사용합니다. Bing 개인정보취급방침
G2Crowd
오토데스크는 G2Crowd가 지원하는 사이트에 디지털 광고를 배포하기 위해 G2Crowd를 이용합니다. 광고는 G2Crowd 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 G2Crowd에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 G2Crowd에 제공하는 데이터를 사용합니다. G2Crowd 개인정보취급방침
NMPI Display
오토데스크는 NMPI Display가 지원하는 사이트에 디지털 광고를 배포하기 위해 NMPI Display를 이용합니다. 광고는 NMPI Display 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 NMPI Display에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 NMPI Display에 제공하는 데이터를 사용합니다. NMPI Display 개인정보취급방침
VK
오토데스크는 VK가 지원하는 사이트에 디지털 광고를 배포하기 위해 VK를 이용합니다. 광고는 VK 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 VK에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 VK에 제공하는 데이터를 사용합니다. VK 개인정보취급방침
Adobe Target
오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Adobe Target을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Adobe Target 개인정보취급방침
Google Analytics (Advertising)
오토데스크는 Google Analytics (Advertising)가 지원하는 사이트에 디지털 광고를 배포하기 위해 Google Analytics (Advertising)를 이용합니다. 광고는 Google Analytics (Advertising) 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Google Analytics (Advertising)에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Google Analytics (Advertising)에 제공하는 데이터를 사용합니다. Google Analytics (Advertising) 개인정보취급방침
Trendkite
오토데스크는 Trendkite가 지원하는 사이트에 디지털 광고를 배포하기 위해 Trendkite를 이용합니다. 광고는 Trendkite 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Trendkite에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Trendkite에 제공하는 데이터를 사용합니다. Trendkite 개인정보취급방침
Hotjar
오토데스크는 Hotjar가 지원하는 사이트에 디지털 광고를 배포하기 위해 Hotjar를 이용합니다. 광고는 Hotjar 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Hotjar에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Hotjar에 제공하는 데이터를 사용합니다. Hotjar 개인정보취급방침
6 Sense
오토데스크는 6 Sense가 지원하는 사이트에 디지털 광고를 배포하기 위해 6 Sense를 이용합니다. 광고는 6 Sense 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 6 Sense에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 6 Sense에 제공하는 데이터를 사용합니다. 6 Sense 개인정보취급방침
Terminus
오토데스크는 Terminus가 지원하는 사이트에 디지털 광고를 배포하기 위해 Terminus를 이용합니다. 광고는 Terminus 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Terminus에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Terminus에 제공하는 데이터를 사용합니다. Terminus 개인정보취급방침
StackAdapt
오토데스크는 StackAdapt가 지원하는 사이트에 디지털 광고를 배포하기 위해 StackAdapt를 이용합니다. 광고는 StackAdapt 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 StackAdapt에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 StackAdapt에 제공하는 데이터를 사용합니다. StackAdapt 개인정보취급방침
The Trade Desk
오토데스크는 The Trade Desk가 지원하는 사이트에 디지털 광고를 배포하기 위해 The Trade Desk를 이용합니다. 광고는 The Trade Desk 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 The Trade Desk에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 The Trade Desk에 제공하는 데이터를 사용합니다. The Trade Desk 개인정보취급방침
RollWorks
We use RollWorks to deploy digital advertising on sites supported by RollWorks. Ads are based on both RollWorks data and behavioral data that we collect while you’re on our sites. The data we collect may include pages you’ve visited, trials you’ve initiated, videos you’ve played, purchases you’ve made, and your IP address or device ID. This information may be combined with data that RollWorks has collected from you. We use the data that we provide to RollWorks to better customize your digital advertising experience and present you with more relevant ads. RollWorks Privacy Policy

정말 더 적은 온라인 경험을 원하십니까?

오토데스크는 고객 여러분에게 좋은 경험을 드리고 싶습니다. 이전 화면의 범주에 대해 "예"를 선택하셨다면 오토데스크는 고객을 위해 고객 경험을 사용자화하고 향상된 응용프로그램을 제작하기 위해 귀하의 데이터를 수집하고 사용합니다. 언제든지 개인정보 처리방침을 방문해 설정을 변경할 수 있습니다.

고객의 경험. 고객의 선택.

오토데스크는 고객의 개인 정보 보호를 중요시합니다. 오토데스크에서 수집하는 정보는 오토데스크 제품 사용 방법, 고객이 관심을 가질 만한 정보, 오토데스크에서 더욱 뜻깊은 경험을 제공하기 위한 개선 사항을 이해하는 데 도움이 됩니다.

오토데스크에서 고객님께 적합한 경험을 제공해 드리기 위해 고객님의 데이터를 수집하고 사용하도록 허용하시겠습니까?

선택할 수 있는 옵션을 자세히 알아보려면 이 사이트의 개인 정보 설정을 관리해 사용자화된 경험으로 어떤 이점을 얻을 수 있는지 살펴보거나 오토데스크 개인정보 처리방침 정책을 확인해 보십시오.