What happens when the best engineering firm and the best construction company join forces for an engineering, procurement, and construction (EPC) company highway project? A dream team is created, where each party’s expertise creates synergy for project success. EPC arrangements are becoming more popular in the infrastructure sector, and InfraWorks 360 software provides the perfect tools for both designers and contractors to not only win the bidding process, but to also get a jump-start on the 4D virtual construction model. The principle of integrated concurrent engineering used with keen collaboration and InfraWorks 360 software enabled engineering and construction decisions to be made with amazing and unexpected optimizations. The project created such positive innovation that the methods used were coined “Dreamline Engineering." Come to this class to see the surprising design decisions that resulted from review and analysis of the InfraWorks 360 model. Who knew that blasting rock for a bike path would make so much sense? This session features InfraWorks 360 and AutoCAD Civil 3D. AIA Approved

주요 학습

  • Learn the benefits of applying ICE to your infrastructure projects
  • See how modeling results in amazing EPC design-build project optimizations
  • See how InfraWorks 360 models are capitalized on for the bidding process
  • Learn visualization and labeling tips and tricks for your InfraWorks 360 model presentations

발표자

  • Terje Glad
    Terje Glad is a specialist on the BIM Infra Expert Team in Sweco, Norway. He serves as a Building Information Modeling / virtual design and construction (BIM/VDC) strategist, manager, and coordinator, and is responsible for the implementation of new technology and processes on his elite team. He has worked for many years developing and enhancing the BIM experience for users across many disciplines. Before joining Sweco, Glad worked for Focus Software, where he implemented Autodesk, Inc., and other BIM solutions at the enterprise level. He was trained as a civil engineer and land surveyor, and gained essential construction experience working on construction sites during and after his education. Being raised at the very far reaches of Norway, Glad is an expert skier, and now living in Oslo, in the sunnier months he enjoys sailing the Sweco race boat long into the evenings after work.
  • Christian Mikkelsen
    Highway Construction
  • Sofia Nyman
    Sofia is working as a BIM coordinator at Sweco BIM infra. Prior to this, she has been a part-time employee as both road-engineer and BIM coordinator within Sweco. <br/><br/>Before she was employed in Sweco, sofia wrote a very exciting bachelor thesis together with Sweco, on the implementation and customization of digital collaboration methods in the design of infrastructure projects, with special focus on SICE methodology. (Sweco Integrated Concurrent Engineering)<br/><br/>Sofia is currently working in/on multiple large assignments in Sweco, like the Bergen Light Rail project. She has contributed with her expertise in SICE and other execution methods, and has been an important part of the BIM and ICT management in the project.<br/><br/>She is also involved in several projects as a BIM coordinator, and has been lifted BIM in Sweco to new heights through the implementation of new innovative processes and associated technology.
Video Player is loading.
Current Time 0:00
Duration 58:23
Loaded: 0.28%
Stream Type LIVE
Remaining Time 58:23
 
1x
  • Chapters
  • descriptions off, selected
  • en (Main), selected
Transcript

TERJE GLAD: All right, hello everyone. Thank you for attending our class here. And today we're going to talk about a project where we have used integrated concurrent engineering, and we have done some model base bidding. My name is Terje Glad. My first name is quite hard to pronounce in English. I work as a VDC specialist within Sweco. My role in this project that we're going to talk about today has to be as a BiM manager.

And in this class I will focus on the technology part. So I'll show you something from InfraWorks, how we have combined InfraWorks together with integrated concurrent engineering. Together with me today I have Sofia.

SOFIA NYMAN: Yes. My name is Sofia Nyman, and I work as the BiM coordinator in Sweco, Norway. And I also had a role as BiM coordinator in this project. In this presentation, I'm going to talk mostly about the methodology part.

CHRISTIAN MIKKELSEN: And I'm Christian Mikkelsen. I'm working in Veidekke, contractor. I work as an IT manager now, but have mostly background from [INAUDIBLE] production. In this project I was the design manager, and working with tenders mostly, and that types.

TERJE GLAD: And just a few words of where we are from. Me and Sofia are working in Sweco. We are Europe's largest consultancy company. We are 14 and 1/2 thousand employees in Europe. And Christian is from--

CHRISTIAN MIKKELSEN: Working Veidekke, which is the biggest construction company in Norway. So we have about 7,000 employees in Scandinavia, and build mostly everything.

TERJE GLAD: And this is our agenda today. So first of all, we are going to give you some facts about the project that we're working on, or that has been working on. And Sofia is going to talk about how we have used integrated concurrent engineering. And myself, I'm going to talk about our base models in InfraWorks, and how we have optimized the design and construction by using InfraWorks and ICE. And Christian is going to sum it up and talk about how we are calculating using the model.

And first of all, we have a short video that really summarize what we have done in the project, and what we're going to talk about today. So let's start with that.

[VIDEO PLAYBACK]

[MUSIC PLAYING]

[END PLAYBACK]

And maybe Christian can give us some more facts about the project and why we're doing this together.

CHRISTIAN MIKKELSEN: Yeah. So it spelled out a little bit in the film, the market is changing, especially in the infrastructure and civil market in Norway. The public authorities are moving towards more design and build contracts. So therefore, Veidekke needs to partner with a design firm consultancy and work together. And then talking to most of the big firms, where we're looking through, finding someone that shares our mindset.

And then for this project we partnered with Sweco, a lot because they have the same mindset on VDC, virtual design and construction, and ICE, which Sofia will tell you more about. And then Terje it's going to be the pilot now. Show us a little bit in model.

TERJE GLAD: I will try to.

CHRISTIAN MIKKELSEN: Mostly like it was when we were working. So the project is seven kilometers of road. A branch of a main road between Eastern and Western Norway. So this is located in southeast Norway. I think about 10,000 average cars per day. So not a main road, at least in Vegas standards, I think.

But as you can see, it was in a quite rural area with mostly a little farms and a little forest. Going through the project, we can see a great visualization of a tunnel there. So going over the hill, but still. Cuts, so there was a lot of rock blasting. And then mainly expanding or straightening the road along the current or existing corridor. And also then expanding with a walk, or a pedestrian walkway on either side changing sides.

And then the choke in the project, this is the densely populated area. I think we have about 10 houses. So I'm not going to claim it's the 10th biggest city in Norway or something. So just looking through it you get a feel for it for the project. And visualizing like this is very important, or gives us a lot. So we will talk about a little more about that later for the calculation part.

And Terje and Sofia will give a little more info about that, and Sofia will say a little about how we work.

TERJE GLAD: We will come back to the InfraWorks model very soon. But first of all, let's start with the methodology that we have used.

SOFIA NYMAN: It's a really hard word for us Norwegians. Yeah, as we saw in that short film at the start, and as Christian mentioned, this is quite new collaboration of people that's going to work in one project. We're not really used to working with a contractor in these early stages.

And it shows us mainly because of our joint understanding of working with [? Beman ?] VDC and concurrent engineering methods. So that's why we're using ICE on these products. And we also had a quite short time frame. We're going into this in three weeks. And that's one of the main benefits with ICE is that we can quickly get up the models that we need.

So defining ICE is quite hard. Like many of the words that we use in our daily language, the amount of definitions is almost as many as the users. But the real experts on ICE, they work at [? NOS ?] on Stanford University. So I stole this quote from John [? Kans ?] who works at CIFE, Stanford. So he says that integrated concurrent engineering is a social method helped by technology to create and evaluate multi-stakeholder, multi-discipline VDC models extremely rapidly.

So that's really what it's all about. And for us, that meant co-locating. Both Veidekke and sweco, we sat together in the same room with all focus on the model. So this was all to gain some kind of a joint understanding of the tasks and the problems that we had to solve in order to make this bidding process happen in three weeks.

So [INTERPOSING VOICES] Yeah, thank you. That's the definition. And I'm going to try to explain how we did it. First of all, we talk a little bit about people. It's contractors and consultants put together. So it's not only learning how to work with new people, but working with a completely new organization.

So we put together a team of people from Veidekke with great experience in the actual construction process. Asphalt technologists, geologists, and people from Sweco, road engineers, and road planners, and landscape architects. And of course, a build team so that the model could be in focus.

And the sessions, we did this in three weeks, and we sat together for the whole of those three weeks, of course. We started off with somewhat like 15 people in the initial meeting, and by then we had already created the base model. It was a tough weekend for them in the meeting, putting that together. But it is because we believe that having that model up on the big screen was important for us with so different backgrounds to really get a grasp of what we were going to do.

And normally when we consultants design a road, we take it to the highest level of detail and then we give it to our clients, which was with Veidekke, in this case. But sitting together like this, Veidekke could really define for us at what level of detail things had to be for them to do the calculations. So some parts of the product need to be highly detailed, and some parts they could do their own estimations based on their knowledge of the bidding process.

So we started by picking apart part the tasks, trying to analyze, what we do in parallel, and what models need to be ready first so that they can go on and do the calculations as they needed. Yeah.

And to try to answer out the benefits, which was the key learning objectives of this thing, when we sit together in normal product meetings, which can be half a day, we normally don't get a result that we can use directly. But sitting together in the ICE session, we do the design right then and there. So the model that we got out from these meetings and the outputs, which Terje is going to talk a bit more about later, it can really be used for a quantity take off and drawings. Just a couple of clicks and we were there.

So that was the main benefits. And we, as the consultant, got a great understanding of what the contractor needed for this bidding process.

TERJE GLAD: Perfect.

CHRISTIAN MIKKELSEN: I think, just want to add, because I think really one of the great benefits when we work together, we can decide what we will build, and not something that can be built by anyone. So we have our input into and work together with the expertise of the consultants to really go to the core of what we want to be able to deliver to the client, what they need, instead of making some generic design that can be built perhaps by someone.

TERJE GLAD: All right, thank you. And let's move over to the base model. This is a really important thing when working with integrated concurrent engineering. We need to have a really good base model to use in the meetings. In this project we got two days to build the base model. So I will try to explain how we have built this model over two days, and I will show you some examples from InfraWorks on the information that we have put into the model.

I don't think that without InfraWorks, this wouldn't have been possible. So InfraWorks is really a door opener for us to be able to have these ICE meetings, and to be able to work with ICE.

So as I said, we had two days to build this model. So the first thing that we did was to use some open data sources. The first thing we did was to use the InfraWorks model builder. That gave us some rough terrain surfaces, and we had the aerial imagery for our project area. We also got existing buildings and some of the existing roads. Then we have added a lot of data from different open sources that the Norwegian authority provides.

So I will show you some examples later on that we are using a lot of traffic and road data from the Norwegian road authorities. We got information about floodings and weather information. A really big thing here is that we have a lot of protected species, and endangered birds, and a lot of things along the roads, so we need to take care of that. We had a lot of borehole data from water holes, and we had information about avalanches from different ground conditions, and we also tried to connect data from Google Maps into the model so that our project members could use the InfraWorks models as a single source of information.

In Sweco we have a partner who is a geospatial data provider. So together with them we have developed our own geospatial data package. So in this case we could just go into a web interface in a web map. We could select the area that we wanted to work with in, and then we will have the data that you see here.

So we got some lighter data from an airborne laser scan, and we got some detailed high resolution aerial imagery. We had detailed building information so the geometry and information of all the existing buildings. We had some data on the existing roads, and a lot of property information. So we had all the properties and border lines. And we also had pretty good control of all the utilities, electro, and pipings, and existing infrastructure that we put into the model.

We didn't get a lot of data from the tender document, but we got some data. In Norway, the Norwegian road authorities are using a lot of Novapoint, so you've got the Novapoint road model. I don't know if you are familiar with Novapoint, point but it's a European road design software. In order to use that in InfraWorks, we had to move all the data from Novapoint to Civil 3D. We have a script that moves the data from Civil 3D into InfraWorks.

We also had the digital zoning plan. And the soling plan is really important in this project. Really need to stay inside the zoning areas and the zoning plan. So by using a third party application on top of Civil 3D, we were able to move the digital zoning plan with all its informations, or both geometry and information, into the base model in InfraWorks. And we also got some survey data of the existing road and existing pipings. And I will try to show you how we have used all of this information in InfraWorks.

Just to set up in my presentation, I have added some tables here that shows what kind of data we got from which source, and what formats we used, and then resolved it in InfraWorks. I won't go through that now, I will try to show you this in our InfraWorks model.

And just to say that if you have any questions, just ask them, and I will try to answer. Otherwise we can answer questions in the end of the session. And so the first thing, I said, we've used first of all-- oh, sorry. Maybe I have to end my presentation.

CHRISTIAN MIKKELSEN: This is really the great thing that also every party, and the contractors, the calculators, they are not used to doing this. But getting all this information, finding it in one place is really great for us. And we are used to doing PDFs. We are really digital, we are doing PDF. Or that's wrong, I'm really digital, because I have three screens instead of two screens, and PDFs printed. But the future is coming.

TERJE GLAD: All right. So this is our InfraWorks model. As I said, the first thing that we did was to use the model builder to get the first data to have a look on the project. And we also got some laser scans of existing terrain. So if I turn on my wireframe model there, you can see that when we are outside of the project, we are using the model building surface. But we are moving in to the road that we're going to build, the surface will be more detailed. So the level of detail is increasing closer to our project area.

And let's turn off the wire frame again. We also got some survey data and information about existing buildings, and the different utilities and everything. So that is physical objects. But I think the most interesting part here is the nonphysical objects, or the nonphysical information that we brought in.

So I will try to show you some of this. First of all, we have different ground conditions and train erosions. This is area that we need to have an extra eye on. Maybe we need to remove some of the masses. So this is information from the Norwegian authorities. It So here we brought in the polygons for the different areas, and the shape file here has information about what this is. So just by having my mouse cursor over this area, I can see what it is, and what's this all about.

As I said, in Norway, we have a lot of viking graves and those kind of things. So this is actually a viking grave that we need to stay away from. So we got all of these points and areas within our model. And here again, we can just be there by the point of interest. We imported this as points, and the points had some information about what this point is all about. So here we can see that this is an old viking grave, which is we need to stay, I think it's 25 meters away from this point.

So this is really easy information for all the project participants. They have a great overview of the project and existing situation, and things that we need to consider. We also brought in some nature observations and endangered species. Like this point, here someone has done an observation on some birds, and we might need to consider those birds. And also here, we have connected this point of interest to the nature database observation thing. So here we can just click on this point of interest, and we will get some more information about that observation.

You also have some areas with endangered species within. And also here we have tried to connect this area to some more information that is in the web server. So here, the project team can again just click on a point, and they will have all the information about this area. So that's a great thing about open data.

One very important thing was when we were trying to calculate all the masses and do the county take offs, we need to consider different mass types, and where we had rock, and where we had to blast rock. And we didn't have that much information about the rock surface. So we brought in some information about some water boreholes, as when you're drilling for water in Norway, you are required to report the information from the borehole. So here we have the placement of different boreholes, and we have also connected this to the data sheets that is attached to the boreholes.

So we have all of the information related to that borehole. We can see how deep it is down to the rock bed, and when it's drilled, and who did it. So we have a lot of information there.

In the start of the road, we had an area with quick clay. And that's really, really, really need to consider this. So here as well, we have the polygons from a shape file that created a coverage area. And if we click on the tooltip, we will have the whole report about this area. So it's really accessible for our project members.

I will try to show you two more examples. As I said, we have some survey data on some existing pipings and existing manholes. These sort of just points and lines that were surveyed out in the field. Each point and each line, they have their unique ID.

So instead of doing some detailed modeling of these manholes, and the pipes, and adding the correct dimensions, and using a lot of time on this, because we have just two days. Instead of doing that, we just connected the ID of this manhole into the data sheets from the Norwegian road database.

So here we can just click on that manhole, and we will have all the information on that manhole. So you know what type it is, and how large it is, and you have all the metadata connected to that manhole. Just to say that this is existing manholes, we will lower the road here. So that's the reason why they are sticking up in the air.

My last example is Google. This is really useful for when we are doing the planning and using the model for construction planning and everything. So for all the buildings and all the properties, we have connected those to Google Maps. So for this house there, I can just click link, and I will access Google Maps.

So I think everything is about bringing information to the project team, and create the information easy accessible. And here within Google Maps, you can, of course, use all of Google's functionality. So Google Street View is a great thing to use when planning the construction and execution of the project.

We also place Google Street View maps around the existing road. We embedded Street View into the tooltip. So here, the project participants can use InfraWorks instead of going into a web browser, and they will have the tooltips here.

So this is Christian's mansion. It's really nice. Yeah, so I think the important thing here is that we are trying to bring a lot of information to the project team, and try to keep the information easily accessible. And now the project team can rely on this as a single source of information.

CHRISTIAN MIKKELSEN: And then making the model available to people that don't usually use all these different sources. Not used to Street View. And then we give them the model, and we put a lot of these tooltips in. So it really helped them access all the information from the open data sources which they're not all familiar with. So I think it helps us to calculate correctly, which we'll come back to.

TERJE GLAD: As I said, I have added some information both in the presentation and the handouts. So if you want the tooltips and everything, you would find it in the class handout. So let's talk about optimization, and how we try to optimize the design and the execution of the construction.

First of all, rock surface and mass balance. This is really important in order to calculate the project. So this was one of the first tasks that we did. We used the Civil 3D in an ICE meeting with the geology engineer from Veidekke together with Sofia from Sweco, and they used one day. They were combining some boreholes that was done by in the Norwegian road authority in the early stage of the planning of this project, and we also used some information, for example, from the water boreholes that was from the open source.

I think it's quite impressive what they were doing in one day. They found a really nice workflow within Civil 3D to-- OK, you can't see my screen.

CHRISTIAN MIKKELSEN: But then again, jumping the gun on the calculation, this is really important for us because we need the correct quantities. And if you don't know where the rock is, and then we plan the road, is it soil removal or blasting? As a contractor, I'm only interested in money. So we were really happy getting this kind of data so that we can find the right price.

TERJE GLAD: And it was really cool that the workflow that we found in Civil 3D, we were able to create a dynamic surface. To start with we had some information, we had some boreholes. And then during the project we were out in the fields and collecting more information. So the surface that we created within Civil 3D was really dynamic. So it could do change, and it could do reviews underway in the project. And it was all linked up to the corridor models. So when updating the rock surface, we also could update all the quantity take-offs and the volume calculations.

So after having the information about the rock surface, we started to optimize the vertical geometry. What we found at first was that we had a lot of excess rock masses in the project. So we tried to optimize the vertical geometry in order to have a better mass balance.

For this we used first of all InfraWorks just to review the project, and to see all the cut areas, and the areas that we should try to optimize. And then we brought some information back to Civil 3D, and we brought the road model into Novapoint. So the road engineers from Sweco were sitting together with the construction manager and the maintenance specialist Veidekke.

We also had a landscape architect and a zoning expert available for the meeting. So [INAUDIBLE] we solved by doing this task was that we got an optimized alignment and profile for the new road. We also got an optimized corridor mobile in Novapoint that we used for quantity take-offs. And we were able to move the Novapoint model back to InfraWorks so that we had a updated model in InfraWorks. So there's just a picture from the vertical profile within Nopapoint. It's not really that good as Civil 3D.

The next thing that we did was phase planning. This picture here, the red area, or the red volume shows where we have construction during this phase in the project, and the green line is where the traffic is going in this phase. So in this bidding process, we have to deliver all the phase plans to the Norwegian road authorities in 2D. We did all the planning in InfraWorks Civil 3D. So we did the planning actually in the InfraWorks model. We did that in the ICE meeting with traffic planner from Sweco together, again, with the construction manager and a BiM coordinator or software specialist.

So the result by doing this was that we really optimized the traffic during the construction time. I mean, we are working along existing road here, so the existing traffic, we really need to handle that. We also had some great phase plan visualization in InfraWorks so we could easily communicate the plan of execution of this project. We were able to move all the data from InfraWorks to Civil 3D in order to create the required 2D drawings. So all of the 2D phase plan drawings were based on the InfraWorks model.

This is again just some examples. So for every single phase in the project, we did this modeling. So in InfraWorks we had one proposal for each phase in the project. By having this in the model, I don't think that before we had it in the model, we wasn't able to get this result. So I think the most important thing here was that we did the actual planning in the InfraWorks model.

The next thing we did was to try to do some site and construction planning. So this is actually the planning of the construction execution. We did that in InfraWorks and Civil 3D in an ICE meeting. We had a construction manager, and a construction specialist, and a BiM coordinator. I will show you some examples afterward here, but the result from this was that we really were able to optimize the construction time.

We think that we improved the safety during construction, because we were aware of all the risks and everything in the project. We had some great site plan visualizations, and visualization of the project execution. So again, communication both to our client, and within our project team. So within Sweco and Veidekke. And we were also able to produce the required site plan drawings that was to be delivered in 2D to the Norwegian road authority.

Again, it's just some images from planning.

CHRISTIAN MIKKELSEN: Yeah. And the thing that's really cool for us is that like you saw with the phase plans with the red and green, everybody's on the same page. We're talking about the same thing. We put it in the model. There's a lot of misunderstanding, I think, when we only work in two dimensions.

And then also explaining all the work that we have done to the client when we submit the tender, and then showing a lot of what we have been thinking. So it gives us an edge, I think, in planning. And the picture we have for you guys, this was lunch. So they were so excited they couldn't even go to lunch. Or they got some fruit, or the lunch of engineers, which is coffee.

So that's really cool. But getting people excited, that's really, I think, one of the main gains.

TERJE GLAD: All right, let's move on to the last part in optimization, the green line.

CHRISTIAN MIKKELSEN: Where it gets really amazing.

TERJE GLAD: OK, so green line, it's all about zoning plan optimization. So we are trying to optimize for design within the zoning plan. I will try to explain what it's all about. We did this in InfraWorks and Civil 3D and Autodesk Subassembly Composer. And we did everything in an ICE meeting. Actually, we did this in one day. Again, with the construction manager and a construction specialist together with a BiM coordinator, and with me.

The results by doing this task was that we reduced the excess masses. So we reduce the need of transport to landfills. We also got up to date the corridor model in Civil 3D and Novapoint, so we were able to add data crammed into take-offs.

So this was the original design. And we have the main road on the left side, and on the right side we have the bike path. In this example the bike path is along the existing road, and we're building a new road on the left hand side. So the original design was that we had a bike path which was four meters wide, and we had a two to one field slope.

And as I said, we had a lot of excess masses, so we needed to get rid of them. So we created a subassembly in Subassembly Composer that widened the bike path into eight meters, and we decreased the field slope into four to one. And that gives us, we are getting rid of a lot of excess masses. Also in having a 2 to 1 slope, we are required to build a guardrail. When decreasing the slopes to 4 to 1, we don't need any guard rail. We get rid of a lot of excess masses.

So we created a subassembly within Subassembly Composer. So it's Civil 3D, and according to our model in Civil 3D, we could really analyze the whole road, the [INAUDIBLE] limiters. And within just a few minutes, Civil 3D had analyzed them, placed the green line thing along the whole corridor model.

CHRISTIAN MIKKELSEN: So we actually went from a situation where we had about 100,000 cubic extra of busted rock to a situation where we almost were missing rock. And one of the main motivations here is all the excess rock had to-- it's not placed just behind the hill, it has to go seven or eight kilometers away. So it's a major, major increase in cost.

TERJE GLAD: And by doing this we also optimized the way we could build this thing, because now in the construction site left hand side, we will have full production. So they won't get bothered by any existing traffic. And we have two way traffic on the widened bike path. And we also take care of the two peoples that live in this area so they can walk safe along the construction site.

CHRISTIAN MIKKELSEN: And then also giving the client or the community more quality, because they get a wider bike path in the end instead of the one that was planned. So we are getting benefits that also benefit the end product.

TERJE GLAD: All right, and let's move over to calculations.

CHRISTIAN MIKKELSEN: So you can just next slide. Clipping from the film again. Because I've been commenting a couple of things when Terje's been speaking. But it's really for us, as the contractor, about finding the lowest, most correct quantity, or my belief. And then combining that with the smartest execution plan.

So using the dream line optimization for widening so that we can work undisturbed. It's a lot easier, it's more effective. And then also finding the solutions and thinking about maintenance, even though it's not our concern, really. But giving the client better solutions, hard quality, and describing it will give us an advantage in the tender.

So it's all about getting the job but then also trying to be smart, how can we deliver the best product at the lowest possible price? And then we used models, or moving it back and forth through Novapoint and getting the quantity take-off and putting it into our calculation system. And then trying to calculate it, I think we tried to calculate a little traditionally.

But there's something here for us, because we have to change also from going from a normal type contract, where we all get the [INAUDIBLE] quantity, and then calculating, and then starting to think differently. Because thinking about elements. So it's seven kilometers of the same thing. But in this area, there is something special, calculate that extra. But the main body on the road costs the same, at least if we can work the same.

And therefore using the model, and getting all the information and getting the right information to the right people at the right time is to great benefit. So then we get the best solutions, and with the best planned execution, and the highest probability of executing the plan, and also getting the lowest, most correct quantity, Which can get us the job. So I'm not going to show you how we calculate. Everybody knows, I think, or have an idea.

And then for all the guys that came a little late or didn't catch anything on what we said because we have some Norwegian accent or something, they get the movie again.

TERJE GLAD: Play the movie again.

CHRISTIAN MIKKELSEN: And then you can see if we did the same things.

TERJE GLAD: Actually the sound guy came in here and then removed the sound, so let's hope we still have some sound.

CHRISTIAN MIKKELSEN: The music was too cool.

TERJE GLAD: Yeah.

[VIDEO PLAYBACK]

CHRISTIAN MIKKELSEN: And I think that's one of the times that we've had this much information available just around primitives.

[END PLAYBACK]

[APPLAUSE]

TERJE GLAD: So we got some time for questions. Is there someone? Yep.

CHRISTIAN MIKKELSEN: Ladies first.

AUDIENCE: Did you feel that you described [INAUDIBLE] more data about the [INAUDIBLE] available during the [INAUDIBLE] phase, maybe at the start of the project, bringing in the project when you start, would you have more information available than a regular situation? How was the amount of time that you spent in [INAUDIBLE] that you don't have to spend to another project? Can you say something about that?

CHRISTIAN MIKKELSEN: I think we definitely have more information when starting the tender, and during the tender, and having it available to everyone. Not only in the guys that are good at Street, or Google. And also in doing this design and build, we have to know a lot more about things. We don't just receive something and put it through our delegation system and push it back.

And then having to consider things in the design and build, then we know the project a lot better and often know why it is the way it is so that we don't try to change something that can't be changed. If that makes sense.

AUDIENCE: And if you speed up the project now faster when you start up? Does that go faster?

CHRISTIAN MIKKELSEN: If we can build it faster.

AUDIENCE: If you start faster then--

CHRISTIAN MIKKELSEN: Yeah, I think we can start a little faster perhaps. But I think we can definitely finish faster. Because we can make it more suitable to our production teams and equipment, and do it in a way that we think is the best. Then there was a question here?

AUDIENCE: Can you not speak to how the contract or your arrangement with the road authority? At some point after or during this process, did they start requesting rural plan drawings? What did you transition to a more paper drawings documentation type of scenario?

CHRISTIAN MIKKELSEN: I think, if I understand the question correctly, because I think that when we did the design, we did a lot in the model, and then we had to dumb it down in delivering the tender and delivering PDFs. So I think the great gain for us was really for our execution and planning.

But there is movement, I think, also with the clients. They are looking more to models as the preferred way to communicate.

AUDIENCE: Did they make decisions or give you approvals based on the model, or did they ask for paper drawings or PDFs to look at?

CHRISTIAN MIKKELSEN: The tender specified that they needed these, and these, and these paper drawings.

TERJE GLAD: So in the tender documents, we have the drawing list and documents list that we were to deliver.

CHRISTIAN MIKKELSEN: And then there was no evaluation or negotiation process. So it's just deliver the tender as one package, and so. Yeah, [INAUDIBLE]?

AUDIENCE: I think you talked about how this process helped you be competitive. Did it inform many of your risk mitigation slants? Like the fact that you look at all this information together, did that inform you, is there added value in addition to putting the bids at a more competitive price, in maybe figuring out or forecasting what your risk could be just from looking at all this flavors of data?

CHRISTIAN MIKKELSEN: I would like to say yes, but we're not that good at risk. But I think that we get a lot more information. And I strongly believe that the more facts the better the decisions. And the better the decision, the lower the risk. Because taking as much as possible into consideration, then you know more, then there's less risk. I think the biggest risk here is also, again, the quantities. Because now it's our risk. And then we have to handle that in another way than like your bill of quantity contract, when we just say, oh, it went up, we need more money.

AUDIENCE: Did the project allow for different options of the alignment, or were you fixed on a [INAUDIBLE] in this instance?

CHRISTIAN MIKKELSEN: The zoning plan is quite strict. So you can't move the outer edges, or you can't move or change any of the elements. So the only thing that we really can is that the zoning plan doesn't have heights. So in one of the big cuts we raised the level of the road so that we didn't have to blast as much. But that was as much as the zoning plan allows.

AUDIENCE: So if you do a [INAUDIBLE] did that allow to do [INAUDIBLE] additional guides to do the possible option [INAUDIBLE]?

CHRISTIAN MIKKELSEN: I think so. But the tender documents clearly stated that alternative-- or it's funny, because they have one paragraph, then they find an alternative, and the next paragraph says this is not allowed. So it was quite clear, but then it's up to us, and we can do the risk in our project and say, there is a possibility of changing the zoning. And if we believe that this is a minor change and we can try to get it, then we can do the risk of saying because it adds value and is better for us, then we can try.

But it's a risk. Because then if you can't do the zoning change, then we have to build what's in the plan. But at this level of zoning, it's really set. So we can't do a lot of changes. But there are coming big projects where they are definitely rethinking. And just to add scale, I think this is about a little in excess of $20 million.

AUDIENCE: It was based off of [INAUDIBLE] survey or something, or did you actually go out and do some ground survey before you started the ICE session?

TERJE GLAD: We got the LIDAR scan from our geospatial data provider. So that was not included in the tender documents, but it was existing data. so we didn't do the scan for this project.

AUDIENCE: So you didn't need to do a [INAUDIBLE] survey to--

TERJE GLAD: No, they had actually done that. So we had access to the ladder data from the Norwegian authorities, because they have laser scanned the entire Norway, or they are doing it now. And they had did some survey of the existing road. So we were able to use that data in Civil 3D. So we had a quite good model of the existing road.

AUDIENCE: How was the legal situation [INAUDIBLE]

CHRISTIAN MIKKELSEN: No, we handle it as a contractor. We have the contract with the contact, and they are our supplier. So we ended up they getting paid and not us.

TERJE GLAD: All right.

CHRISTIAN MIKKELSEN: Any more questions, or everyone happy? Thank you.

TERJE GLAD: Thank you.

______
icon-svg-close-thick

쿠기 기본 설정

오토데스크는 고객의 개인 정보와 최상의 경험을 중요시합니다. 오토데스크는 정보를 사용자화하고 응용프로그램을 만들기 위해 고객의 본 사이트 사용에 관한 데이터를 수집합니다.

오토데스크에서 고객의 데이터를 수집하고 사용하도록 허용하시겠습니까?

오토데스크에서 사용하는타사 서비스개인정보 처리방침 정책을 자세히 알아보십시오.

반드시 필요 - 사이트가 제대로 작동하고 사용자에게 서비스를 원활하게 제공하기 위해 필수적임

이 쿠키는 오토데스크에서 사용자 기본 설정 또는 로그인 정보를 저장하거나, 사용자 요청에 응답하거나, 장바구니의 품목을 처리하기 위해 필요합니다.

사용자 경험 향상 – 사용자와 관련된 항목을 표시할 수 있게 해 줌

이 쿠키는 오토데스크가 보다 향상된 기능을 제공하고 사용자에게 맞는 정보를 제공할 수 있게 해 줍니다. 사용자에게 맞는 정보 및 환경을 제공하기 위해 오토데스크 또는 서비스를 제공하는 협력업체에서 이 쿠키를 설정할 수 있습니다. 이 쿠키를 허용하지 않을 경우 이러한 서비스 중 일부 또는 전체를 이용하지 못하게 될 수 있습니다.

광고 수신 설정 – 사용자에게 타겟팅된 광고를 제공할 수 있게 해 줌

이 쿠키는 사용자와 관련성이 높은 광고를 표시하고 그 효과를 추적하기 위해 사용자 활동 및 관심 사항에 대한 데이터를 수집합니다. 이렇게 데이터를 수집함으로써 사용자의 관심 사항에 더 적합한 광고를 표시할 수 있습니다. 이 쿠키를 허용하지 않을 경우 관심 분야에 해당되지 않는 광고가 표시될 수 있습니다.

icon-svg-close-thick

타사 서비스

각 범주에서 오토데스크가 사용하는 타사 서비스와 온라인에서 고객으로부터 수집하는 데이터를 사용하는 방식에 대해 자세히 알아보십시오.

icon-svg-hide-thick

icon-svg-show-thick

반드시 필요 - 사이트가 제대로 작동하고 사용자에게 서비스를 원활하게 제공하기 위해 필수적임

Qualtrics
오토데스크는 고객에게 더욱 시의적절하며 관련 있는 이메일 컨텐츠를 제공하기 위해 Qualtrics를 이용합니다. 이를 위해, 고객의 온라인 행동 및 오토데스크에서 전송하는 이메일과의 상호 작용에 관한 데이터를 수집합니다. 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 이메일 확인율, 클릭한 링크 등이 포함될 수 있습니다. 오토데스크는 이 데이터를 다른 소스에서 수집된 데이터와 결합하여 고객의 판매 또는 고객 서비스 경험을 개선하며, 고급 분석 처리에 기초하여 보다 관련 있는 컨텐츠를 제공합니다. Qualtrics 개인정보취급방침
Akamai mPulse
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Akamai mPulse를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Akamai mPulse 개인정보취급방침
Digital River
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Digital River를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Digital River 개인정보취급방침
Dynatrace
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Dynatrace를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Dynatrace 개인정보취급방침
Khoros
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Khoros를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Khoros 개인정보취급방침
Launch Darkly
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Launch Darkly를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Launch Darkly 개인정보취급방침
New Relic
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 New Relic를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. New Relic 개인정보취급방침
Salesforce Live Agent
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Salesforce Live Agent를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Salesforce Live Agent 개인정보취급방침
Wistia
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Wistia를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Wistia 개인정보취급방침
Tealium
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Tealium를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Upsellit
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Upsellit를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. CJ Affiliates
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 CJ Affiliates를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Commission Factory
Typepad Stats
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Typepad Stats를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Typepad Stats 개인정보취급방침
Geo Targetly
Autodesk는 Geo Targetly를 사용하여 웹 사이트 방문자를 가장 적합한 웹 페이지로 안내하거나 위치를 기반으로 맞춤형 콘텐츠를 제공합니다. Geo Targetly는 웹 사이트 방문자의 IP 주소를 사용하여 방문자 장치의 대략적인 위치를 파악합니다. 이렇게 하면 방문자가 (대부분의 경우) 현지 언어로 된 콘텐츠를 볼 수 있습니다.Geo Targetly 개인정보취급방침
SpeedCurve
Autodesk에서는 SpeedCurve를 사용하여 웹 페이지 로드 시간과 이미지, 스크립트, 텍스트 등의 후속 요소 응답성을 측정하여 웹 사이트 환경의 성능을 모니터링하고 측정합니다. SpeedCurve 개인정보취급방침
Qualified
Qualified is the Autodesk Live Chat agent platform. This platform provides services to allow our customers to communicate in real-time with Autodesk support. We may collect unique ID for specific browser sessions during a chat. Qualified Privacy Policy

icon-svg-hide-thick

icon-svg-show-thick

사용자 경험 향상 – 사용자와 관련된 항목을 표시할 수 있게 해 줌

Google Optimize
오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Google Optimize을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Google Optimize 개인정보취급방침
ClickTale
오토데스크는 고객이 사이트에서 겪을 수 있는 어려움을 더 잘 파악하기 위해 ClickTale을 이용합니다. 페이지의 모든 요소를 포함해 고객이 오토데스크 사이트와 상호 작용하는 방식을 이해하기 위해 세션 녹화를 사용합니다. 개인적으로 식별 가능한 정보는 가려지며 수집되지 않습니다. ClickTale 개인정보취급방침
OneSignal
오토데스크는 OneSignal가 지원하는 사이트에 디지털 광고를 배포하기 위해 OneSignal를 이용합니다. 광고는 OneSignal 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 OneSignal에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 OneSignal에 제공하는 데이터를 사용합니다. OneSignal 개인정보취급방침
Optimizely
오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Optimizely을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Optimizely 개인정보취급방침
Amplitude
오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Amplitude을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Amplitude 개인정보취급방침
Snowplow
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Snowplow를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Snowplow 개인정보취급방침
UserVoice
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 UserVoice를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. UserVoice 개인정보취급방침
Clearbit
Clearbit를 사용하면 실시간 데이터 보강 기능을 통해 고객에게 개인화되고 관련 있는 환경을 제공할 수 있습니다. Autodesk가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. Clearbit 개인정보취급방침
YouTube
YouTube는 사용자가 웹 사이트에 포함된 비디오를 보고 공유할 수 있도록 해주는 비디오 공유 플랫폼입니다. YouTube는 비디오 성능에 대한 시청 지표를 제공합니다. YouTube 개인정보보호 정책

icon-svg-hide-thick

icon-svg-show-thick

광고 수신 설정 – 사용자에게 타겟팅된 광고를 제공할 수 있게 해 줌

Adobe Analytics
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Adobe Analytics를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID 및 오토데스크 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. Adobe Analytics 개인정보취급방침
Google Analytics (Web Analytics)
오토데스크 사이트에서 고객의 행동에 관한 데이터를 수집하기 위해 Google Analytics (Web Analytics)를 이용합니다. 여기에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 오토데스크는 사이트 성과를 측정하고 고객의 온라인 경험의 편리함을 평가하여 기능을 개선하기 위해 이러한 데이터를 이용합니다. 또한, 이메일, 고객 지원 및 판매와 관련된 고객 경험을 최적화하기 위해 고급 분석 방법도 사용하고 있습니다. AdWords
Marketo
오토데스크는 고객에게 더욱 시의적절하며 관련 있는 이메일 컨텐츠를 제공하기 위해 Marketo를 이용합니다. 이를 위해, 고객의 온라인 행동 및 오토데스크에서 전송하는 이메일과의 상호 작용에 관한 데이터를 수집합니다. 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 이메일 확인율, 클릭한 링크 등이 포함될 수 있습니다. 오토데스크는 이 데이터를 다른 소스에서 수집된 데이터와 결합하여 고객의 판매 또는 고객 서비스 경험을 개선하며, 고급 분석 처리에 기초하여 보다 관련 있는 컨텐츠를 제공합니다. Marketo 개인정보취급방침
Doubleclick
오토데스크는 Doubleclick가 지원하는 사이트에 디지털 광고를 배포하기 위해 Doubleclick를 이용합니다. 광고는 Doubleclick 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Doubleclick에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Doubleclick에 제공하는 데이터를 사용합니다. Doubleclick 개인정보취급방침
HubSpot
오토데스크는 고객에게 더욱 시의적절하며 관련 있는 이메일 컨텐츠를 제공하기 위해 HubSpot을 이용합니다. 이를 위해, 고객의 온라인 행동 및 오토데스크에서 전송하는 이메일과의 상호 작용에 관한 데이터를 수집합니다. 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 이메일 확인율, 클릭한 링크 등이 포함될 수 있습니다. HubSpot 개인정보취급방침
Twitter
오토데스크는 Twitter가 지원하는 사이트에 디지털 광고를 배포하기 위해 Twitter를 이용합니다. 광고는 Twitter 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Twitter에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Twitter에 제공하는 데이터를 사용합니다. Twitter 개인정보취급방침
Facebook
오토데스크는 Facebook가 지원하는 사이트에 디지털 광고를 배포하기 위해 Facebook를 이용합니다. 광고는 Facebook 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Facebook에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Facebook에 제공하는 데이터를 사용합니다. Facebook 개인정보취급방침
LinkedIn
오토데스크는 LinkedIn가 지원하는 사이트에 디지털 광고를 배포하기 위해 LinkedIn를 이용합니다. 광고는 LinkedIn 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 LinkedIn에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 LinkedIn에 제공하는 데이터를 사용합니다. LinkedIn 개인정보취급방침
Yahoo! Japan
오토데스크는 Yahoo! Japan가 지원하는 사이트에 디지털 광고를 배포하기 위해 Yahoo! Japan를 이용합니다. 광고는 Yahoo! Japan 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Yahoo! Japan에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Yahoo! Japan에 제공하는 데이터를 사용합니다. Yahoo! Japan 개인정보취급방침
Naver
오토데스크는 Naver가 지원하는 사이트에 디지털 광고를 배포하기 위해 Naver를 이용합니다. 광고는 Naver 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Naver에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Naver에 제공하는 데이터를 사용합니다. Naver 개인정보취급방침
Quantcast
오토데스크는 Quantcast가 지원하는 사이트에 디지털 광고를 배포하기 위해 Quantcast를 이용합니다. 광고는 Quantcast 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Quantcast에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Quantcast에 제공하는 데이터를 사용합니다. Quantcast 개인정보취급방침
Call Tracking
오토데스크는 캠페인을 위해 사용자화된 전화번호를 제공하기 위하여 Call Tracking을 이용합니다. 그렇게 하면 고객이 오토데스크 담당자에게 더욱 빠르게 액세스할 수 있으며, 오토데스크의 성과를 더욱 정확하게 평가하는 데 도움이 됩니다. 제공된 전화번호를 기준으로 사이트에서 고객 행동에 관한 데이터를 수집할 수도 있습니다. Call Tracking 개인정보취급방침
Wunderkind
오토데스크는 Wunderkind가 지원하는 사이트에 디지털 광고를 배포하기 위해 Wunderkind를 이용합니다. 광고는 Wunderkind 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Wunderkind에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Wunderkind에 제공하는 데이터를 사용합니다. Wunderkind 개인정보취급방침
ADC Media
오토데스크는 ADC Media가 지원하는 사이트에 디지털 광고를 배포하기 위해 ADC Media를 이용합니다. 광고는 ADC Media 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 ADC Media에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 ADC Media에 제공하는 데이터를 사용합니다. ADC Media 개인정보취급방침
AgrantSEM
오토데스크는 AgrantSEM가 지원하는 사이트에 디지털 광고를 배포하기 위해 AgrantSEM를 이용합니다. 광고는 AgrantSEM 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 AgrantSEM에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 AgrantSEM에 제공하는 데이터를 사용합니다. AgrantSEM 개인정보취급방침
Bidtellect
오토데스크는 Bidtellect가 지원하는 사이트에 디지털 광고를 배포하기 위해 Bidtellect를 이용합니다. 광고는 Bidtellect 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Bidtellect에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Bidtellect에 제공하는 데이터를 사용합니다. Bidtellect 개인정보취급방침
Bing
오토데스크는 Bing가 지원하는 사이트에 디지털 광고를 배포하기 위해 Bing를 이용합니다. 광고는 Bing 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Bing에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Bing에 제공하는 데이터를 사용합니다. Bing 개인정보취급방침
G2Crowd
오토데스크는 G2Crowd가 지원하는 사이트에 디지털 광고를 배포하기 위해 G2Crowd를 이용합니다. 광고는 G2Crowd 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 G2Crowd에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 G2Crowd에 제공하는 데이터를 사용합니다. G2Crowd 개인정보취급방침
NMPI Display
오토데스크는 NMPI Display가 지원하는 사이트에 디지털 광고를 배포하기 위해 NMPI Display를 이용합니다. 광고는 NMPI Display 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 NMPI Display에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 NMPI Display에 제공하는 데이터를 사용합니다. NMPI Display 개인정보취급방침
VK
오토데스크는 VK가 지원하는 사이트에 디지털 광고를 배포하기 위해 VK를 이용합니다. 광고는 VK 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 VK에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 VK에 제공하는 데이터를 사용합니다. VK 개인정보취급방침
Adobe Target
오토데스크는 사이트의 새 기능을 테스트하고 이러한 기능의 고객 경험을 사용자화하기 위해 Adobe Target을 이용합니다. 이를 위해, 고객이 사이트를 방문해 있는 동안 행동 데이터를 수집합니다. 이 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역, IP 주소 또는 장치 ID, 오토데스크 ID 등이 포함될 수 있습니다. 고객은 기능 테스트를 바탕으로 여러 버전의 오토데스크 사이트를 경험하거나 방문자 특성을 바탕으로 개인화된 컨텐츠를 보게 될 수 있습니다. Adobe Target 개인정보취급방침
Google Analytics (Advertising)
오토데스크는 Google Analytics (Advertising)가 지원하는 사이트에 디지털 광고를 배포하기 위해 Google Analytics (Advertising)를 이용합니다. 광고는 Google Analytics (Advertising) 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Google Analytics (Advertising)에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Google Analytics (Advertising)에 제공하는 데이터를 사용합니다. Google Analytics (Advertising) 개인정보취급방침
Trendkite
오토데스크는 Trendkite가 지원하는 사이트에 디지털 광고를 배포하기 위해 Trendkite를 이용합니다. 광고는 Trendkite 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Trendkite에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Trendkite에 제공하는 데이터를 사용합니다. Trendkite 개인정보취급방침
Hotjar
오토데스크는 Hotjar가 지원하는 사이트에 디지털 광고를 배포하기 위해 Hotjar를 이용합니다. 광고는 Hotjar 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Hotjar에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Hotjar에 제공하는 데이터를 사용합니다. Hotjar 개인정보취급방침
6 Sense
오토데스크는 6 Sense가 지원하는 사이트에 디지털 광고를 배포하기 위해 6 Sense를 이용합니다. 광고는 6 Sense 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 6 Sense에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 6 Sense에 제공하는 데이터를 사용합니다. 6 Sense 개인정보취급방침
Terminus
오토데스크는 Terminus가 지원하는 사이트에 디지털 광고를 배포하기 위해 Terminus를 이용합니다. 광고는 Terminus 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 Terminus에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 Terminus에 제공하는 데이터를 사용합니다. Terminus 개인정보취급방침
StackAdapt
오토데스크는 StackAdapt가 지원하는 사이트에 디지털 광고를 배포하기 위해 StackAdapt를 이용합니다. 광고는 StackAdapt 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 StackAdapt에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 StackAdapt에 제공하는 데이터를 사용합니다. StackAdapt 개인정보취급방침
The Trade Desk
오토데스크는 The Trade Desk가 지원하는 사이트에 디지털 광고를 배포하기 위해 The Trade Desk를 이용합니다. 광고는 The Trade Desk 데이터와 고객이 사이트를 방문하는 동안 오토데스크가 수집하는 행동 데이터 모두에 기초하여 제공됩니다. 오토데스크가 수집하는 데이터에는 고객이 방문한 페이지, 시작한 체험판, 재생한 동영상, 구매 내역 및 IP 주소 또는 장치 ID가 포함될 수 있습니다. 이 정보는 The Trade Desk에서 고객으로부터 수집한 데이터와 결합될 수 있습니다. 오토데스크는 디지털 광고 경험에 대한 사용자화를 개선하고 고객에게 더욱 관련 있는 광고를 제시하기 위해 The Trade Desk에 제공하는 데이터를 사용합니다. The Trade Desk 개인정보취급방침
RollWorks
We use RollWorks to deploy digital advertising on sites supported by RollWorks. Ads are based on both RollWorks data and behavioral data that we collect while you’re on our sites. The data we collect may include pages you’ve visited, trials you’ve initiated, videos you’ve played, purchases you’ve made, and your IP address or device ID. This information may be combined with data that RollWorks has collected from you. We use the data that we provide to RollWorks to better customize your digital advertising experience and present you with more relevant ads. RollWorks Privacy Policy

정말 더 적은 온라인 경험을 원하십니까?

오토데스크는 고객 여러분에게 좋은 경험을 드리고 싶습니다. 이전 화면의 범주에 대해 "예"를 선택하셨다면 오토데스크는 고객을 위해 고객 경험을 사용자화하고 향상된 응용프로그램을 제작하기 위해 귀하의 데이터를 수집하고 사용합니다. 언제든지 개인정보 처리방침을 방문해 설정을 변경할 수 있습니다.

고객의 경험. 고객의 선택.

오토데스크는 고객의 개인 정보 보호를 중요시합니다. 오토데스크에서 수집하는 정보는 오토데스크 제품 사용 방법, 고객이 관심을 가질 만한 정보, 오토데스크에서 더욱 뜻깊은 경험을 제공하기 위한 개선 사항을 이해하는 데 도움이 됩니다.

오토데스크에서 고객님께 적합한 경험을 제공해 드리기 위해 고객님의 데이터를 수집하고 사용하도록 허용하시겠습니까?

선택할 수 있는 옵션을 자세히 알아보려면 이 사이트의 개인 정보 설정을 관리해 사용자화된 경험으로 어떤 이점을 얻을 수 있는지 살펴보거나 오토데스크 개인정보 처리방침 정책을 확인해 보십시오.