Description
Key Learnings
- Identify the benefits of using BIM for facility management for facility directors and explain how it affects costs
- List the differences between using BIM or CAD for facility management
- Explain how to blend a new project done in Revit®-based software into existing building information established in CAD format
- Describe the strategy and best practices used at each hospital that guided these projects from design to construction
Speaker
- MHMark HandyMark Handy is Director of the multidisciplinary Facilities Management Practice at BSA LifeStructures. He has been with the firm since 1985 and applies his depth of design and project management experience to his focus on facility life cycle knowledge management. He leads the firm's efforts from the construction and design phases into the facility lifecycle phase, by employing design software such as Revit®, Navisworks® and AutoCAD® MEP - allowing his team to add value to their clients by strategically aligning physical assets to organizational business plans. Mark's healthcare background and familiarity with the Joint Commission and other regulatory agencies drives the creation of flexible and robust data repositories that prepare his clients for JCAHO audits and inspections. Mark has conducted FM services for more than 20 million square feet of facilities for multiple Midwestern clients since 1996.
No transcript
Downloads
Tags
Product | |
Industries | |
Topics |