Adam Sjödin—urban planner and digital strategist with Sweco Architects based in Stockholm, Sweden—will detail project timelines and how data and design flow between geographic information systems (GIS), Spacemaker, Sweco's in-house carbon-calculation tool C3, and Revit software. Projects often employ tools such as GIS, Spacemaker, Revit, or all of the above, but the different contributors and stakeholders are frequently stuck in silos, focusing simply on their immediate needs and not a project’s full timeline, which makes them inefficient. To mitigate this, Sweco has developed methods and workflows to streamline the flow of data in projects and to digitalize this process and utilize all available and new data early on. This ensures that the project starts on the right foot, workflows are efficient, and all of the data is available and utilized. With this method, you can pinpoint a place of interest, analyze the potential of the site, and work through to a finished project.