This class will show how Building Information Modeling (BIM) is used to help coordinate construction of a complex intersection of a utility tunnel in China. Animations were made to show the removal of the existing pipelines, the traffic control, and the construction sequence of the utility tunnel. Project scheduling management, hazard identification, and quality control using BIM were also carried out. Through this class, attendees will get a taste of BIM implementation in China.

主要学习内容

  • Learn about BIM coordination in a complex construction project
  • Learn about hazard identification on the construction site
  • Learn about QC in construction
  • Learn how to manage a complicated construction project

讲师

  • Sheng Bao
    Dr. Sheng Bao received his Ph. D in Civil Engineering from Illinois Institute of Technology in 2007. He is now an associate professor in Civil Engineeringin Zhejiang University in China. He is also a founder and CEO of a BIM consulting firm in China, Hangzhou Rui Xing Dong Yu Building Technology Co., Ltd. He is actively involved in BIM implementation in construction and facility management.
Video Player is loading.
Current Time 0:00
Duration 43:52
Loaded: 0.38%
Stream Type LIVE
Remaining Time 43:52
 
1x
  • Chapters
  • descriptions off, selected
  • en (Main), selected
Transcript

SHENG BAO: The afternoon, everyone. I'm very happy that I have this opportunity to share with you about BIM implementation of the construction of a utility tunnel in China. BIM is really getting popular in China for recent years. And we are doing consulting for the contractor. This is their first time doing BIM and we learn along the way. First I'll show video so that you'll get a better understanding on this project. This is the video we do for the contractor.

This comprehensive--

Hmm. Something wrong with the-- hmm. I don't know. Well, it's showing on my computer, but it can not be--

AUDIENCE: [INAUDIBLE]

SHENG BAO: OK. Anyway we a--

AUDIENCE: Is it an extended desktop possibly and you can move it over. You can slide it over.

SHENG BAO: Oh, it's good? OK. OK. So this is the animation we did it for the contractor.

[VIDEO PLAYBACK]

[MUSIC PLAYING]

- This comprehensive infrastructure enhancement project what the construction of an underground utility tunnel, an overpass, and a road in a major city in southern China. The project is 7.86 kilometers long and has five contract segments. The estimated overall cost is about 1.9 billion yuan, and the construction cost is about 1.5 billion yuan. In this project, there are four bridges that need to be demolished and rebuilt. Also, there are many existing municipal pipelines, including sewage, water supply, electricity, communication, gas, and drainage.

The project is two stages-- the existing pipeline replacement stage and the main construction stage. First, construct new sewage pipes on the north side of the road and remove the ones on the south side. Second, construct the utility tunnel and the overpass. This can be further divided into the following five steps. First, contract the utility tunnel and the substructure of the overpass. The fence is set on the south side and then the construction of the utility tunnel as well as the foundations, piers, and bearings of the overpass will be carried out.

Second, build the northern parts of the bridges. After the southern parts are open to traffic, demolish and rebuild the northern parts of the bridges. Third, construct the overpass superstructure, including the bent caps, the box gutters, as well as the road pavement. Fourth, construct the ramps of the bridges. Finally, we covered the landscape and construct the barriers separating motorized vehicles and the bicycles.

The construction of the tunnel is divided into six work zones that carry out work simultaneously. The third work zone was constructed first. The tunnel length is 204 meters, and the construction was completed on July 30, 2017. The utility tunnel contains water and a communications section, electricity section, gas section, and a rainwater section. The design of rainwater section is aimed at collecting the rainwater on the overpass, which can be used for agriculture irrigation. The water storage capacity is about 15,000 cubic meters. Most of the retaining walls of the utility tunnel are Soil Mixing Walls and the others are a combination of board piles and jet grouting piles.

The utility tunnel is cast in place with street pouring. The first step is pouring the bottom plate. The second step is pouring rainwater section. The third step is pouring the sidewalls and roots using traveling tunnel form.

Engineering challenges in the project mainly include the followings. First, this project is located in urban area with heavy traffic and many intersections, which leads to various construction scopes, tight schedule, and complicated traffic control. Second, in the sixth work zone, to avoid collisions, the utility tunnel passes downward and upward the main sewage pipelines, two bridges, and another utility tunnel. This makes the construction more challenging.

Third, the project involves the protection for the existing pipelines, especially the main sewage pipe lines close to the deep excavation or under the utility tunnel. The construction process is complicated, and the protection of the pipelines is of great importance. Finally, the project includes cofferdam construction in many locations. Before the construction of the utility tunnel, the existing bridges need to be demolished followed by the construction of the cofferdam. Their requirements for excavation deformation control is direct. And a flood prevention as well as the water and sand gushing control is of great difficulty.

In this project, BIM is mainly carried out in the following aspect. First, collaboration program. A WeChat program was developed for collaboration. The texts and images can be sorted and stored separately according to a different field issues. It can also display whether a problem is resolved or not to standardize the work process. Besides, by using a BIM platform, model navigation, markup adding, and document management can be done on the browser. Second, 3D clarification of construction techniques. With the help of 3D models, construction animations and VR technology constructability reviews were carried out to help workers understand the construction scopes in details.

Third, construction review and clash detection. During modeling, the CAD drawing were coordinated to eliminate design mistakes. Before construction, clash detection was carried out to eliminate conflicts among the tunnel, existing pipelines, and the auxiliary structures. Fourth, schedule management. Use 4D simulation to track down the missing project information and the potential conflicts in advance. Different colors were used in the model to distinguish the actual construction process from the planned one, which can help managers with schedule control.

Fifth, quantity takeoff. Link the construction schedule to this 3D model. As the project proceeds, extract quantities from the model, make cost estimates for each stage, and promptly adjust the quantity takeoff for the design modification. The construction that the utility tunnels can eliminate the overhead power lines as well as utility lines installed and maintained without disrupting the streets above. As a result, widespread efforts are undertaken to construct utility tunnels in major cities of China. It is an important way to improve the city infrastructure and upgrade the quality of urbanization.

[END PLAYBACK]

SHENG BAO: OK, I hope this gives you some idea of the project that we are doing. And I have the Chinese version of this video. So the contractor like to show you that every time the client come to the site. So this class is about BIM implementation to improve the construction management of our complex intersection of a utility tunnel. So I hope at the end of this class, you will have a greater understanding of BIM coordination in the construction, and also field issue tracking, and schedule management. BIM applications in the construction and so BIM implementation.

So the contents include the following. The project-- so this is comprehensive with infrastructure enhancement the project in southern China. The total length is about 7.9 kilometer. The project cost is about $1.9 billion dollars. Construction scope is about the utility tunnel, elevated highway, four bridges, rainwater collector, and auxiliary structures. So we see from this picture that the engineering challenges include numerous existing pipelines. These pipelines are below the existing roadways, and there are a couple of intersections, the roadway and utility tunnel. So the construction of these intersections are complex due to the complex traffic control and tight schedule.

And at certain locations, this utility tunnel has to go above this main sewage pipeline or under the river. So, the closest a distance between the sewage pipeline and utility tunnel is about half a meter. So the protection of the sewage pipeline is of great importance. As you can see, its very close to the bottom of the utility tunnel. And this shows the intersection of the roads. This shows the cofferdam construction at the location where the river and utility tunnel intersects.

So the goal of this project is to meet the requirements of the Construction Quality Acceptance Specification and to win the Qianjiang Cup. Its a construction cup. And also the BIM application in the construction and facility management. This is the first time for the contractor or the client to use BIM in the project. So the duration of the project is about two years. The construction of the utility tunnel is about one year.

And the first are we lay out BIM application processes with the contractor as to do the quantitative take of the scheduling, material management, and 3D clarification of construction techniques. And then we do the BIM modeling. So we use Revit combined with Civil 3D and the Dynamo to do the modeling. So we draw this alignment and the profile of the utility tunnel or the elevated highway first. And then you can see we draw the elevations. And then we export the points all of the piles, the location, and the elevation. And then delete the redundant data, and then import it in the Dynamo. We have a Dynamo program. And then we can create the contents, and the draw contents, drag the contents along the two lines. And then we can get the resulted utility tunnel or the elevated . Highway

And after we are done with the parametric modeling, we do the construction joining review. And find the contradictions between the plan and the elevation. We find out about 27 errors. And we issued construction joint review report to the contractor. At certain locations, like this one, at a certain locations, we can see that the designed pipeline is actually under the utility tunnel. So that means they have to construct the pipeline first and then construct the utility line. Usually the existing pipeline is above the utility tunnel. So, this can be more clearly seen in the 3D model as opposed to the 2D joins. There are a couple of locations and this appears.

And then after the construction joint review, we do the clash detection of the structures and pipelines. We developed a little program to draw the-- first that they have to detect that the existing pipelines under the roadway. And then we developed a little program to draw the existing pipelines according to the Excel sheet, the actual location. And then we put together the pipelines, the utility tunnel, the bearing walls, the piles of the elevated highway, and we put it there together on this model. And then we do this clash detection. We found out about 250 clashes.

And we also developed a WeChat program to track down these clashes. WeChat is widely used in China. It's about 200 million people are using which program to communicate in China, but this WeChat program, they dumping all the issue in one group of communication. You cannot sort out the communication of different issues or the photos of different issue. So we developed a program based on the WeChat to sort out the different questions and store all the data, the photo, or the text on the back stage. And then we track that issue until it solved.

And also, you can find that the clash between the support beam and the auxiliary structures, in the try out section, they have to remove this-- the support beam has to be removed before the actual auxiliary structure of construction can be carried out. That's a delay of construction time. So they move this-- so they move this supported beam away from the auxiliary structure, so that the construction can be carried out simultaneously. You can see this is in the tryout section, they are removing their supporting beam.

Collaboration platform. Like I said, the WeChat program is widely used. And its an app to installed on the phone. Because we tried out BIM Field in the iPad, but people are not that willing to use iPad in the field. And its also depend on the internet speed or something. But the WeChat, everybody uses WeChat, everybody has a cell phone, so we found that it's more convenient and practical to do this collaboration, field the issue of tracking based on this. That's why we developed this program to do field issue of tracking, schedule management, process management.

I talked a little bit about field issue tracking. I'll talk a little bit more about the schedule management later on. Schedule management. So this is what they do in the field about construction planning. They have Gantt chart to do this scheduling management, but it's not that useful. It's not that practical as this construction goes on. Well, anyway, we did this 4D simulation anyway. This is what they posted in site about the actual construction, what's completed. We developed a WeChat program to do the schedule management.

First, we talked to them and decide that what's they are going to do for the following month as the actual construction goes on, lay out what they will do for the following month, for each displaying how much concrete we'll pour, how much the reinforcement will be done. And then we collect these actual construction work in the field for each week for each discipline. And then we updated this information in the WeChat program and stored in the backstage. And then we analyzed the efficiency of each team and make predictions about the for the following work.

Also, we used a low-cost Chinese platform, BIM 365. It's a web-based browser to display the actual construction completed or delayed. Yeah, you can do the add mark or comments on this problem. 3D clarification. So we used mobile, iPad, or VR, or 3D printing to do this 3D clarification of construction techniques. We make construction animations to show that the construction of the intersection of the utility tunnel. And this is-- yeah, this video about the construction of the cofferdam and the construction of the utility tunnel. We have to build the southern part of the utility tunnel first. This is the pipeline to keep the water flowing. And then we do the northern part of the bridge.

And this is animation done by 3d Max to show the construction of the utility tunnel.

And before the field the work is carried out to we, do this meeting to show this construction review. And then we use the iPad using 360 Glue to show this detail the construction techniques on site. We also use the 3D printing to show that the structure of the intersection.

Virtual construction, like what do we watched, we have this animation to show the virtual construction. Traffic control-- so the construction of this intersection is complex, so we have five traffic control plans at the intersection. So, we use this animation to communicate with the traffic control department in the city, so that they can understand that this traffic control plan better and shorten the approval time. I have another-- yeah, this is the same. I have another video showing the construction of the utility tunnel in the intersection.

Yeah, so we have a different control plans so that it keeps the traffic going. And this shows the construction of the intersection of the utility tunnel.

We used the VR so that the client has a better view of the tunnel that they are going to construct. for quality control, we established a process that the guy doing the quality control measured the rebars behind the concrete. And then we have a checklist that what they need to take notes. And then we posted all this information by QR code, and posted on the wall. And also, we use this QR code to post to other important informations, including 2D drawings, the 3D model, and all the other important information, like material, and construction requirements, techniques.

For quantity take-off for this project, its about the concrete and steel rebars used in the utility tunnel. The steel rebar is a little different from the one used in the building. We actually have to draw all the rebars. It's a lot of work, so we do the rebars along the typical section of the utility tunnel for like 1 or 2 meters, and then we time the total length of the utility tunnel for the typical sections, and then we do the rebar joints for the exits or auxiliary structures, so it's comprised of two typical rebar sections.

Finally, about the BIM application in China. The Design Institute has tried out BIM for some years, but I don't think they do 3D collaborative design for the actual projects. Simply, they didn't have time to do these in-depth design in the front. So, what they really do is about clash detection and optimization of pipeline layout. That's what most of the design firm do. They put on some efforts, invest in training their staff in computer, buying computer and software several years ago, but their return on investment is relatively low. So right now, they're not really moving forward on the design part of the BIM.

For the contractors, it's they tried a BIM for the recent two or three years. They are very enthusiastic about the application right now. They think that the BIM will help them in the construction management, and willing to train their employees, and try out BIM application in their projects. But the lack of being specialists. And many of their contracts do BIM to increase the chance of winning the bidding or do the basic BIM functions, like quantity takeoff or quality control.

For the owners, well a lot of the bigger projects are invested by the government. And for the private ones, like the bigger real estate developer, like [? Wenke ?] or Wanda, they have tried BIM for quite some time. They are trying to develop their own BIM practice processes. For the government, although the overall return on rate of BIM in China is relatively low, but the government is really pushing forward on the technology innovation. And BIM is one of the major innovations in the AEC industry.

So the government is really pushing on this. And in the recent years, they have issued a lot of policy documents to encourage the industry to use the BIM. And although it is not mandatory in China, but I think that the-- because recently the EPCR, or engineering, procurement, construction, and modular construction in China is going really popular. I think more and more contractors will use BIM, will practice BIM. And now some of the onus or the state own their companies, they are willing to try out BIM in the facility of management, like the BIM application in hydrant. The owner also want us to try out the BIM in the facility management of utility tunnels.

So, my presentation is done. Anyone have questions can stay for the question and answer. Yeah.

AUDIENCE: I have a question. You said you managed [INAUDIBLE] or how do you manage [INAUDIBLE]

SHENG BAO: Yes, so we input all this clash issues in the app, and then we, as the construction goes on, we go to the site and make sure that the actual clashes resolved before the actual construction is carried out.

AUDIENCE: How do you are sure that when [INAUDIBLE] is it verified in some [INAUDIBLE]

SHENG BAO: Oh, well we have to put it in the app manually if it's solved or not.

AUDIENCE: Is that app still available for anyone to download, or is it just specifically made for your company?

SHENG BAO: Yes. We developed our own WeChat-based collaboration platform. We're also doing an English version, because I have some friends in the states, they also use the WeChat program to communicate to collaborate. I don't know if-- but in my group of people, they talk about the issues in the field and take photos, and yeah.

AUDIENCE: [INAUDIBLE] Do you think it's available for anyone to download or is it just for you guys?

SHENG BAO: Just for us, but later on we might want to promote it. Yeah.

AUDIENCE: Yeah, I have a question about [INAUDIBLE]

SHENG BAO: 365. You mean 365?

AUDIENCE: [INAUDIBLE]

SHENG BAO: I don't really understand your question.

AUDIENCE: For our existing utilities, [INAUDIBLE] on the ground, [INAUDIBLE]

[INTERPOSING VOICES]

SHENG BAO: They detected in the field about the location of the existing pipelines first, and then they gave you a location thing to the location and the depth of the pipelines. So we draw.

AUDIENCE: Existing utilities they were located and then stored in what software?

SHENG BAO: In Excel.

AUDIENCE: Do you use Excel? [INAUDIBLE]

SHENG BAO: Yeah, yes.

AUDIENCE: OK, so what software you use? Does it have three-dimensional [INAUDIBLE]?

SHENG BAO: We just developed a little computer program to import--

AUDIENCE: OK, which do you use? This was done in Civil 3D? You use this in [INAUDIBLE] What you use them on?

SHENG BAO: We using Civil 3D.

AUDIENCE: OK, thank you. Thank you.

SHENG BAO: Any question? All right. OK, thank you.

______
icon-svg-close-thick

Cookie 首选项

您的隐私对我们非常重要,为您提供出色的体验是我们的责任。为了帮助自定义信息和构建应用程序,我们会收集有关您如何使用此站点的数据。

我们是否可以收集并使用您的数据?

详细了解我们使用的第三方服务以及我们的隐私声明

绝对必要 – 我们的网站正常运行并为您提供服务所必需的

通过这些 Cookie,我们可以记录您的偏好或登录信息,响应您的请求或完成购物车中物品或服务的订购。

改善您的体验 – 使我们能够为您展示与您相关的内容

通过这些 Cookie,我们可以提供增强的功能和个性化服务。可能由我们或第三方提供商进行设置,我们会利用其服务为您提供定制的信息和体验。如果您不允许使用这些 Cookie,可能会无法使用某些或全部服务。

定制您的广告 – 允许我们为您提供针对性的广告

这些 Cookie 会根据您的活动和兴趣收集有关您的数据,以便向您显示相关广告并跟踪其效果。通过收集这些数据,我们可以更有针对性地向您显示与您的兴趣相关的广告。如果您不允许使用这些 Cookie,您看到的广告将缺乏针对性。

icon-svg-close-thick

第三方服务

详细了解每个类别中我们所用的第三方服务,以及我们如何使用所收集的与您的网络活动相关的数据。

icon-svg-hide-thick

icon-svg-show-thick

绝对必要 – 我们的网站正常运行并为您提供服务所必需的

Qualtrics
我们通过 Qualtrics 借助调查或联机表单获得您的反馈。您可能会被随机选定参与某项调查,或者您可以主动向我们提供反馈。填写调查之前,我们将收集数据以更好地了解您所执行的操作。这有助于我们解决您可能遇到的问题。. Qualtrics 隐私政策
Akamai mPulse
我们通过 Akamai mPulse 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Akamai mPulse 隐私政策
Digital River
我们通过 Digital River 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Digital River 隐私政策
Dynatrace
我们通过 Dynatrace 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Dynatrace 隐私政策
Khoros
我们通过 Khoros 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Khoros 隐私政策
Launch Darkly
我们通过 Launch Darkly 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Launch Darkly 隐私政策
New Relic
我们通过 New Relic 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. New Relic 隐私政策
Salesforce Live Agent
我们通过 Salesforce Live Agent 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Salesforce Live Agent 隐私政策
Wistia
我们通过 Wistia 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Wistia 隐私政策
Tealium
我们通过 Tealium 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Tealium 隐私政策
Upsellit
我们通过 Upsellit 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Upsellit 隐私政策
CJ Affiliates
我们通过 CJ Affiliates 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. CJ Affiliates 隐私政策
Commission Factory
我们通过 Commission Factory 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Commission Factory 隐私政策
Google Analytics (Strictly Necessary)
我们通过 Google Analytics (Strictly Necessary) 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Google Analytics (Strictly Necessary) 隐私政策
Typepad Stats
我们通过 Typepad Stats 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Typepad Stats 隐私政策
Geo Targetly
我们使用 Geo Targetly 将网站访问者引导至最合适的网页并/或根据他们的位置提供量身定制的内容。 Geo Targetly 使用网站访问者的 IP 地址确定访问者设备的大致位置。 这有助于确保访问者以其(最有可能的)本地语言浏览内容。Geo Targetly 隐私政策
SpeedCurve
我们使用 SpeedCurve 来监控和衡量您的网站体验的性能,具体因素为网页加载时间以及后续元素(如图像、脚本和文本)的响应能力。SpeedCurve 隐私政策
Qualified
Qualified is the Autodesk Live Chat agent platform. This platform provides services to allow our customers to communicate in real-time with Autodesk support. We may collect unique ID for specific browser sessions during a chat. Qualified Privacy Policy

icon-svg-hide-thick

icon-svg-show-thick

改善您的体验 – 使我们能够为您展示与您相关的内容

Google Optimize
我们通过 Google Optimize 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Google Optimize 隐私政策
ClickTale
我们通过 ClickTale 更好地了解您可能会在站点的哪些方面遇到困难。我们通过会话记录来帮助了解您与站点的交互方式,包括页面上的各种元素。将隐藏可能会识别个人身份的信息,而不会收集此信息。. ClickTale 隐私政策
OneSignal
我们通过 OneSignal 在 OneSignal 提供支持的站点上投放数字广告。根据 OneSignal 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 OneSignal 收集的与您相关的数据相整合。我们利用发送给 OneSignal 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. OneSignal 隐私政策
Optimizely
我们通过 Optimizely 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Optimizely 隐私政策
Amplitude
我们通过 Amplitude 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Amplitude 隐私政策
Snowplow
我们通过 Snowplow 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Snowplow 隐私政策
UserVoice
我们通过 UserVoice 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. UserVoice 隐私政策
Clearbit
Clearbit 允许实时数据扩充,为客户提供个性化且相关的体验。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。Clearbit 隐私政策
YouTube
YouTube 是一个视频共享平台,允许用户在我们的网站上查看和共享嵌入视频。YouTube 提供关于视频性能的观看指标。 YouTube 隐私政策

icon-svg-hide-thick

icon-svg-show-thick

定制您的广告 – 允许我们为您提供针对性的广告

Adobe Analytics
我们通过 Adobe Analytics 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Adobe Analytics 隐私政策
Google Analytics (Web Analytics)
我们通过 Google Analytics (Web Analytics) 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Google Analytics (Web Analytics) 隐私政策
AdWords
我们通过 AdWords 在 AdWords 提供支持的站点上投放数字广告。根据 AdWords 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 AdWords 收集的与您相关的数据相整合。我们利用发送给 AdWords 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. AdWords 隐私政策
Marketo
我们通过 Marketo 更及时地向您发送相关电子邮件内容。为此,我们收集与以下各项相关的数据:您的网络活动,您对我们所发送电子邮件的响应。收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、电子邮件打开率、单击的链接等。我们可能会将此数据与从其他信息源收集的数据相整合,以根据高级分析处理方法向您提供改进的销售体验或客户服务体验以及更相关的内容。. Marketo 隐私政策
Doubleclick
我们通过 Doubleclick 在 Doubleclick 提供支持的站点上投放数字广告。根据 Doubleclick 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Doubleclick 收集的与您相关的数据相整合。我们利用发送给 Doubleclick 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Doubleclick 隐私政策
HubSpot
我们通过 HubSpot 更及时地向您发送相关电子邮件内容。为此,我们收集与以下各项相关的数据:您的网络活动,您对我们所发送电子邮件的响应。收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、电子邮件打开率、单击的链接等。. HubSpot 隐私政策
Twitter
我们通过 Twitter 在 Twitter 提供支持的站点上投放数字广告。根据 Twitter 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Twitter 收集的与您相关的数据相整合。我们利用发送给 Twitter 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Twitter 隐私政策
Facebook
我们通过 Facebook 在 Facebook 提供支持的站点上投放数字广告。根据 Facebook 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Facebook 收集的与您相关的数据相整合。我们利用发送给 Facebook 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Facebook 隐私政策
LinkedIn
我们通过 LinkedIn 在 LinkedIn 提供支持的站点上投放数字广告。根据 LinkedIn 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 LinkedIn 收集的与您相关的数据相整合。我们利用发送给 LinkedIn 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. LinkedIn 隐私政策
Yahoo! Japan
我们通过 Yahoo! Japan 在 Yahoo! Japan 提供支持的站点上投放数字广告。根据 Yahoo! Japan 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Yahoo! Japan 收集的与您相关的数据相整合。我们利用发送给 Yahoo! Japan 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Yahoo! Japan 隐私政策
Naver
我们通过 Naver 在 Naver 提供支持的站点上投放数字广告。根据 Naver 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Naver 收集的与您相关的数据相整合。我们利用发送给 Naver 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Naver 隐私政策
Quantcast
我们通过 Quantcast 在 Quantcast 提供支持的站点上投放数字广告。根据 Quantcast 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Quantcast 收集的与您相关的数据相整合。我们利用发送给 Quantcast 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Quantcast 隐私政策
Call Tracking
我们通过 Call Tracking 为推广活动提供专属的电话号码。从而,使您可以更快地联系我们的支持人员并帮助我们更精确地评估我们的表现。我们可能会通过提供的电话号码收集与您在站点中的活动相关的数据。. Call Tracking 隐私政策
Wunderkind
我们通过 Wunderkind 在 Wunderkind 提供支持的站点上投放数字广告。根据 Wunderkind 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Wunderkind 收集的与您相关的数据相整合。我们利用发送给 Wunderkind 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Wunderkind 隐私政策
ADC Media
我们通过 ADC Media 在 ADC Media 提供支持的站点上投放数字广告。根据 ADC Media 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 ADC Media 收集的与您相关的数据相整合。我们利用发送给 ADC Media 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. ADC Media 隐私政策
AgrantSEM
我们通过 AgrantSEM 在 AgrantSEM 提供支持的站点上投放数字广告。根据 AgrantSEM 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 AgrantSEM 收集的与您相关的数据相整合。我们利用发送给 AgrantSEM 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. AgrantSEM 隐私政策
Bidtellect
我们通过 Bidtellect 在 Bidtellect 提供支持的站点上投放数字广告。根据 Bidtellect 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Bidtellect 收集的与您相关的数据相整合。我们利用发送给 Bidtellect 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Bidtellect 隐私政策
Bing
我们通过 Bing 在 Bing 提供支持的站点上投放数字广告。根据 Bing 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Bing 收集的与您相关的数据相整合。我们利用发送给 Bing 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Bing 隐私政策
G2Crowd
我们通过 G2Crowd 在 G2Crowd 提供支持的站点上投放数字广告。根据 G2Crowd 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 G2Crowd 收集的与您相关的数据相整合。我们利用发送给 G2Crowd 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. G2Crowd 隐私政策
NMPI Display
我们通过 NMPI Display 在 NMPI Display 提供支持的站点上投放数字广告。根据 NMPI Display 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 NMPI Display 收集的与您相关的数据相整合。我们利用发送给 NMPI Display 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. NMPI Display 隐私政策
VK
我们通过 VK 在 VK 提供支持的站点上投放数字广告。根据 VK 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 VK 收集的与您相关的数据相整合。我们利用发送给 VK 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. VK 隐私政策
Adobe Target
我们通过 Adobe Target 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Adobe Target 隐私政策
Google Analytics (Advertising)
我们通过 Google Analytics (Advertising) 在 Google Analytics (Advertising) 提供支持的站点上投放数字广告。根据 Google Analytics (Advertising) 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Google Analytics (Advertising) 收集的与您相关的数据相整合。我们利用发送给 Google Analytics (Advertising) 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Google Analytics (Advertising) 隐私政策
Trendkite
我们通过 Trendkite 在 Trendkite 提供支持的站点上投放数字广告。根据 Trendkite 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Trendkite 收集的与您相关的数据相整合。我们利用发送给 Trendkite 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Trendkite 隐私政策
Hotjar
我们通过 Hotjar 在 Hotjar 提供支持的站点上投放数字广告。根据 Hotjar 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Hotjar 收集的与您相关的数据相整合。我们利用发送给 Hotjar 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Hotjar 隐私政策
6 Sense
我们通过 6 Sense 在 6 Sense 提供支持的站点上投放数字广告。根据 6 Sense 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 6 Sense 收集的与您相关的数据相整合。我们利用发送给 6 Sense 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. 6 Sense 隐私政策
Terminus
我们通过 Terminus 在 Terminus 提供支持的站点上投放数字广告。根据 Terminus 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Terminus 收集的与您相关的数据相整合。我们利用发送给 Terminus 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Terminus 隐私政策
StackAdapt
我们通过 StackAdapt 在 StackAdapt 提供支持的站点上投放数字广告。根据 StackAdapt 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 StackAdapt 收集的与您相关的数据相整合。我们利用发送给 StackAdapt 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. StackAdapt 隐私政策
The Trade Desk
我们通过 The Trade Desk 在 The Trade Desk 提供支持的站点上投放数字广告。根据 The Trade Desk 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 The Trade Desk 收集的与您相关的数据相整合。我们利用发送给 The Trade Desk 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. The Trade Desk 隐私政策
RollWorks
We use RollWorks to deploy digital advertising on sites supported by RollWorks. Ads are based on both RollWorks data and behavioral data that we collect while you’re on our sites. The data we collect may include pages you’ve visited, trials you’ve initiated, videos you’ve played, purchases you’ve made, and your IP address or device ID. This information may be combined with data that RollWorks has collected from you. We use the data that we provide to RollWorks to better customize your digital advertising experience and present you with more relevant ads. RollWorks Privacy Policy

是否确定要简化联机体验?

我们希望您能够从我们这里获得良好体验。对于上一屏幕中的类别,如果选择“是”,我们将收集并使用您的数据以自定义您的体验并为您构建更好的应用程序。您可以访问我们的“隐私声明”,根据需要更改您的设置。

个性化您的体验,选择由您来做。

我们重视隐私权。我们收集的数据可以帮助我们了解您对我们产品的使用情况、您可能感兴趣的信息以及我们可以在哪些方面做出改善以使您与 Autodesk 的沟通更为顺畅。

我们是否可以收集并使用您的数据,从而为您打造个性化的体验?

通过管理您在此站点的隐私设置来了解个性化体验的好处,或访问我们的隐私声明详细了解您的可用选项。