说明
主要学习内容
- Advocate for software development to support :Lean-model-based workflows
- Describe the full lifecycle of a model from proposal to construction
- Explain the value that model visualization of a schedule can have
- Learn Lean workflows related to Last Planner scheduling
讲师
- NWNathan WoodNathan Wood has emerged as an innovation thought leader across the Architecture, Engineering, and Construction (AEC) industry. Nathan’s experiences with Virtual Design and Construction (VDC), Lean process improvement, and Integrated Project Delivery (IPD) have led him to realize how even proven technology solutions can often result in adoption failure and lost ROI. As Executive Director of the Construction Progress Coalition (ConstructionProgress.org), Nathan blends his passion for open collaboration with real-world skepticism to produce a pragmatic strategy digital standards adoption in design and construction. When not fighting for open standards, Nathan also supports the people and process transformation as Chief Enabling Officer of SpectrumAEC. Nathan continues to support industry progress through speaking engagements, research publications, and workshop facilitation.
No transcript
标记
产品 | |
行业 | |
主题 |