AU Class
AU Class
class - AU

Designing Low-Impact Infrastructures: Carbon Footprint and Safety Uses Cases

共享此课程
在视频、演示文稿幻灯片和讲义中搜索关键字:

说明

The ultimate objective of BIM (Building Information Modeling) is to design, construct, and operate more-efficient infrastructures with less impact to the environment. SYSTRA R&D teams developed two web-based solutions—CARBONTracker and SAFEbyBIM—to better simulate carbon emissions and reduce safety risks on projects using Forge and ArcGIS. This presentation will immerse you in a virtual demonstration of a project design review to show the benefits that BIM can provide ecodesigners and safety managers in their daily challenges to reduce these environmental and human impacts. The presentation will be in two parts. First, there will be a description of both applications’ functionalities. Then, we’ll perform a simulation of a design review around an asset to show how these solutions can support a more efficient integration of these disciplines into design processes by being able to extract the BIM data that’s created to provide the right information to the design teams in order to make design decisions taking into account carbon and safety impacts.

主要学习内容

  • Learn about how BIM data can support more efficient safety risk management on a project
  • Better understand how BIM data can support more efficient integration of ecodesign objectives in a design process
  • Better understand how the Forge platform can foster the BIM data management on your project
  • Better understand the benefit of BIM data structuration on a project

讲师

  • Lucas GIBAUD 的头像
    Lucas GIBAUD
    Lucas has developed a strong expertise in BIM technologies and data management on large projects such as the Grand Paris Express or HS2 MWCC. He leads the BIM Production business network bringing together the international BIM experts of the SYSTRA group (more than 30 referents and around 900 members). He is also responsible for the development of internal tools on business applications (mainly Civil 3D, Revit, Forge, ProjectWise, Excel) and provides international deployment / support. He is responsible for structuring innovation subjects for the SYSTRA group such as the register of BIM objects and is involved in the BIM4Asset group which aims to support the capacity of the SYSTRA group to create, manage and use the BIM data of railway assets during their entire life cycle. Finally, he has a very good understanding of the technical issues faced by operational teams due to his project experience as a CAD / BIM Production Manager, which allows him to organize technical support for CAD / BIM tools at SYSTRA group level.
Video Player is loading.
Current Time 0:00
Duration 38:26
Loaded: 0.43%
Stream Type LIVE
Remaining Time 38:26
 
1x
  • Chapters
  • descriptions off, selected
  • en (Main), selected
Transcript

ERIC PRUVOST: Welcome to this AU class. I am Eric Pruvost, and together with Lucas Gibaud, we will explain to you how to use BIM data and technologies to design low impact infrastructures.

Before starting, a few words about us. Lucas Gibaud is leading the development of several BIM solutions, and I am in charge of SYSTRA BIM transformation program.

Let me start with a quick introduction of the subject. As stated by Pierre Verzat, our chief executive officer, our ambition at SYSTRA is to be the signature team for transportation solution. Stating that brings responsibilities. In particular, it means that we must deliver infrastructures that are always safer and more sustainable.

To meet our ambitions, we have defined six major challenges that our BIM research and development program should tackle in order to support our teams to deliver railway project with innovating solution that will meet our client challenges.

Today, we will provide you insights on the two solutions that help our design team to reduce greenhouse gas emissions and reduce safety related risk on our projects.

But it is, in fact, a full range of solutions that have been developed to create, manage, and use BIM data to improve the efficiency of our design teams.

In the field of data creation, we have developed since more than five years 12 modules of our linear infrastructure design authoring solution, BiMinOneClick that allow to automate the design of railway infrastructures.

In the field of data management, since 2018, we have developed two applications, eLODy and Pablo. eLODy is our BIM checker that enables us to manage BIM design quality and ensure that data delivered to our client is fully reliable.

Pablo is a unique tool that has been developed based on our return of experience on HS2 to support our client to build that BIM asset information register and requirements and manage the BIM data in order to develop the asset information model.

Nevertheless, today, we will focus on Carbon Tracker and SafebyBIM applications that are designed to deliver low carbon and low safety related risk infrastructures.

So let's dive into the main part, which is how to use BIM data to manage and reduce the carbon impact of the infrastructure we design.

Trusting to say is that we are all concerned. Nevertheless, as a designer, we have a major role to play in this battle against carbon emissions. Indeed, it is fully recognized that most of the future carbon emission of an infrastructure are already locked in before the end of the design. Therefore, as a designer, we can make a difference.

Knowing that, we design Carbon Tracker application to make sure that the design teams have the right information about carbon emissions at the right time in order to take the right decisions. The first challenge and main functionality of Carbon Tracker is to allow to capture the data of the design in order to provide the carbon impact during the design process. By doing so, we meet our first objective to implement a more systemic co-design process fully integrated in the design process. And that ensure that, again, all the design decisions will be taking into account its carbon impact.

The second objective of the application is to allow our design team to better collaborate and be as efficient as possible by focusing first on carbon hotspots. This is achieved by providing managing tools to visualize, compare, and filter emissions, and identify where to put design efforts.

Finally, the last objective is more a mid-term one. By implementing the solution, we will be able to capitalize on our experience and improve our capacity to evaluate precisely carbon emissions at even early design stages.

So before diving into the demo, let me give you a quick overview of the solution, which is built around three parts. First, the configuration. Second, the calculation. And finally, the monitoring of the carbon impact.

Let's start with the configuration. This part is the strategic part of the solution. It is designed to overcome the project environment and stability we face on our daily jobs and the lack of open BIM standards. It allows us to adapt the solution to the project requirements and make sure that the data that will be imported in the solution will be understood and correctly treated based on expected requirements.

In particular, it defines the mandatory information that will have to be modeled and that will be checked by the application prior to any CO2 calculation. The calculation part use, of course, the BIM technology to calculate the carbon emissions. The calculation can integrate the CO2 emissions due to the construction but also to the operation of the assets.

It is key to understand that the solution is designed to calculate the CO2 impact using mixed data extracted from the project, BIM and non BIM. And this, in order to adapt to the BIM maturity of the project. Please note that we have also developed a tool using GIS technology for the carbon calculation due to transportation.

As I said earlier, Carbon Tracker solution is meant to support the design team to manage a carbon impact alongside the design process. So this last part gives the information needed by the project management but also by the design expert in order to take this decision and track the carbon emissions.

Here you have the main dashboard that allows the team to follow the CO2 calculation progress and the performance of the assets.

And there, on this last slide, you have an extract on the CO2 tracker tool that helps the co- designer to analyze the CO2 emission distribution, define the hot spot, and focus on or compare design alternatives.

So I will give now the mic to Lucas Gibaud that will give you a demo on Carbon Tracker.

LUCAS GIBAUD: Hello. So before going forward with the demo and enter the application, just some quick words to share the summary and a schema to talk about the project asset break down.

So for the demo, we will first start with the presentation of the project page, and then we will have a quick overview of the project configuration page. After this, the next step will be to integrate a new model into our project and to get the result of the carbon calculation of its components.

As most of our projects, we are working on are not fully in BIM, and as explained by Eric previously, it's very important to integrate all the data of the project to have a complete carbon analysis. For that, we will review how we can directly in the application integrate this non BIM data. And to finish, we will put ourselves in a co-designer shoes, and we will try to reduce the carbon emission of our project using Varient Management and Analysis Tools we can find in Carbon Tracker.

Before going on the Carbon Tracker application, one important thing to explain is the asset breakdown of the projects. This will help you to better understand what we will see during the demo. In order to have a better analysis of the carbon emission distribution, and not to only have a global approach of a project, we will split all our projects in several sections that we will call assets.

Each assets are similar properties. So let's take the first example on the top right corner. Each asset has a specific goal. The asset has also a specific type, which is your development asset type. The list of all the asset types has to be defined at the beginning of the project, and we will see that this list will be stored in the project configuration in Carbon Tracker.

And finally, each asset is composed by several files. You can see here that the specific asset is composed by 4b models which are IFC files and one non-BIM data file, which is an Excel file. The second example at the bottom left of the screen is the one we will see later during the demo. This one is another asset type, which is a viaduct asset type. This asset is composed of one non- BIM data file and one BIM model, which is the file we will try to integrate in Carbon Tracker in a few minutes.

So now, let's move to the application. Here is the project hub where any user can find all its accessible projects. Carbon Tracker is a web application, so you can use any internet browser to connect. On this project of page, the user can go from one project into another using the Activate button. Once you have selected the projects you are working on, you can go to the project configuration page.

The project configuration page is composed by several sections. The first one is quite basic, and this is the project information section. Then, you have the second part, which is the project backups. This one is quite important. And it's the place where the user can basically store the state of the project. And of course, will be later capable of restoring the backup state.

The subparts is the co- design configuration. This is the place where the co- designer can set up the hypothesis that the software will take for the carbon calculations. As discussed earlier on this slide, we have seen that we need to split our project in multiple assets. So the asset lease section is the place where the eco- designer will define the list of all the asset of the project, defining the code and the type of each assets.

Then, the next part is the transport configuration. This is the place where you will define the transport combination options of your project components.

The next part is very important and is the project component database. This is where you will define all the calculation inputs that you will be taken into account to calculate the carbon emission of each project components.

The last three section of the project configuration are the settings in order to be able to read the data coming from the models and from the other type of files. This is the place where you will define the property names that the software will use to get all the data from these models. You will find also a section where you will be able to define the chicken routes you will use in the BIM models.

This will help you to ensure that the data of the BIM models are compliant with the requirements of carbon calculation. But we will see this during the integration of the BIM model into Carbon Tracker just now.

As explained earlier in the slide, we will try to integrate a new BIM model in the project, which is a viaducts. For that, we have to go in the model playground page. Display this page is the place where any user we upload the new data in the project. Either it's a BIM model or other type of data, like an Excel file, we will see just after.

For BIM models, the user can upload them directly on Carbon Tracker and clicking on the button load. You can download a single file or multiple files at one time. As soon as the model is uploaded, Carbon Tracker will use forge APIs to be able to convert BIM model's input formats to a specific format that can be viewable on the forge viewer.

As soon as the conversion is completed, the file will be located on the left side of the screen. Then, you just have to click on the file to open the BIM Model Viewer. You can easily recognize the forge viewer that you have probably used within BIM 360, for example. So we have extended this year with some specific functionalities that you can see on the left side of the screen.

The first section, when you open a BIM model with Carbon Tracker, will be to check if the BIM model is ready and compliant with the project configuration. It means if the object of the model can be used for carbon calculations. For that, thanks to the parameter and the rules we have defined in the project configuration page, Carbon Tracker will proceed to a complete check of the BIM model.

In order to do that, you just need to click on the first button, and then to click on the button Apply. And directly, the process will run to check if all the project components are compliant with the requirements. The result will be directly displayed on the BIM model. In green, you will have all the objects that are compliant with the requirements, and you will have in blue all the elements that cannot be taken into account by the software for the carbon calculations.

Indeed, these elements do not contain an asset tag parameter or classification parameter. The observer turn of the application will help you to analyze and communicate these results. In order to have some analytics on the checking result, you can click on the second button, and you will reach the model analytics. You will find there the object figures with the number of objects in the model and the percentage of compliant objects.

Then, you have the asset figures, where you can find a number of elements that contains asset ties. It means we can link them to a specific asset of the project. And the last part is the classification figures. This is where you will find if the objects have been correctly classified. This classification is a very important topic of the application because it's the way the application will recognize the class of the object and will be able later to link an object to a project component that we have defined in the configuration.

When you have analyzed the result of the checking, it's quite important to be able to share these results with the other member of the project and to help the BIM production teams to modify their BIM models. For that, Carbon Tracker provide functionalities to export the results of the checkings in two different formats, Excel and BCF.

The BCF format is an open BIM format to share comments based on a BIM model, and that can be easily integrated in all the production software.

And finally, the last button on the left in the viewer will allow you to export the result to the database for the carbon calculations. On the panel, you will have the list of all the components that have been detected by the software, and that can be exported to the database. This will allow you to have a quick view on the results before sending them to the database.

When you are ready to send this, you can just click on the button on the top left, and this will launch the calculation and exit the viewer. Automatically, all the calculations are processed in the back end. So before checking the results, let's do the same process for a non BIM data file.

The example we will take is a carbon emission generated by the construction site accommodations. On earlier project, these assets are not designed in BIM, and these values are given most of the time by the constructors based on their experience. According to the size of the construction site, the number of workers, the construction timelines, and other inputs, they will estimate the carbon emissions generated by these accommodations.

These emissions are very important, and we cannot analyze correctly and globally our projects without taking this into consideration. For that, as this data cannot be calculated from the model, we will provide an Excel file. In Carbon Tracker, the process to calculate data from other type of file is quite similar than the one we have seen from the BIM model. We just have to go on the model program page and just upload your Excel file.

Then, as for the BIM model, the software will check the data contained in the Excel file is compliant with what we expect to receive. If not, the software will provide you warnings and explain what are the points to modify. If everything is correct, you can check the data that have been read by the software, and then you can send the data to the database for the carbon calculations.

So when the calculation has been done, you will want to check the result at the project level. For that, the user can go to the project cockpit page. On this page are presented all the result of the project according to multiple views. On the top left side you can find the global figures of the project. For example, you have the number of assets, the number of constituent parts of the project.

The constituent parts representing a BIM model context, BIM objects. Then you have the number of files that have been used on the project and the number of object types that have been defined in the project configuration and used in the project.

In the top right corner of the screen, you can find the project lifecycle results, which are the carbon emission of the project and that are classified by life cycle stage. The naming of this life cycle is very well known of the co- designer and is defined in the 14,000 40 ISO num series. To sum up this very quickly, A1 is revealed is the carbon emission due to the production of the components. A4 is the transport of them to construction site. A5 the emission produced by their installation and construction sites.

B2 is for the maintenance. B4 is for the replacement, and B6 is for the operation. It means the energy consumption of the component during the operation stage.

And C1 is for the demolition if, of course, the component has to be deconstructed.

As you can understand, the result we are displaying are related to the hypothesis that we have taken about the target year for the calculation. Here, the target here, is 120 years after the start of the construction of the project. Of course, to have a good analysis of the carbon emissions, we need to have the ability to view the result according different target shows.

That the functionality of the slider we have at the top right corner, which allows us to change the target year calculation and all the graphic of the cockpit will be modified dynamically. At the bottom of the cockpit, you have the asset types graphic, which allow the user to have a good view about the distribution of the carbon emissions across the different type of assets. Each bar represents the amount of carbon emissions generated by the different type of asset on the project.

This graphic can also be dynamically change with the target year slider. But you can also change its view to switch from the carbon emission to the tonnage of material to transport to the construction site.

The restriction is what you can see at the middle of the cockpit, which is the emission reduction. This result allows the project to compare its global emission with a baseline hypothesis that has been taken at the beginning of the project. For that, in Carbon Tracker, you can set the carbon immersion baseline from values in the project configuration over the second option is to select another project of the application.

So now, to conclude the demo, we will put ourselves in a co-designer shoes, and we will try to reduce the carbon emission of our project using Variant Management and Analysis Tools we have in Carbon Tracker. For that, the first thing we will do is to check the result with the analysis tools of Carbon Tracker. This tool will allow us to have a very good understanding of the carbon as part of our projects.

So it's a hierarchical pie chart that shows the distribution of the carbon emission across the project and based on multiple parameters. The hierarchy inside the pie is represented by the rings. By default, the hierarchy is the following. The first ring is the asset type. The second one is the asset instances. Then the third one is the object category. And finally, at the bottom of the hierarchy, you will find object types.

The figures at the center of the pie chart is the amount of carbon emission we are looking at when moving on the diagram. And the figures on the top next to the path we have taken in the diagram is a percentage of the carbon emission.

So if we change the hierarchy of the pie chart to have the object category and the object type at the first levels, we can see that the concrete foundation components have a huge impact on the project. The foundation components of the rigid inclusions, the concrete piles, concrete pilecaps, wooden slab, and so on. So in our example, we will try to reduce the carbon emission of a project in changing the concrete type of these components in using a less carbon emitting concrete.

So for that, we will go to the project configuration page. Before changing anything in the application, we will start by stirring the state of the project to be later capable of comparing the results with the current state. For that, we have to go to the project backup section and create a new backup of our project. Then, as the project has been saved, we can proceed with the change of the concrete.

For that, we will use a concrete where the cement is replaced by 70% of blast furnace slag. For that, all the concrete types have available on the project have been defined in the concrete mix definition table. And then, we can change the concrete mix type of all the concrete foundation components. For that, we just need to switch the concrete mix on the concrete foundation components.

As soon as the change has been done, Carbon Tracker will automatically recalculate all the carbon emission of the projects. And once this is finished, we can go on the project analysis page where we will be able to compare the two states of our project to see if the change of the concrete mix for the foundation has a positive impact on the carbon emission.

For that, in the project's analysis space, we can use the compare tool and select another state of our project to compare. And we can see that the total amount of the carbon emission has now been reduced by changing the concrete type, and that the percentage of the impacts of the foundation components have also been reduced.

On the left side of the screen, you can see the result of the current state where the concrete type has been replaced. And on the right side of the screen, you can see the previous state where the cement of the foundation concrete components have not been replaced.

So that's all for the Carbon Tracker demo. So now let's move. We've saved by BIM.

ERIC PRUVOST: OK. So let's move on to the next section. And this second part is to deal with a strategic challenge we have to master and fulfill our mission to deliver safe infrastructure.

So to do so, and to support our project team, we have developed a solution called SafebyBIM that we are now going to give you an overview.

Construction industry is a high risk industry. We all know that. But as professional entity managing construction, it is our responsibility to ensure safety is properly managed. So far, most of the effort have been done to make the construction site safer. But we still need to improve the safety by trying to eliminate safety risk at this end stage before there appears on site and requires protection works.

This is what we call Safe By Design.

Managing risk at design phase is not so obvious for two main reasons. First, the lack of maturity of our design team that focused more on operational requirements leaving the subject of safety to construction teams even though the design can influence this level of risk that the construction teams will have to deal with.

The lack of efficient tools and processes is the second difficulty. And even where the process on developed, safety risk management is often seen as an additional burden by design teams because they are not efficient, and also because they don't have the right tool to make it valuable for themselves. And also because they are more dedicated to prove that safety has been taken into account into the design.

That's the reason why we work with our safety manager in the UK to develop SafeByBIM that will have them managing the safety risk but also bring value to the design teams.

SafebyBIM has been designed to make this environment-- SafebyBIM has been designed to provide a unique source of information and environment to manage the whole lifecycle of each identified safety risk of a project from its creation to its transfer or closure. It has been designed to make this environment configurable to suit any client and project processes requirements in terms of safety risk management.

It also has been designed to provide a user-friendly interface to create these risks and connect them to their contacts in the 3D BIM model and help managing them.

Finally, it has been designed to ensure accessibility to the safety risk through a web based interface in order to guarantee good communication, efficient collaboration, and well-informed design decision. In the end, SafebyBIM should allow to implement robust safety risk management process and provide traceability and analytics of the safety risk evolution on the whole lifecycle.

This should ease the work of the safety manager but also provide reliable insight to the project and design team leaders in order to deliver SafebyDesign infrastructures.

So let's now move on to the demo of SafebyBIM. I will give back to my Lucas.

LUCAS GIBAUD: Hi again.

So before going forward with the demo, just some quick work to have a good understanding of the hazard management process and some definitions. We can sum up the hazard management process in three steps. The first step is the hazard identification where the safety manager and the discipline needs to identify the hazards of the project. The hazards can be classified in three categories, CDM hazard, CSM hazard, or both.

The second step of the hazard management process is to assess the hazard in evaluating its frequency and its impact on the project. This is very important and will help to prioritize between all the hazards of the projects.

And the last step is about the control strategy of the hazard and its follow up on the project. Depending to the complexity and the assessment of the hazard, the hazard can be avoided, transferred to third parties, mitigated, or accepted. As you can understand, due to the number of hazards that can be described on a railway project, it's very important to provide a tool that can help the teams to control and follow this process.

And finally, as a project are designed in BIM, it's quite important to ensure that the hazard management can follow the evolution of the design. For that, SafebyBIM will provide the ability to directly integrate the hazards into the BIM models.

So now, let's connect to the application. So when you connect to the application, you will find the project hub page. The project hub is where any user can find all its accessible projects. As Carbon Tracker, SafebyBIM is a web application, so you can use any internet browser to connect.

On this project hub page the user can go from one project into another using the Activate button.

All hazards of the project will be stored in the hazard database and can be reviewed going to the hazard page. As each hazard contains a lot of data, that's why its properties are split between different categories in order to facilitate its visualization. Most of these categories correspond to the hazard management process we have just discussed before. The hazard can be checked by the table as we are doing now, but also individually. For that, you just need to click on the Modify button, and you will be redirected to the hazard individual page.

On this page, you will find all the feed of the hazard. But there is also one additional information on this page, which is quite interesting. It's the audit trail. It will allow any user to check all the change that have been made on this specific hazard.

If we come back to the hazard page, we can, of course, create a hazard by clicking on the button New. If you click on this button, you will find the same page as the modification one, but this time with empty fields. If you provide all the mandatory fields, a new hazard will be created in the database. But on project, most of the hazards are identified during meetings where the safety management team and the design needs identify the new hazards.

For that, they are using Excel files. That why SafebyBIM provide a very useful functionality, which is to import Excel file containing the hazard definition in order to complete or modify the database. For that, in SafebyBIM you can export and then import the hazard from Excel.

When the hazard has been identified, they can be linked to the design using BIM models. For that, will use the forge APIs to convert BIM models and use them on the web browser. The process for operating BIM models is similar to the Carbon Tracker process. As soon as the model is ready, it will come on the left side of the screen and the user can open it in clicking on it.

As Carbon Tracker, you can easily recognize the forge viewer that you have probably used within BIM 360. So we have extended this viewer with some specific functionalities that you can see on the left side of the screen. The first action the user will want to do is to display the current hazards that are available in the model. For that, you just need to click on the first button to display the results. But you will just want to have hazard table to be able to interact and understand the hazards that have been placed on the model.

For that, you can use the second button, which will open the hazard table. If you select a row in the table, the hazard symbol in the model will be automatically highlighted, but you can also use the eye button on the first quadrant of the table, which will allow you to zoom and select the object that have been associated to the hazard.

In order to associate hazard with the BIM model you have two options. Whether you want to drop the hazard model but with no relation with BIM objects, so for that, you can use the [INAUDIBLE] button, and it would create a new tag in the model. Or you can have a second option, which is to associate the hazard with one or multiple BIM objects, which is the BIM model.

For that, you can click on the first button to initiate the process. It will allow you to associate the hazard with this mapped object. But you can also add more object in relation with hazard. For that, you can click on this button, and it will add more object in relation with the hazard.

And the last button will allow you to remove objects from the hazard if you have made a mistake during your selection.

Finally, when object has been associated to hazard, you can view them by selecting the hazard in the table. And all the related BIM objects will be selected in the viewer.

The last part of this demo is the dashboard, which will allow the user to follow the progress and to have a better understanding of the hazard management system. On top of the dashboard, you will be able to view the project timeline and to have the list of all the project backups that have been done on the project. If you select one of these project backup, you will be able to view the dashboard at this specific date.

This will allow you to understand the progress that have been made during the project. On the top left corner, you will find all the information of the project. At the center, you will have the key figures as the number of the hazard in the project or the percentage of the processed hazards.

In the top right corner, you will have a quick overview of the distribution of the hazard status. Of course, the less open status you have, the better it is. And then the rest of the dashboard will give you more detailed information about the type of hazard that you have on your project, but also this distribution score of the hazard that have been assessed during the evaluation process.

And finally, the last three graphics are the distribution of the hazard across the different discipline of the project. The distribution of the hazard for the CSM, and the CDM hazard types.

So that's all for the SafebyBIM demo. I will let Eric to conclude this class.

ERIC PRUVOST: Thank you, Lucas. I hope you enjoyed the presentation. And now we are ready to answer your question during the Q&A session. Thank you.

Downloads

______
icon-svg-close-thick

Cookie 首选项

您的隐私对我们非常重要,为您提供出色的体验是我们的责任。为了帮助自定义信息和构建应用程序,我们会收集有关您如何使用此站点的数据。

我们是否可以收集并使用您的数据?

详细了解我们使用的第三方服务以及我们的隐私声明

绝对必要 – 我们的网站正常运行并为您提供服务所必需的

通过这些 Cookie,我们可以记录您的偏好或登录信息,响应您的请求或完成购物车中物品或服务的订购。

改善您的体验 – 使我们能够为您展示与您相关的内容

通过这些 Cookie,我们可以提供增强的功能和个性化服务。可能由我们或第三方提供商进行设置,我们会利用其服务为您提供定制的信息和体验。如果您不允许使用这些 Cookie,可能会无法使用某些或全部服务。

定制您的广告 – 允许我们为您提供针对性的广告

这些 Cookie 会根据您的活动和兴趣收集有关您的数据,以便向您显示相关广告并跟踪其效果。通过收集这些数据,我们可以更有针对性地向您显示与您的兴趣相关的广告。如果您不允许使用这些 Cookie,您看到的广告将缺乏针对性。

icon-svg-close-thick

第三方服务

详细了解每个类别中我们所用的第三方服务,以及我们如何使用所收集的与您的网络活动相关的数据。

icon-svg-hide-thick

icon-svg-show-thick

绝对必要 – 我们的网站正常运行并为您提供服务所必需的

Qualtrics
我们通过 Qualtrics 借助调查或联机表单获得您的反馈。您可能会被随机选定参与某项调查,或者您可以主动向我们提供反馈。填写调查之前,我们将收集数据以更好地了解您所执行的操作。这有助于我们解决您可能遇到的问题。. Qualtrics 隐私政策
Akamai mPulse
我们通过 Akamai mPulse 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Akamai mPulse 隐私政策
Digital River
我们通过 Digital River 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Digital River 隐私政策
Dynatrace
我们通过 Dynatrace 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Dynatrace 隐私政策
Khoros
我们通过 Khoros 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Khoros 隐私政策
Launch Darkly
我们通过 Launch Darkly 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Launch Darkly 隐私政策
New Relic
我们通过 New Relic 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. New Relic 隐私政策
Salesforce Live Agent
我们通过 Salesforce Live Agent 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Salesforce Live Agent 隐私政策
Wistia
我们通过 Wistia 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Wistia 隐私政策
Tealium
我们通过 Tealium 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Tealium 隐私政策
Upsellit
我们通过 Upsellit 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Upsellit 隐私政策
CJ Affiliates
我们通过 CJ Affiliates 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. CJ Affiliates 隐私政策
Commission Factory
我们通过 Commission Factory 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Commission Factory 隐私政策
Google Analytics (Strictly Necessary)
我们通过 Google Analytics (Strictly Necessary) 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Google Analytics (Strictly Necessary) 隐私政策
Typepad Stats
我们通过 Typepad Stats 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Typepad Stats 隐私政策
Geo Targetly
我们使用 Geo Targetly 将网站访问者引导至最合适的网页并/或根据他们的位置提供量身定制的内容。 Geo Targetly 使用网站访问者的 IP 地址确定访问者设备的大致位置。 这有助于确保访问者以其(最有可能的)本地语言浏览内容。Geo Targetly 隐私政策
SpeedCurve
我们使用 SpeedCurve 来监控和衡量您的网站体验的性能,具体因素为网页加载时间以及后续元素(如图像、脚本和文本)的响应能力。SpeedCurve 隐私政策
Qualified
Qualified is the Autodesk Live Chat agent platform. This platform provides services to allow our customers to communicate in real-time with Autodesk support. We may collect unique ID for specific browser sessions during a chat. Qualified Privacy Policy

icon-svg-hide-thick

icon-svg-show-thick

改善您的体验 – 使我们能够为您展示与您相关的内容

Google Optimize
我们通过 Google Optimize 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Google Optimize 隐私政策
ClickTale
我们通过 ClickTale 更好地了解您可能会在站点的哪些方面遇到困难。我们通过会话记录来帮助了解您与站点的交互方式,包括页面上的各种元素。将隐藏可能会识别个人身份的信息,而不会收集此信息。. ClickTale 隐私政策
OneSignal
我们通过 OneSignal 在 OneSignal 提供支持的站点上投放数字广告。根据 OneSignal 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 OneSignal 收集的与您相关的数据相整合。我们利用发送给 OneSignal 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. OneSignal 隐私政策
Optimizely
我们通过 Optimizely 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Optimizely 隐私政策
Amplitude
我们通过 Amplitude 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Amplitude 隐私政策
Snowplow
我们通过 Snowplow 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Snowplow 隐私政策
UserVoice
我们通过 UserVoice 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. UserVoice 隐私政策
Clearbit
Clearbit 允许实时数据扩充,为客户提供个性化且相关的体验。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。Clearbit 隐私政策
YouTube
YouTube 是一个视频共享平台,允许用户在我们的网站上查看和共享嵌入视频。YouTube 提供关于视频性能的观看指标。 YouTube 隐私政策

icon-svg-hide-thick

icon-svg-show-thick

定制您的广告 – 允许我们为您提供针对性的广告

Adobe Analytics
我们通过 Adobe Analytics 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Adobe Analytics 隐私政策
Google Analytics (Web Analytics)
我们通过 Google Analytics (Web Analytics) 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Google Analytics (Web Analytics) 隐私政策
AdWords
我们通过 AdWords 在 AdWords 提供支持的站点上投放数字广告。根据 AdWords 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 AdWords 收集的与您相关的数据相整合。我们利用发送给 AdWords 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. AdWords 隐私政策
Marketo
我们通过 Marketo 更及时地向您发送相关电子邮件内容。为此,我们收集与以下各项相关的数据:您的网络活动,您对我们所发送电子邮件的响应。收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、电子邮件打开率、单击的链接等。我们可能会将此数据与从其他信息源收集的数据相整合,以根据高级分析处理方法向您提供改进的销售体验或客户服务体验以及更相关的内容。. Marketo 隐私政策
Doubleclick
我们通过 Doubleclick 在 Doubleclick 提供支持的站点上投放数字广告。根据 Doubleclick 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Doubleclick 收集的与您相关的数据相整合。我们利用发送给 Doubleclick 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Doubleclick 隐私政策
HubSpot
我们通过 HubSpot 更及时地向您发送相关电子邮件内容。为此,我们收集与以下各项相关的数据:您的网络活动,您对我们所发送电子邮件的响应。收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、电子邮件打开率、单击的链接等。. HubSpot 隐私政策
Twitter
我们通过 Twitter 在 Twitter 提供支持的站点上投放数字广告。根据 Twitter 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Twitter 收集的与您相关的数据相整合。我们利用发送给 Twitter 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Twitter 隐私政策
Facebook
我们通过 Facebook 在 Facebook 提供支持的站点上投放数字广告。根据 Facebook 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Facebook 收集的与您相关的数据相整合。我们利用发送给 Facebook 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Facebook 隐私政策
LinkedIn
我们通过 LinkedIn 在 LinkedIn 提供支持的站点上投放数字广告。根据 LinkedIn 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 LinkedIn 收集的与您相关的数据相整合。我们利用发送给 LinkedIn 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. LinkedIn 隐私政策
Yahoo! Japan
我们通过 Yahoo! Japan 在 Yahoo! Japan 提供支持的站点上投放数字广告。根据 Yahoo! Japan 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Yahoo! Japan 收集的与您相关的数据相整合。我们利用发送给 Yahoo! Japan 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Yahoo! Japan 隐私政策
Naver
我们通过 Naver 在 Naver 提供支持的站点上投放数字广告。根据 Naver 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Naver 收集的与您相关的数据相整合。我们利用发送给 Naver 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Naver 隐私政策
Quantcast
我们通过 Quantcast 在 Quantcast 提供支持的站点上投放数字广告。根据 Quantcast 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Quantcast 收集的与您相关的数据相整合。我们利用发送给 Quantcast 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Quantcast 隐私政策
Call Tracking
我们通过 Call Tracking 为推广活动提供专属的电话号码。从而,使您可以更快地联系我们的支持人员并帮助我们更精确地评估我们的表现。我们可能会通过提供的电话号码收集与您在站点中的活动相关的数据。. Call Tracking 隐私政策
Wunderkind
我们通过 Wunderkind 在 Wunderkind 提供支持的站点上投放数字广告。根据 Wunderkind 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Wunderkind 收集的与您相关的数据相整合。我们利用发送给 Wunderkind 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Wunderkind 隐私政策
ADC Media
我们通过 ADC Media 在 ADC Media 提供支持的站点上投放数字广告。根据 ADC Media 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 ADC Media 收集的与您相关的数据相整合。我们利用发送给 ADC Media 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. ADC Media 隐私政策
AgrantSEM
我们通过 AgrantSEM 在 AgrantSEM 提供支持的站点上投放数字广告。根据 AgrantSEM 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 AgrantSEM 收集的与您相关的数据相整合。我们利用发送给 AgrantSEM 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. AgrantSEM 隐私政策
Bidtellect
我们通过 Bidtellect 在 Bidtellect 提供支持的站点上投放数字广告。根据 Bidtellect 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Bidtellect 收集的与您相关的数据相整合。我们利用发送给 Bidtellect 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Bidtellect 隐私政策
Bing
我们通过 Bing 在 Bing 提供支持的站点上投放数字广告。根据 Bing 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Bing 收集的与您相关的数据相整合。我们利用发送给 Bing 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Bing 隐私政策
G2Crowd
我们通过 G2Crowd 在 G2Crowd 提供支持的站点上投放数字广告。根据 G2Crowd 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 G2Crowd 收集的与您相关的数据相整合。我们利用发送给 G2Crowd 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. G2Crowd 隐私政策
NMPI Display
我们通过 NMPI Display 在 NMPI Display 提供支持的站点上投放数字广告。根据 NMPI Display 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 NMPI Display 收集的与您相关的数据相整合。我们利用发送给 NMPI Display 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. NMPI Display 隐私政策
VK
我们通过 VK 在 VK 提供支持的站点上投放数字广告。根据 VK 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 VK 收集的与您相关的数据相整合。我们利用发送给 VK 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. VK 隐私政策
Adobe Target
我们通过 Adobe Target 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Adobe Target 隐私政策
Google Analytics (Advertising)
我们通过 Google Analytics (Advertising) 在 Google Analytics (Advertising) 提供支持的站点上投放数字广告。根据 Google Analytics (Advertising) 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Google Analytics (Advertising) 收集的与您相关的数据相整合。我们利用发送给 Google Analytics (Advertising) 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Google Analytics (Advertising) 隐私政策
Trendkite
我们通过 Trendkite 在 Trendkite 提供支持的站点上投放数字广告。根据 Trendkite 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Trendkite 收集的与您相关的数据相整合。我们利用发送给 Trendkite 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Trendkite 隐私政策
Hotjar
我们通过 Hotjar 在 Hotjar 提供支持的站点上投放数字广告。根据 Hotjar 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Hotjar 收集的与您相关的数据相整合。我们利用发送给 Hotjar 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Hotjar 隐私政策
6 Sense
我们通过 6 Sense 在 6 Sense 提供支持的站点上投放数字广告。根据 6 Sense 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 6 Sense 收集的与您相关的数据相整合。我们利用发送给 6 Sense 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. 6 Sense 隐私政策
Terminus
我们通过 Terminus 在 Terminus 提供支持的站点上投放数字广告。根据 Terminus 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Terminus 收集的与您相关的数据相整合。我们利用发送给 Terminus 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Terminus 隐私政策
StackAdapt
我们通过 StackAdapt 在 StackAdapt 提供支持的站点上投放数字广告。根据 StackAdapt 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 StackAdapt 收集的与您相关的数据相整合。我们利用发送给 StackAdapt 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. StackAdapt 隐私政策
The Trade Desk
我们通过 The Trade Desk 在 The Trade Desk 提供支持的站点上投放数字广告。根据 The Trade Desk 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 The Trade Desk 收集的与您相关的数据相整合。我们利用发送给 The Trade Desk 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. The Trade Desk 隐私政策
RollWorks
We use RollWorks to deploy digital advertising on sites supported by RollWorks. Ads are based on both RollWorks data and behavioral data that we collect while you’re on our sites. The data we collect may include pages you’ve visited, trials you’ve initiated, videos you’ve played, purchases you’ve made, and your IP address or device ID. This information may be combined with data that RollWorks has collected from you. We use the data that we provide to RollWorks to better customize your digital advertising experience and present you with more relevant ads. RollWorks Privacy Policy

是否确定要简化联机体验?

我们希望您能够从我们这里获得良好体验。对于上一屏幕中的类别,如果选择“是”,我们将收集并使用您的数据以自定义您的体验并为您构建更好的应用程序。您可以访问我们的“隐私声明”,根据需要更改您的设置。

个性化您的体验,选择由您来做。

我们重视隐私权。我们收集的数据可以帮助我们了解您对我们产品的使用情况、您可能感兴趣的信息以及我们可以在哪些方面做出改善以使您与 Autodesk 的沟通更为顺畅。

我们是否可以收集并使用您的数据,从而为您打造个性化的体验?

通过管理您在此站点的隐私设置来了解个性化体验的好处,或访问我们的隐私声明详细了解您的可用选项。