AU Class
AU Class
class - AU

Life After Design: Purchases, Supplies, and Cost Control in Execution

共享此课程
在视频、演示文稿幻灯片和讲义中搜索关键字:

说明

Intelligent models have reached a level of maturity in the design, cost estimation, and planning stage. Now what? It’s in the execution that we will recover the previous effort—taking advantage of all the model’s information to calculate the purchases of materials and the needs of our own resources, generate the contracts, and manage the orders, deliveries, and invoices. We'll see this process as it’s being applied in a real building, starting from a Revit model already made by the design team. La clase también será en español (the class will also be in Spanish).

主要学习内容

  • Discover the level of information needed at each step of the process to meet the requirements of the next agent
  • Learn how to create collaborative workflows focused on the "last builder”
  • Learn how to communicate with each other about the different digital resources involved
  • Learn how to establish the characteristics of a common data environment according to ISO 19650 as is practical and appropriate to the project size

讲师

Video Player is loading.
Current Time 0:00
Duration 0:00
Loaded: 0%
Stream Type LIVE
Remaining Time 0:00
 
1x
  • Chapters
  • descriptions off, selected
  • subtitles off, selected
      Transcript

      [MUSIC PLAYING]

      CAROLINA RAMIREZ: I am Carolina Ramirez. I am an architect and I work in the fun part of BIM, modeling.

      FERNANDO VALDERRAMA: I am Fernando Valderrama. I am architect and I work in the boring part being of BIM. Cost and time planning.

      CAROLINA RAMIREZ: But both are important.

      FERNANDO VALDERRAMA: But both sides are important.

      [MUSIC PLAYING]

      BIM models and professionals have reached a level of maturity in the design, cost estimation and planning stages. Everything that goes with our construction. But it's in the execution stage where we're supposed to recover all the effort we have made before.

      Taking advantage of the large amount of information that is in the model, as we're going to see today, to calculate the material choices based on the planning and the resources quantities. We will generate the required contracts and documents, such as orders, deliveries and invoices.

      Let's see all of this in a real building that has been executed with Carolina's help. The first thing we would like, Carolina, is for you to describe what the building is like.

      CAROLINA RAMIREZ: The project is Retamo Parc, a residential building promoted and built by Rivadeneira Barriga architects in Quito, Ecuador. It's a big residential building in two stage. This is the second stage, which is made up of four buildings, building C, building F, D and G.

      NICOLAS RIBADENEIRA: [NON-ENGLISH SPEECH]

      CAROLINA RAMIREZ: The project was modeled to manage construction, to measure, estimate, plan their entire work. And also to create the orders. For example, the orders of concrete.

      The first thing we do when we receive a model is to audit it and study it in order to know it.

      FERNANDO VALDERRAMA: Who are the agents involved in the project? That is to use the [INAUDIBLE] CS50 terminology. Who is the appointing party and who is the appointed party?

      CAROLINA RAMIREZ: The contracting party was Rivadeneira Barriga, who they cited as they are the developer and the construction company to model in BIM to be able to plan all the orders. And we take care of even them, all the measurements and the construction management for the work.

      FERNANDO VALDERRAMA: Tell us what you do when auditing the model. And especially what problems you usually identify. What process you perform to audit it and what usually appears.

      CAROLINA RAMIREZ: We start by studying the model. First, you have to know which families and which categories are modeled. And check that every element is in the proper category. Check also that they have the right types.

      For example, here what happened was that we had toilet in all the houses and also in the rooms of the [? football ?] [? field. ?] It was decided that they were of different types, different elements to [? write. ?] Then I change the type in Revit.

      We also began to study separation where each of the buildings are separate to make different groups with them. Then what we did was to study that the levels were correct and the minimum needed for the model. Another thing, with it was all the elements were at the level to which they correspond.

      FERNANDO VALDERRAMA: Have you followed any special rules of good practice documents or do you recommend any of them that could be used to do this type of review?

      CAROLINA RAMIREZ: We can use the [? uBIM ?] standard. What they recommend us in terms of design, BIM model levels, special tips, improvements to implement in your models.

      FERNANDO VALDERRAMA: In the special BIM recommendations of your BIM, I see that there are many standards to work with the spaces and levels. What else could you say about the levels as you receive the model?

      CAROLINA RAMIREZ: This model as was the continuation of phase two. There were levels that were left by mistake. Also, those levels that belong to phase one had elements in them.

      So if we delete those levels, also elements of our project would we delete. What did we do? We export all the information for the model to PRESTO, as a list. And we also took out the information from the levels in PRESTO.

      We compared to list first, what are the levels that were left over. And second, we could select everything that was modeled in the work levels to move it to their corresponding level.

      FERNANDO VALDERRAMA: Another issue that always arises with models is the use of parameters. Many times, there are too many parameters and they are not always filled correctly or are empty or incompatible. How did you do the parameter radio and what problems do you usually identify?

      CAROLINA RAMIREZ: Many times, the amount of extra parameters and the number of parameters that we are creating because maybe we don't know-- trust that the all parameters is fine. And we create another one. It can become the chaos and suddenly, we have parameters that are not working and that are not of date automatically.

      The rule of is to use the model to save data that we can calculate natively, such as surveys or [INAUDIBLE]. And that we don't depend on parameters that we will have to fill ourselves by hand. For example, you cannot put the parameter in where it is to share, because you move it, and its parameters become obsolete.

      So what we decided was to eliminate the number of extra parameters. And there were on leave only the areas. Asset also for calculating the buildings with faces. And to group them by dwellings and use groups to divide buildings. And use native parameters and the levels for the [? empty ?] zoning of the project.

      That's it. Use the least possible parameters and that they properties can be calculate at the time they are needed. Therefore, it's not necessary to save them because then they will not be obsolete. The only parameter that I do like to leave in the models is the one that group the views.

      I find them necessary, especially to have those packages that we need to group those work views or those publication views.

      FERNANDO VALDERRAMA: You said that you use groups to divide buildings. How did you get those groups? And why have they chosen precisely to make groups?

      CAROLINA RAMIREZ: We group the elements of each building into Revit groups. Why? Because that's how we differentiate them. Even if we don't have several copies of a group, it serves us to select to separate and so on. In addition, if we have that group within our model, we can take it out to PRESTO and be able to have that list separate by buildings.

      If we are not allowed to modify the model, we are auditing what we can do in PRESTO. Easily fill in that field, select it from Revit. The group is transferred to take off-line file of the element. So I can have quantitative cost estimate and our planning [INAUDIBLE] by buildings.

      FERNANDO VALDERRAMA: Let's go with the [? AES. ?] What did you use [? AES ?] for? Give us an example of the [? AES ?] you have created and what did you use, please.

      CAROLINA RAMIREZ: Oh, yes. Our subdivision of a building element and we build [INAUDIBLE] our lines or selecting models, elements to use as our lines. We can calculate, for example, the gross building surface, which in all projects must be calculated.

      As we already have to create it to calculate the gross [INAUDIBLE] face, we can use it to calculate, for example, the information of each element. PRESTO locates the area and adds a field in the takeoff line of those elements in which area they are located. So I can also have quantitative cost estimate and a planning [INAUDIBLE] by areas.

      FERNANDO VALDERRAMA: Why don't the use the department field of the zones to identify the houses?

      CAROLINA RAMIREZ: Because I will have to be aware the department file of each room is filled correctly throughout the project. And in this case, we decided to do it directly by the areas.

      FERNANDO VALDERRAMA: We have seen the taking of a special BIM levels and parameters. What are the elements that were modeled in this project? And what will you do about types and categories?

      CAROLINA RAMIREZ: For that, what we did is directly export the list of modeled elements for the Revit to PRESTO to be able to manage it. We are going to Cost-it it to export. And here, we have all the categories of our model.

      For example, the structural area in the basement, which does not belong to us. At this stage, they are already build it. We are going to extract the floors and the walls. They are important because they have the concrete.

      The windows, the doors, the stairs, the railings. So we are able to make the orders. The plumbing fixtures to check what they are, how they are and how many there are. And also the equipment.

      FERNANDO VALDERRAMA: Then they model more elements?

      CAROLINA RAMIREZ: No, only the elements necessary to manage the most expensive parts of their work and those that had to be built.

      FERNANDO VALDERRAMA: What information can you use as a result of this spot and this type and category check?

      CAROLINA RAMIREZ: This list can be used for many things. For example, to check all categories, families and types. We have all the floor listed by all the types that are in the project with the corresponding quantities and all the elements that are in it. We have the windows, the whole list of windows with their level.

      The area, the room and all the dimensions in case, we want the information of how much each windows measures. We have the list of all the doors and also of their location. We have the ceilings, the stairs, the railings.

      The railing list it was very useful because they all belong to the same type in Revit. But we need to quantitative [INAUDIBLE] and a straight railings to order to the workshop. What we did was break down the type elements by link to get the information and how many railings there were of each.

      The plumbing features, as I told before, we knew how many types of toilets, showers and sinks were in the project. And the equipment and furniture, as the kitchens and the cabinets.

      FERNANDO VALDERRAMA: Well, I see that you left the walls for the end, because it's surely the most important element of all this work. Tell us what the goals are like and what is so special about them.

      CAROLINA RAMIREZ: The objective of the work was get to the entire concrete list of each of the houses to be able to plan it and estimate where the list can be complete by putting a price on the elements. In the other hand, our planning where the list can be done by putting a face to each of the elements. We have the walls and it is the concrete that we are going to plan in phases.

      This project is built with the metallic construction system where they fill all the elements with concrete and nail them into a single monolithic package. On the first day, they put the meshes, they elected wiring, their pipes for drinking water and sanitation. On the second day, the metal frame work is put on.

      The third day, they do two monolithic concrete of the walls and floors. On the fourth day, transfer the framework to the next house. Each phase covers approximately two dwellings at the same time. Also, they have to work teams on the site and that are overlapped.

      [MUSIC PLAYING]

      FERNANDO VALDERRAMA: How are the faces organized? That is, how long are they and who are signs the specific elements to be done in each phase?

      CAROLINA RAMIREZ: Each phase begins every three days. Then we must identify the elements that belong to each of the phases. We go to the concrete work unit. And as you can see, we have an area parameter that locates the element. Where is it?

      The area parameter comes from the Revit areas. And in this case, for example, it is the B121 that belong to a specific floor. The elements of each floor are already locates. It's decided that two houses go for the phase. Then it is decided, for example, that house B105 and house B106 go to the phase one. House 104 and 107 go to the phase two.

      As you already know, it is filtered here in this list of measurements where we have all the elements of the model. And it is set to phase two. In addition, as there are elements that don't belong to any area, to any specific house, they will there decides to which of their phases to [? assign ?] those elements.

      They are for example, the walls that separate each houses or the walls that separate the common part of the two houses.

      FERNANDO VALDERRAMA: Can we visually check in Revit the planning on the fly as it is being done?

      CAROLINA RAMIREZ: Of course. Here, I have a list of dates. Every three days. If you look at it, we only have Mondays and Thursdays at the beginning of the phase. I can simply right click all the elements that belong to the phase to see them.

      Also, since I have the information in PRESTO, I can view it in Revit. We remember that I don't have and don't need any extra parameters in Revit. Everything can be managed and organize it directly in PRESTO.

      Let's go now to processes. Model animation and tell it to color the elements by the planning phase. We have phase 1 to phase 51. We accept and we can see visually, which is more intuitive, all the concrete planning in this project.

      FERNANDO VALDERRAMA: Can we keep it done in the view where the animation is visualized?

      CAROLINA RAMIREZ: Sure. We can move it. We can turn it, especially to see these [? hiding ?] parts in a very large project.

      FERNANDO VALDERRAMA: Do you think that during these checks, the construction company discover problems or new ways to optimize their process they have planned?

      CAROLINA RAMIREZ: Yes, it helped him to plan and to know which walls were built in each phase. The most important thing, which was what they asked me at first, was to know how much concrete that had to order every day. And to be sure that it would come the day. And also to know how much concrete they had to pay to their subcontractors.

      I select phase one in PRESTO and select the elements that are planned in this phase in Revit. We select it in the view. You can see in the work photo, the walls and floors already concrete and that they are forming the next phase.

      We select phase one and two and select the elements of the phase and can be see concrete in the photo. We reestablish the select elements and select the process from one to six. Select the elements and see the work photo, the houses are already concrete.

      We select process and we select the planned elements in phases, you can see what has been built. In this video, you can see how the last floor of building C. He's begin finish it.

      And here, in the next one, how it continues with building F. Controlling and managing the work with the model.

      FERNANDO VALDERRAMA: How are the concrete quantities of every phase calculated?

      CAROLINA RAMIREZ: We can see in this main window [INAUDIBLE] the list of all the phases that we have in our project. There are 50, as we have in the planning how much money we need for the concrete in each phase. Because the only thing that is in phases is in this project for now is the concrete.

      To calculate the resources, we are going to open the Main Resource windows and we are also going to go to three because we want this concrete in a given chapter of contracts and orders. Then we select them and we go to Processes to calculate the resources required to carry out the work of this concrete item.

      For these, we chose the first higher level concept of destiny type. So it will be a reserve of the walls contract. The result in the Main Results window is that we have all 50 phases listed as order with their phase, summary, quantity and measurement unit.

      FERNANDO VALDERRAMA: I see this information is very useful, especially internally, to know what we have to ask for every three days, in this case. Can we combine this information into official documents that serve us for contracts and for purchase orders?

      CAROLINA RAMIREZ: Of course. Now, we are going to select all these orders and concrete resources. And we are going to generate those contracts with Create Contract. In the window, we select that we do not want a contact per phase, we want a contract of all the concrete.

      Suppliers are going to be paid weekly. But we make a contract for everything. Now, we go to the Main Contract window and see that out contract is already created. We have to assign into the supplier.

      In this case, we only have one provided, which is the usual one. And therefore, we are going to generate it in the Entities window. Here, we have as entities the designer and the promoter. And we are going to enter the concrete supplier.

      Now, in the contract, we assign it with right-click, search and associate suppliers. We click and accept. Now, we have to put the price of the supplier. When we prepare the project, they gave the concrete at one price. But after six months, my supplier give me that contract.

      For example, at another price for the discounts, these generate all their properties and that I need in the contract. In this case, the supplier, it is the same as always. So I award him that work. If I had more providers, then I will create more and I have to decide among them.

      FERNANDO VALDERRAMA: , Now how can we proceed?

      CAROLINA RAMIREZ: Well, we have to order that concrete. We select it with right-click and move to the order. We go to the Order window. And so I can make sure that by this date, this concrete must have arrived. I can record the invoice signatures and all documents associated with the supplies of this concrete.

      On this date and this amount, I can associate the invoice, the order and put all the necessary information to have a record of all the elements.

      NICOLAS RIBADENEIRA: [NON-ENGLISH SPEECH]

      FERNANDO VALDERRAMA: We hope you like this real case, where natural and ECA workflow helps to achieve all their goals of this very complex project. Carolina, what else would you say to our users?

      CAROLINA RAMIREZ: I recommend making a simple model so you can take advantage of the information as much as possible. Thank you for listening.

      FERNANDO VALDERRAMA: Bye.

      CAROLINA RAMIREZ: Bye.

      [MUSIC PLAYING]

      Downloads

      ______
      icon-svg-close-thick

      Cookie 首选项

      您的隐私对我们非常重要,为您提供出色的体验是我们的责任。为了帮助自定义信息和构建应用程序,我们会收集有关您如何使用此站点的数据。

      我们是否可以收集并使用您的数据?

      详细了解我们使用的第三方服务以及我们的隐私声明

      绝对必要 – 我们的网站正常运行并为您提供服务所必需的

      通过这些 Cookie,我们可以记录您的偏好或登录信息,响应您的请求或完成购物车中物品或服务的订购。

      改善您的体验 – 使我们能够为您展示与您相关的内容

      通过这些 Cookie,我们可以提供增强的功能和个性化服务。可能由我们或第三方提供商进行设置,我们会利用其服务为您提供定制的信息和体验。如果您不允许使用这些 Cookie,可能会无法使用某些或全部服务。

      定制您的广告 – 允许我们为您提供针对性的广告

      这些 Cookie 会根据您的活动和兴趣收集有关您的数据,以便向您显示相关广告并跟踪其效果。通过收集这些数据,我们可以更有针对性地向您显示与您的兴趣相关的广告。如果您不允许使用这些 Cookie,您看到的广告将缺乏针对性。

      icon-svg-close-thick

      第三方服务

      详细了解每个类别中我们所用的第三方服务,以及我们如何使用所收集的与您的网络活动相关的数据。

      icon-svg-hide-thick

      icon-svg-show-thick

      绝对必要 – 我们的网站正常运行并为您提供服务所必需的

      Qualtrics
      我们通过 Qualtrics 借助调查或联机表单获得您的反馈。您可能会被随机选定参与某项调查,或者您可以主动向我们提供反馈。填写调查之前,我们将收集数据以更好地了解您所执行的操作。这有助于我们解决您可能遇到的问题。. Qualtrics 隐私政策
      Akamai mPulse
      我们通过 Akamai mPulse 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Akamai mPulse 隐私政策
      Digital River
      我们通过 Digital River 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Digital River 隐私政策
      Dynatrace
      我们通过 Dynatrace 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Dynatrace 隐私政策
      Khoros
      我们通过 Khoros 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Khoros 隐私政策
      Launch Darkly
      我们通过 Launch Darkly 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Launch Darkly 隐私政策
      New Relic
      我们通过 New Relic 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. New Relic 隐私政策
      Salesforce Live Agent
      我们通过 Salesforce Live Agent 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Salesforce Live Agent 隐私政策
      Wistia
      我们通过 Wistia 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Wistia 隐私政策
      Tealium
      我们通过 Tealium 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Tealium 隐私政策
      Upsellit
      我们通过 Upsellit 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Upsellit 隐私政策
      CJ Affiliates
      我们通过 CJ Affiliates 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. CJ Affiliates 隐私政策
      Commission Factory
      我们通过 Commission Factory 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Commission Factory 隐私政策
      Google Analytics (Strictly Necessary)
      我们通过 Google Analytics (Strictly Necessary) 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Google Analytics (Strictly Necessary) 隐私政策
      Typepad Stats
      我们通过 Typepad Stats 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Typepad Stats 隐私政策
      Geo Targetly
      我们使用 Geo Targetly 将网站访问者引导至最合适的网页并/或根据他们的位置提供量身定制的内容。 Geo Targetly 使用网站访问者的 IP 地址确定访问者设备的大致位置。 这有助于确保访问者以其(最有可能的)本地语言浏览内容。Geo Targetly 隐私政策
      SpeedCurve
      我们使用 SpeedCurve 来监控和衡量您的网站体验的性能,具体因素为网页加载时间以及后续元素(如图像、脚本和文本)的响应能力。SpeedCurve 隐私政策
      Qualified
      Qualified is the Autodesk Live Chat agent platform. This platform provides services to allow our customers to communicate in real-time with Autodesk support. We may collect unique ID for specific browser sessions during a chat. Qualified Privacy Policy

      icon-svg-hide-thick

      icon-svg-show-thick

      改善您的体验 – 使我们能够为您展示与您相关的内容

      Google Optimize
      我们通过 Google Optimize 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Google Optimize 隐私政策
      ClickTale
      我们通过 ClickTale 更好地了解您可能会在站点的哪些方面遇到困难。我们通过会话记录来帮助了解您与站点的交互方式,包括页面上的各种元素。将隐藏可能会识别个人身份的信息,而不会收集此信息。. ClickTale 隐私政策
      OneSignal
      我们通过 OneSignal 在 OneSignal 提供支持的站点上投放数字广告。根据 OneSignal 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 OneSignal 收集的与您相关的数据相整合。我们利用发送给 OneSignal 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. OneSignal 隐私政策
      Optimizely
      我们通过 Optimizely 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Optimizely 隐私政策
      Amplitude
      我们通过 Amplitude 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Amplitude 隐私政策
      Snowplow
      我们通过 Snowplow 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Snowplow 隐私政策
      UserVoice
      我们通过 UserVoice 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. UserVoice 隐私政策
      Clearbit
      Clearbit 允许实时数据扩充,为客户提供个性化且相关的体验。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。Clearbit 隐私政策
      YouTube
      YouTube 是一个视频共享平台,允许用户在我们的网站上查看和共享嵌入视频。YouTube 提供关于视频性能的观看指标。 YouTube 隐私政策

      icon-svg-hide-thick

      icon-svg-show-thick

      定制您的广告 – 允许我们为您提供针对性的广告

      Adobe Analytics
      我们通过 Adobe Analytics 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Adobe Analytics 隐私政策
      Google Analytics (Web Analytics)
      我们通过 Google Analytics (Web Analytics) 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Google Analytics (Web Analytics) 隐私政策
      AdWords
      我们通过 AdWords 在 AdWords 提供支持的站点上投放数字广告。根据 AdWords 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 AdWords 收集的与您相关的数据相整合。我们利用发送给 AdWords 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. AdWords 隐私政策
      Marketo
      我们通过 Marketo 更及时地向您发送相关电子邮件内容。为此,我们收集与以下各项相关的数据:您的网络活动,您对我们所发送电子邮件的响应。收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、电子邮件打开率、单击的链接等。我们可能会将此数据与从其他信息源收集的数据相整合,以根据高级分析处理方法向您提供改进的销售体验或客户服务体验以及更相关的内容。. Marketo 隐私政策
      Doubleclick
      我们通过 Doubleclick 在 Doubleclick 提供支持的站点上投放数字广告。根据 Doubleclick 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Doubleclick 收集的与您相关的数据相整合。我们利用发送给 Doubleclick 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Doubleclick 隐私政策
      HubSpot
      我们通过 HubSpot 更及时地向您发送相关电子邮件内容。为此,我们收集与以下各项相关的数据:您的网络活动,您对我们所发送电子邮件的响应。收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、电子邮件打开率、单击的链接等。. HubSpot 隐私政策
      Twitter
      我们通过 Twitter 在 Twitter 提供支持的站点上投放数字广告。根据 Twitter 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Twitter 收集的与您相关的数据相整合。我们利用发送给 Twitter 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Twitter 隐私政策
      Facebook
      我们通过 Facebook 在 Facebook 提供支持的站点上投放数字广告。根据 Facebook 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Facebook 收集的与您相关的数据相整合。我们利用发送给 Facebook 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Facebook 隐私政策
      LinkedIn
      我们通过 LinkedIn 在 LinkedIn 提供支持的站点上投放数字广告。根据 LinkedIn 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 LinkedIn 收集的与您相关的数据相整合。我们利用发送给 LinkedIn 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. LinkedIn 隐私政策
      Yahoo! Japan
      我们通过 Yahoo! Japan 在 Yahoo! Japan 提供支持的站点上投放数字广告。根据 Yahoo! Japan 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Yahoo! Japan 收集的与您相关的数据相整合。我们利用发送给 Yahoo! Japan 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Yahoo! Japan 隐私政策
      Naver
      我们通过 Naver 在 Naver 提供支持的站点上投放数字广告。根据 Naver 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Naver 收集的与您相关的数据相整合。我们利用发送给 Naver 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Naver 隐私政策
      Quantcast
      我们通过 Quantcast 在 Quantcast 提供支持的站点上投放数字广告。根据 Quantcast 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Quantcast 收集的与您相关的数据相整合。我们利用发送给 Quantcast 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Quantcast 隐私政策
      Call Tracking
      我们通过 Call Tracking 为推广活动提供专属的电话号码。从而,使您可以更快地联系我们的支持人员并帮助我们更精确地评估我们的表现。我们可能会通过提供的电话号码收集与您在站点中的活动相关的数据。. Call Tracking 隐私政策
      Wunderkind
      我们通过 Wunderkind 在 Wunderkind 提供支持的站点上投放数字广告。根据 Wunderkind 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Wunderkind 收集的与您相关的数据相整合。我们利用发送给 Wunderkind 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Wunderkind 隐私政策
      ADC Media
      我们通过 ADC Media 在 ADC Media 提供支持的站点上投放数字广告。根据 ADC Media 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 ADC Media 收集的与您相关的数据相整合。我们利用发送给 ADC Media 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. ADC Media 隐私政策
      AgrantSEM
      我们通过 AgrantSEM 在 AgrantSEM 提供支持的站点上投放数字广告。根据 AgrantSEM 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 AgrantSEM 收集的与您相关的数据相整合。我们利用发送给 AgrantSEM 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. AgrantSEM 隐私政策
      Bidtellect
      我们通过 Bidtellect 在 Bidtellect 提供支持的站点上投放数字广告。根据 Bidtellect 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Bidtellect 收集的与您相关的数据相整合。我们利用发送给 Bidtellect 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Bidtellect 隐私政策
      Bing
      我们通过 Bing 在 Bing 提供支持的站点上投放数字广告。根据 Bing 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Bing 收集的与您相关的数据相整合。我们利用发送给 Bing 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Bing 隐私政策
      G2Crowd
      我们通过 G2Crowd 在 G2Crowd 提供支持的站点上投放数字广告。根据 G2Crowd 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 G2Crowd 收集的与您相关的数据相整合。我们利用发送给 G2Crowd 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. G2Crowd 隐私政策
      NMPI Display
      我们通过 NMPI Display 在 NMPI Display 提供支持的站点上投放数字广告。根据 NMPI Display 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 NMPI Display 收集的与您相关的数据相整合。我们利用发送给 NMPI Display 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. NMPI Display 隐私政策
      VK
      我们通过 VK 在 VK 提供支持的站点上投放数字广告。根据 VK 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 VK 收集的与您相关的数据相整合。我们利用发送给 VK 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. VK 隐私政策
      Adobe Target
      我们通过 Adobe Target 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Adobe Target 隐私政策
      Google Analytics (Advertising)
      我们通过 Google Analytics (Advertising) 在 Google Analytics (Advertising) 提供支持的站点上投放数字广告。根据 Google Analytics (Advertising) 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Google Analytics (Advertising) 收集的与您相关的数据相整合。我们利用发送给 Google Analytics (Advertising) 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Google Analytics (Advertising) 隐私政策
      Trendkite
      我们通过 Trendkite 在 Trendkite 提供支持的站点上投放数字广告。根据 Trendkite 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Trendkite 收集的与您相关的数据相整合。我们利用发送给 Trendkite 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Trendkite 隐私政策
      Hotjar
      我们通过 Hotjar 在 Hotjar 提供支持的站点上投放数字广告。根据 Hotjar 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Hotjar 收集的与您相关的数据相整合。我们利用发送给 Hotjar 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Hotjar 隐私政策
      6 Sense
      我们通过 6 Sense 在 6 Sense 提供支持的站点上投放数字广告。根据 6 Sense 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 6 Sense 收集的与您相关的数据相整合。我们利用发送给 6 Sense 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. 6 Sense 隐私政策
      Terminus
      我们通过 Terminus 在 Terminus 提供支持的站点上投放数字广告。根据 Terminus 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Terminus 收集的与您相关的数据相整合。我们利用发送给 Terminus 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Terminus 隐私政策
      StackAdapt
      我们通过 StackAdapt 在 StackAdapt 提供支持的站点上投放数字广告。根据 StackAdapt 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 StackAdapt 收集的与您相关的数据相整合。我们利用发送给 StackAdapt 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. StackAdapt 隐私政策
      The Trade Desk
      我们通过 The Trade Desk 在 The Trade Desk 提供支持的站点上投放数字广告。根据 The Trade Desk 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 The Trade Desk 收集的与您相关的数据相整合。我们利用发送给 The Trade Desk 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. The Trade Desk 隐私政策
      RollWorks
      We use RollWorks to deploy digital advertising on sites supported by RollWorks. Ads are based on both RollWorks data and behavioral data that we collect while you’re on our sites. The data we collect may include pages you’ve visited, trials you’ve initiated, videos you’ve played, purchases you’ve made, and your IP address or device ID. This information may be combined with data that RollWorks has collected from you. We use the data that we provide to RollWorks to better customize your digital advertising experience and present you with more relevant ads. RollWorks Privacy Policy

      是否确定要简化联机体验?

      我们希望您能够从我们这里获得良好体验。对于上一屏幕中的类别,如果选择“是”,我们将收集并使用您的数据以自定义您的体验并为您构建更好的应用程序。您可以访问我们的“隐私声明”,根据需要更改您的设置。

      个性化您的体验,选择由您来做。

      我们重视隐私权。我们收集的数据可以帮助我们了解您对我们产品的使用情况、您可能感兴趣的信息以及我们可以在哪些方面做出改善以使您与 Autodesk 的沟通更为顺畅。

      我们是否可以收集并使用您的数据,从而为您打造个性化的体验?

      通过管理您在此站点的隐私设置来了解个性化体验的好处,或访问我们的隐私声明详细了解您的可用选项。