AU Class
AU Class
class - AU

Revit Solutions for Electrical Contractors: How GTP Addressed our Biggest Headaches

共享此课程
在视频、演示文稿幻灯片和讲义中搜索关键字:

说明

This session will be an overview of current Revit software workflows for electrical contractors, the difficulties they present, and how the GTP electrical add-in solves them. Learn how to automate conduit scheduling and data management within Revit software to solve some of the biggest scheduling problems. See how information from estimators and engineers can be used to drive project standards. Find out about ways that the field can provide information for modeling staff, see information from the model, and ensure that the model includes changes and information requested. This session features Revit and Navisworks Manage. AIA Approved

主要学习内容

  • Understand how some out-of-the-box solutions don’t work for electrical contractors
  • See the solutions being developed by GTP Services
  • Explore the benefits and identify opportunities to provide value to the Construction Team
  • See how a contractor is currently using the application to improve workflows

讲师

  • knOP6PbMCMy7ziHR ogu0HlPy0EC2LNDn
    Jared Regan is a graduate of Arizona State University from the Sustainable Energy, Materials, and Technology program and Barrett, The Honors College. Regan worked with content development, prefabrication workflows, and Building Information Modeling (BIM) software automation at a major electrical contractor for several years before moving on to join GTP Services developing solutions for electrical contractors, emphasizing engagement with job-site stakeholders and interoperability between applications, and increasing data without increasing labor.
  • Dan Wilson
    I am a Journeyman Electrician with over 25 years in the trade and have been working as a detailer/coordinator for over 7 years now using primarily Autodesk Revit and Navisworks Manage. I also have a passion for process improvement and have completed Six Sigma training through Villanova University. I strongly believe that construction is in the midst of the biggest change in recent history due to technology advancements. My goal is to help Valley Electric make the transition from “how we’ve always done things” to a new leaner and more efficient way using BIM processes and technologies.
Video Player is loading.
Current Time 0:00
Duration 0:00
Loaded: 0%
Stream Type LIVE
Remaining Time 0:00
 
1x
  • Chapters
  • descriptions off, selected
  • subtitles off, selected
      Transcript

      JARED REGAN: It's 1 o'clock now, and we're ready to get started here. My name is Jared Regan. I work with GTP Services, and we are a software developer. We work with DeWalt tools, Greenlee. My background is in doing electrical BIM work with Rosendin Electric out in Phoenix, Arizona, where I did a lot of family development, automation, prefab workflows. So I cut my teeth out there for a good number of years before coming over to GTP. I worked in Revit for several years, and I saw that there was a lot lacking on the offering as it came to the electrical contractor. And since then, we've started development on this project. And I have Dan Wilson with me here from Valley Electric.

      DAN WILSON: Hi, my name's Dan Wilson, and as Jared said, I'm with Valley Electric in Everett, Washington. A little bit of my history. I'm a 25-year electrician and electrical construction, and I've been using Revit for about eight years now in a virtual construction department.

      I've worked with Jared, I don't know, several years ago at Rosendin for a while, before I moved to the Pacific Northwest. So I'll hand this back over to Jared, and you're going to--

      JARED REGAN: We'll get this rolling.

      DAN WILSON: --take us for a ride.

      JARED REGAN: So we've got the class summary. Same class summary that was used on the AU site. At the end of this, we're hoping to identify some of the holes inside of Revit as it pertains to electrical subcontractors. Integrating feeder schedules into Revit projects and the value that can bring, as well as how we can minimize data entry, and utilize model information to improve construction workflows.

      And so when we look at the electrical construction market, it's unique from the mechanical market in that it has a lot of components that aren't necessarily modeled all the time. The wires specifically is a big part of that. The straps on the unit strut, all the parts and pieces that go into it. A lot of times, it's a lot more generic, and a lot of that is handled by the field. You'll see a very high volume of material used on the installation side, as well as an unfortunate co-ordination priority.

      Most of my experience has been with the mechanical, with running the coordination meetings and the general philosophy of smaller items move out first. We also see mechanical and plumbing getting early starts, being able to start their prefabrication earlier and lock their parts and pieces in, which has been an unfortunate way of going about it. So we looked at how we can improve the workflows and try to make it a little more intuitive inside the software to hopefully be able to create the information to really be able to stand up in the coordination meetings and identify where you can protect your company's interests.

      And so the first thing is that this is all based in Revit. And just on a show of hands, who all in here is currently using Revit? That's really good then.

      DAN WILSON: Awesome.

      JARED REGAN: So everyone's probably familiar with some of the problems we'll look at. But they're both drawing tools. There's no one that says you can't do BIM work on AutoCAD, but it has that database associated with it. And that's where we see a lot of the information in BIM being utilized, and the customizable nature of it makes it very flexible, gives you a lot of avenues to figure out how you can innovate and improve your own workflows to better compete in the market.

      And so as we work with parameters, I've got a set of custom parameters that I've loaded in here. And so I'm sure everyone's familiar with the joys of if we pump the information in here, and we have to start going through the coordination process as we start changing fittings, deleting things, adding offsets, adding added content, that information is consistently lost. So if I were to delete that fitting right there, it's got all the information in it. If I trim and replace that fitting now, we're going to see that lost the information.

      So during the coordination process, you've got these parameters, you want to be able to utilize them, but there's a burden of data maintenance that goes along with it. So it backslides on the value that Excel database or the back-end database that Revit offers to really bring itself above the standard AutoCAD offering. And the same thing will happen if we do that main, just a minor adjustment. We didn't even delete anything, and it still recognizes a new instance. It's a piping software. It assumes that different instances won't share those parameters.

      And so we've had a number of problems just having to retype that information. And the more you retype it, the more you're exposed to typographical errors. It's redundant work. And everybody loves the data entry portion of the job. That's everyone's favorite. That's how we like to spend our time. No, we want to keep moving.

      And we also have this similar issue inside of Revit, where if we create the feeder schedule or if we created a conduit run schedule-- let's see if this pushes up. I might have put the wrong image on here. But we have the issue of trying to get a hold of the actual information with the overall conduit run length. The parameters don't want to talk to the current run schedule. Most people use the comments parameter, which was the workflow that you were working on. And what we see is that it has the same issues. If the comments are consistent throughout all the parts and pieces, then it will talk to the conduit run schedule. If it's not, then you find yourself having to maintain it. So you have this break between access to information and trying to cut the time between how much am I going to spend inputting information, versus how much do I want to have access to the live information.

      And that's where WireWorks came into play. It was initially just a simple solution for being able to push information to the conduit run schedule. So over here is the conduit run schedule. I've got it loaded up, and if I start putting information into the parameters, we're not going to see it populate up. I've also only got one conduit selected. So once the information is loaded in there, we won't see it on the far end. We do have the ability to click the conduit run cleanup button up here, and it QAs the entire project and ensures that information is consistent throughout all the parts and pieces, as well as pushes that information up to the conduit run schedule.

      So now if you're associating things like wire, if you're looking at from-to information, you can start pulling that information down and using it for material takeoffs, for if you wanted to assume ads on the other end, you can start looking at circuit drop, things like that. But it's the best way to get access to this overall run length, which is the valuable parameter. But again, it's inhibited by the fact that information doesn't want to flow from the parts and pieces up to the run schedule.

      And so we can also set this whole application to run automatically. And so if I started drawing from here, and I placed that information in there, as soon as that information goes in, it's populated throughout the run. It comes up the run ID. So if we're running in an automatic setting, now we can start doing what if scenarios. If you're doing change orders, you can get your length information on it. You can start really capturing instantaneous access to data and being able to pull all that information down. And so now you're not having to retype that information over and over again. And that alone has been a significant time savings for electrical contractors.

      And so recently, we've added a feature known as the Master Conduit setting. And so what that is is the ability to mark a conduit as controlling all the information downstream. So if you have information in there, but you're concerned about people updating it throughout the coordination process, what you can do is you can mark one of these and say, this is the master conduit. And now any information input into that conduit will feed down. Any information put into the rest of the conduits will be automatically overridden.

      So we'll put in our standard information. You can see we've got the ID, the from and to. And so if I were to start trying to adjust that information, it automatically reverts back. Same thing with the from and to. But if I were to start accessing over here, now I can drive all the information downstream. So we see different contractors taking the stubs out of the top of the panels, marking those as the master conduits so that anything drawn off the end knows exactly where it's going, and now you're not in a position to lose that information on the upstream design.

      We've also got workset synchronization. So I'm sure we're all chasing large projects here. There's multiple people in the model. We're doing different worksets. So when you're going through, you're clearing clashes and you're making coordination adjustments, it's easy to have the workset be taken up by your active workset. So this is all being drawn on workset one currently, and I'll switch it over to a different workset.

      And the same logic that we've used to approach the parameter data and making sure that it stays consistent along the run is being done inside of here. So even though my active workset is a working workset, as I go through and make adjustments, if I start drawing off the end of it, if I start adding things to do an offset, maybe around a pole, all the information is still live in there, and it's on the same workset. So if you're using worksets to handle your exports, your deliverables, to the GC, now you're not going to have any of those pockets, where a fitting might be missing, or a small section has been added, or copy-and-pasted and ended up on the wrong workset and didn't get exported. Because you don't want to be trying to add that stuff after sign-off.

      And so that was the original release. We wanted to figure out a way to get the information so that you didn't have to continue typing it. Just patch some of those holes that Revit can leave there. And so we started looking at the feeder schedules. And so is everybody in here using feeder schedules on their jobs to track from-to information? Is everyone seeing that, coming off of the one lines? It was a workflow that I had seen being implemented on jobs that weren't even haven't been done on them. I thought to myself, I'd love to use that as the design criteria.

      And it's nice, because we can externalize a lot of this and a lot of this work on the field, so they can decide if they want to run it as four three inch or three four inch, they have those options. And they can start deciding how they want their job done. And what we've done from here is we've been able to import that directly into Revit to create what we call the intelligent schematic. And it'll go through. This is a 10-story building. And it takes about 60 seconds to load it all in. And it'll go through. It QA/QCs all the information. It'll identify if you have conduit runs that are over 360 without a pull point on it. It'll identify if the conduit trade size in the model isn't aligning with what was requested inside of Revit.

      And you can continue to actively update that feeder schedule, so if you're on a job where they're breaking things down into sub-panels, you can just send that back over to the modeling team, and they have visibility to it. And so it has all the requirements of the things that will need to be included in that model. And there's some color coordination. The dashed lines are incomplete runs or disconnected runs. All the red lines have-- here's where it's calling out the conduit size. The red lines represent overbent runs, so it automates a lot of that QA/QC.

      And then to take it a step further, we wanted to figure out a way to take even more of the typing out of the equation. So as you can see, we can double-click the nodes inside the feeder schedule, place the equipment from that interface, and it pushes the information into the family and automatically keeps track of it. So anything that's been requested in that feeder schedule will be reconciled in this schedule, and it's got a percent complete up here to help give some visibility as to what the progress is on the distribution system.

      We also see-- I think, Dan, you guys were doing where they were calling out the home run boxes outside of the panel so that they could get that overall run length and then be able to prefab that branch panel. Have all the whips coming straight into the box and then be able to deliver that to the site. And you can get all the wire material information on it and then push it from there.

      And so now we look at the philosophy of what we're trying to do here. A lot of this is based on the idea of automating the QA/QC in such a way that it makes more sense to engage a skilled tradesman on this. If we can take the typing out of it, it makes it a lot easier to bring someone in from the field. No offense, Dan, but they tend to not the type that fast.

      DAN WILSON: No, I don't type that fast.

      JARED REGAN: Are you still doing two fingers?

      DAN WILSON: Pretty much.

      JARED REGAN: Yeah, so it's a burden that can be inhibitive, because it takes time. And time is going to be money, so if we can take that out of there, not only can we reduce the exposure to typographical errors and make sure that the information is flowing through as it was requested, but it makes it more easy for someone to come in from the field and engage in this. It's not that we couldn't identify that a conduit size isn't the right one, or that things have more than 360 degrees and bends in it. It's just not a good use of your time, especially if we can get the computer to automatically recognize that on your behalf.

      And so we can also recognize disconnected runs. All of this is done without using conduit connectors. Is anybody using conduit connectors on the tops of their equipment families? You are? I usually get nos from everyone on that question. And the reason why is that when you start adjusting that, it wants to reconcile the routing. And it's a piping software, so it just throws 90s in everywhere. And assuming they actually do it in such a way that you can bend it, nobody's going to want to pull it. And so I'll be able to point out how we can recognize, without using any of the connectors, if something's moved. So you can make the decision on do I want to move the conduits to the panel or the panel to the conduits?

      It'll also recognize if things are taken out of the feeder schedule and they're left in the model, it'll point that out for you. It'll make sure that what's being requested in that Excel spreadsheet is being driven inside the model, and really framing out that design criteria.

      And so one of the most recent features we've been able to add in here is the ability to do a wire length addition on equipment. And so we can turn over a parameter. This works with existing equipment families, pull boxes. We can provide the parameters so you can go to Autodesk Seek, pull down a Thomas & Betts LB, drop that parameter in, and now it's interoperable with this system. And we can define at the instance or the type level what the makeup is inside those pull boxes. So if we start upsizing pull boxes, it automatically accounts for the wire makeup in there. And what that allows us to do is be able to lock in our copper prices sooner and get the buyout done earlier, so that we can go to whatever wholesaler distributor with a larger order and hopefully negotiate a better price. And then if information is undefined, there's a global customizable setting that you can do to just put in there as a backstop.

      And so with that, we also have the ability to do wire pull calculations on this. And so it's looking at tension, sidewall bearing pressure, as well as the change in angle. This again is all customizable. So if the job spec says that you can't go over 270, we can program that in. And so you can see that 270 is acceptable here, but when it gets above 270, we start having our issues. It also identifies any tension or sidewall bearing pressure failures. We can expand this out and identify specifically which component is the failure point.

      And the philosophy behind that is we could theoretically start placing conduit bodies and things like that, but it makes more sense to be able to identify it, because you're going to have more visibility to the backgrounds to make sure that that box is going to have clearance access, to make sure that all the coordination decisions are still being made by someone with experience in doing this. And so it's very easy to identify it with the hope that if we can put it at the most crucial location, we can reduce the overall number of pull sites on the job, and really bring out some labor savings.

      And conversely, when I was talking about the coordination aspects of it, if we can capture what the cost is on the number of pulls, the number of pull sites that are being added throughout the coordination process, it's a more tangible value to come back to them and say, hey, coordination is not about making the electrical system into spaghetti so that the pipe guy doesn't have to move anywhere. And you can actually get tangible values to it to be able to push that information out. It's also exportable, so if you're doing prison jobs, if you're doing government jobs where they want to see all the stuff documented, it can be exported out. It breaks down the straight components as well as the bent components and has all that information in there.

      So right now we're looking at this line right here. It's overbent. It's got more than 360 in it. And so if I wanted to drop a pull point in, all I would need to do is come in and split the conduit. I'll delete out that section, and I'll drop in a pull box. And the same way as we didn't need to use connectors for equipment reconciliation, we don't need to use them for pull box reconciliation either.

      So that line is still reading out as broken, because it's not up to the face of the box. As soon as it goes through, the line goes complete. I can hover over it and it gives me the change in angle on either side of the pull box. Looks like it cut off a little bit there. So it's got the number of junction boxes as well as the wire length and a conduit length, including the makeup inside the equipment and the panels.

      So it gets a much more comprehensive representation of the actual installation, and you'll never find yourself in a position where the inspector comes through and he says, oh well, that's under 360. Well, that's fine, but you can also run those pull calculators. Say if I put a pull box in here, but I've got my fancy lubricated wires or lubricated conduits, we can actually identify whether or not we can just pull straight through. So we can still be code compliant without necessarily having to add labor to the overall workflow. Yes?

      AUDIENCE: Does it include [INAUDIBLE]?

      JARED REGAN: Yes. You can program all that in, and that can be done, again, at the instance or the type level. And so if you're parametrically changing those box sizes, as it changes, it can increase. And so it captures all that information in there. And so this one is still red. So that's that line right there. And so as you go through this, it's really easy, again, to identify where you're overbent, where you need to put those components so you're getting a more accurate representation of the final system. And you get a better coordination representation. And you don't get caught up in the [INAUDIBLE] cycles.

      And so as I had mentioned we can double-click the nodes right there. And if I were to grab this piece of equipment and move it off, the line's going to update and go dashed. And so that would be the situation where we can decide whether or not we want to move the conduits to the equipment, or move the equipment over to the conduits and be able to capture all that information. And so during the design process, if panels are moving on you again, we don't necessarily want Revit to handle that auto routing for us, because it's going to put in 90s as much as it can. And that's not going to get a good response from the field.

      And so now we take this information, and we wanted to make sure it was broadly interoperable, because the electrical contractor has been neglected for so long. Everyone's gone on their own divergent paths. So all of this can be mapped into your existing parameters, existing schedules, existing tags, templates. We've had success on direct integration into active projects, as well as getting integrated into newly. The contractors newly adopting Revit. We can use your existing equipment and pull point families. It also integrates with Schneider Electric's LayoutFAST. We haven't had many issues on, actually any issues at all on the direct interoperability. It's all based off the general parameters. As long as you're using the electrical equipment category, and you're populating that panel name, it's going to reconcile automatically.

      We can also map that information of the feeder schedules directly into Revit. And I'll talk about how we can bring value backwards out to that feeder schedule here shortly. We also have direct integration with the Greenlee BendWorks application. And it's not to say that we couldn't place couplings and give you dimensions. It's just that they-- by show of hands, everybody have a Greenlee bender in their shop, I assume? They're dominating the market. So rather than try and create our own solutions that will displace existing partners, we engage with them. And we actually do the development on BendWorks.

      And at 4:45 DeWalt is going to be releasing the HangerWorks application. And that does seismic trapeze. And so with all the information on it, it's much easier to capture all that coordination. Be able to create an accurate representation of where my couplings are going to be. Where my hangers are going to be. If I can pull my accurate wire lengths and associate it back to the ID, now we can start spooling our own wire in the shop and cutting down our reel inventory on the job site. If we can aggregate all this information, then we can start really doing the material buyouts and providing value to the management team.

      And then just recently we won the Showstopper award out in Boston at the NECA conference for our integration with the ConEst estimation system. And so we have the ability right now to take this information and push it right back into your IntelliBid database, which you're not going to use that to estimate a job, because you're not going to go through and model the whole thing and then give them a bill.

      But what you can do is if you're doing value engineering, if you're doing change orders, if you're doing design build workflows, you can just kick out a take off. And inside of ConEst, they have a bid analysis tool. So you can compare your post-coordination information with your original estimate and get an accurate breakdown of what went wrong, how accurate was the original estimate, and what changed throughout the coordination process?

      And so if I go to the field and I ask him to compile that feeder schedule, they usually would ask me, what are you going to do for me? And so we created the ability to export all that wire information right back into that same feeder schedule. And so we can capture the conduit, the wire. We can aggregate that in Microsoft Excel to create that buyout and get the accurate materials.

      We also have our wirepull documentation loaded in there. We can provide access through a free license if the engineer wants to see what those feeder lengths are, but he doesn't want to get into the nitty gritty of having to navigate a Revit model. We can kick out that feeder schedule. We can export it as its own separate file, provide him a license, and he can go through or that person can go through and access all that same information.

      So it functions as both a project management tool as well as a design tool. And all that information, again, makes its way back into the conduit run schedule. And this is a license that can be deactivated and moved around between multiple users. So when you deactivate that license, it doesn't go through and delete all that information out. It's always going to live inside there. So you still have the ability to access it inside the project, as well as through tags, schedules. Have all that information layout on the sheet. Accurate. The exact information that the field requested with all the coordination lengths that you have designed.

      And so now when we think about how we bring value, it's much easier now for us to bring in a skilled tradesman. We are the Autodesk skilled trades representatives, so we work with the JATCs, the IBEW, the UA on getting the software in their hands. Get them training, get them experience with robotic total stations, all that good stuff. But we wanted to make sure that we're making the software more and more user friendly. So it makes more sense to bring those people in. Now that we've got accurate material breakdowns, it's a lot easier to start ordering your materials. You're cutting down the scrap on the site.

      It opens up opportunities for other prefabrication avenues as well. We've got accurate circuit lengths, so now we have the doors open to start looking at voltage drop issues, dependent upon the information that's available in the model. It's not unreasonable to believe that we'll be able to do arc flash as well. And the accessible parameter data, this pushes right back in. So if you have existing template schedules, tags, this will be directly interoperable.

      And a nice layer of assurance on the code compliance side as well, so that you don't have to deal with the inspector coming through and giving you a headache. And so, Dan, you want to take over and discuss your experiences and the return on investment you've seen?

      DAN WILSON: Sure. And I decided to do a little return on investment thing of the most simple part of this, where we find value that most people might even just overlook. So I looked it up. An average person, not being me, would type about 40 words per minute, with typically an 8% error rate. So we figure we run probably 10 to 12 parameters in every conduit. Depending on if it's branch conduit or feeder conduit, the parameters are going to change. And all of that data has to be scheduled out. Goes to our PM for buyout, our field for installation purposes, anything like that. So we started looking at this a little bit.

      Well, if we do 20 words, roughly, per conduit, and we have to update that probably five times minimum during coordination. Like Jared spoke to earlier on, that when you break a conduit, redraw it, you have to re-enter all that data over and over and over. So I'm being on the light side, but five times is probably a good average. During 90 days of coordination, that's 100 additional words that we've got to go back. Doesn't seem like a lot. We're easily doing 100 conduits on a project, because we're modeling everything. We're modeling 1/2 inch conduit in the wall, 3/4 inch home runs. We are modeling everything.

      So easily 100 words per project. So that's 100 conduits per project, that's 10,000 words. Error rate at 8%. Now we've got 800 errors. How do you put value to that? Hope you catch it? What if you don't catch it? Then there could be a lot of cost involved in all these errors from retyping.

      I used our burden rate. It's a basic rate. $75 an hour, $1.25 a minute. That's the burden rate at our shop, roughly. So you start doing some math here. It's 250 minutes. It's only $312 per project in a quarter. Our company is averaging 12 projects a year that we're using this software on. So just in simple typing and errors, we're saving $3,700. And we're not even looking at all the other things this does.

      When we first met up with Jared and his team, they asked us what we needed. Two things we needed more than anything was fix this problem. And the second thing was allow us to schedule our user-defined parameters on our conduit run schedules. We use pretty much everything. I mean, I get updates from you every couple of weeks. So that's why he really ran through this more than I did, because he knows it. When was your last release? Last week or something? Two weeks?

      JARED REGAN: Our last release went out about early October. And that was the integration of the wire makeup. This product has been in development for about 14 months, so it's definitely got a lot of room to grow. And in that time we've been able to engage a number of contractors throughout Pacific Northwest, down through Atlanta and New York.

      DAN WILSON: We're using the schematic on our branch conduits. So we know if we need another four square box somewhere. I mean, we're getting down into the nuts and bolts of things. And it's been a great tool for us. And I was very happy to be here to help share this tool. It solved a lot of our problems for our scheduling needs. Does anybody have any questions?

      AUDIENCE: MC cable. Does that [INAUDIBLE]?

      DAN WILSON: So for MC cable, we're currently modeling 1/2 inch conduit. A lot of the stuff we model never goes to coordination. It's strictly for field use. It's for field use so we can tell them exactly how long the runs are, what wire, what circuit. We know how much blue number 12 THHN do we need to order for this job. Because by circuit number, we can tell what color it is. So yes, we're taking it down from the home running box down the walls into the devices. Our goal, where I'm at, is to model 100% of everything. Model and schedule everything. And we're only doing that for prefab reasons. At our company, we're trying to get better at prefab. Trying to stay on top of the current marketplace, and this tool's helped us do it. And you had a question, sir?

      AUDIENCE: The marking the master conduit that then pushes that data out to all the other conduits. Is there a way where you can see which ones those are, or do you just have to remember which one it is?

      DAN WILSON: Good question.

      AUDIENCE: [INAUDIBLE] making those your standard masters, that's easy. But if somebody [INAUDIBLE] and makes their master somewhere down the line, is there a way to find that?

      JARED REGAN: It'll identify it. It'll turn it off. And then with that, all of these, all the parameters are existing inside the conduits. They're all shared parameters. You can develop, you can export them, develop tags off of them. You can also lock them down through pinning and through workset access. And then also you can do filters, and run all of that as well.

      DAN WILSON: That was a pretty good update, because before that, we found problems where somebody would change something on the other end of a conduit, thinking it was a different run. And it would drive the data back, and it would be the wrong data. And that master conduit data solved that problem for us.

      JARED REGAN: Or if you find yourself doing a fair amount of copy-paste work as well, it's easy to take that information and put it on the run. And now you've got different information on either side and you know exactly which one's going to pass straight through. If you're not using that master conduit setting, it'll prioritize what was put in by a user over a copy-paste situation. And so if I copy and pasted some content over, and it connected with something with the information in a line, it would go by majority rules. And so it would assume that the most common data is going to be the more correct data.

      DAN WILSON: Yes sir?

      JARED REGAN: Yes?

      AUDIENCE: What about transition from PVC pipe to EMT? How does it-- does it know when changes [INAUDIBLE]?

      DAN WILSON: We're using different types of conduit. And when we make that transition, we use the out-of-the-box Revit connector. We cut the pipe. We've just done an Edit Type, change the type to PVC to GRC connector, GRC to EMT. Whatever, so we'll have different connectors that we'll use at those locations.

      AUDIENCE: And how do you get the wire [INAUDIBLE] wire from point A to point B?

      DAN WILSON: It's still the same conduit run. So it's just that conduit run now has multiple types of conduit used throughout it.

      JARED REGAN: And with this as well, there's a fix in there that I didn't include on this, but if you've ever had to go through the Change Type exercise, it has a bug inside of Revit where it'd actually delete the conduit run directly out of the database side, as well as level all the parameter information you might have put in it. And we've been able to solve that as well. So it's a lot easier to make those transitions. And that was part of the integration with the BendWorks application. In that application, you choose your conduit based off of the material in the bender, and it'll size the radius for you, give your inside outside diameters, all that good stuff, and give you your prefab information. But if they decide we're going to use an 855 in the field, and we're going to use an 881 in the shop, if you need to make that transition through, now you're not going lose any of that information. So you have that flexibility to go in between types without having to retype any of that information.

      DAN WILSON: Anything else? Everybody enjoying AU?

      AUDIENCE: Absolutely. Did you guys, I know SysQue the difference between you guys and SysQue. SysQue's [INAUDIBLE].

      DAN WILSON: I've been through the SysQue demos. They've been to our office a couple of times. There was some things about it that I really did like, and there was some things that I didn't like. I'm not a fluent user of it. But it's almost apples and oranges in some ways. SysQue kind of would relate more into BendWorks than this application here. It comes filled with a library full of stuff that we didn't want to use was one of the big things. Anybody else?

      JARED REGAN: Awesome. Well, we are running a little bit early. It only takes 30 minutes to get through the demonstration. We like to think of it as being elegant in that way. If there's any other questions, we'll be at booth 2680, and feel free to come by, drop us a question on any information we can provide you. We'd gladly, gladly have that conversation.

      DAN WILSON: Thank you, everybody.

      JARED REGAN: Thank you.

      Downloads

      ______
      icon-svg-close-thick

      Cookie 首选项

      您的隐私对我们非常重要,为您提供出色的体验是我们的责任。为了帮助自定义信息和构建应用程序,我们会收集有关您如何使用此站点的数据。

      我们是否可以收集并使用您的数据?

      详细了解我们使用的第三方服务以及我们的隐私声明

      绝对必要 – 我们的网站正常运行并为您提供服务所必需的

      通过这些 Cookie,我们可以记录您的偏好或登录信息,响应您的请求或完成购物车中物品或服务的订购。

      改善您的体验 – 使我们能够为您展示与您相关的内容

      通过这些 Cookie,我们可以提供增强的功能和个性化服务。可能由我们或第三方提供商进行设置,我们会利用其服务为您提供定制的信息和体验。如果您不允许使用这些 Cookie,可能会无法使用某些或全部服务。

      定制您的广告 – 允许我们为您提供针对性的广告

      这些 Cookie 会根据您的活动和兴趣收集有关您的数据,以便向您显示相关广告并跟踪其效果。通过收集这些数据,我们可以更有针对性地向您显示与您的兴趣相关的广告。如果您不允许使用这些 Cookie,您看到的广告将缺乏针对性。

      icon-svg-close-thick

      第三方服务

      详细了解每个类别中我们所用的第三方服务,以及我们如何使用所收集的与您的网络活动相关的数据。

      icon-svg-hide-thick

      icon-svg-show-thick

      绝对必要 – 我们的网站正常运行并为您提供服务所必需的

      Qualtrics
      我们通过 Qualtrics 借助调查或联机表单获得您的反馈。您可能会被随机选定参与某项调查,或者您可以主动向我们提供反馈。填写调查之前,我们将收集数据以更好地了解您所执行的操作。这有助于我们解决您可能遇到的问题。. Qualtrics 隐私政策
      Akamai mPulse
      我们通过 Akamai mPulse 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Akamai mPulse 隐私政策
      Digital River
      我们通过 Digital River 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Digital River 隐私政策
      Dynatrace
      我们通过 Dynatrace 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Dynatrace 隐私政策
      Khoros
      我们通过 Khoros 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Khoros 隐私政策
      Launch Darkly
      我们通过 Launch Darkly 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Launch Darkly 隐私政策
      New Relic
      我们通过 New Relic 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. New Relic 隐私政策
      Salesforce Live Agent
      我们通过 Salesforce Live Agent 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Salesforce Live Agent 隐私政策
      Wistia
      我们通过 Wistia 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Wistia 隐私政策
      Tealium
      我们通过 Tealium 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Tealium 隐私政策
      Upsellit
      我们通过 Upsellit 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Upsellit 隐私政策
      CJ Affiliates
      我们通过 CJ Affiliates 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. CJ Affiliates 隐私政策
      Commission Factory
      我们通过 Commission Factory 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Commission Factory 隐私政策
      Google Analytics (Strictly Necessary)
      我们通过 Google Analytics (Strictly Necessary) 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Google Analytics (Strictly Necessary) 隐私政策
      Typepad Stats
      我们通过 Typepad Stats 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Typepad Stats 隐私政策
      Geo Targetly
      我们使用 Geo Targetly 将网站访问者引导至最合适的网页并/或根据他们的位置提供量身定制的内容。 Geo Targetly 使用网站访问者的 IP 地址确定访问者设备的大致位置。 这有助于确保访问者以其(最有可能的)本地语言浏览内容。Geo Targetly 隐私政策
      SpeedCurve
      我们使用 SpeedCurve 来监控和衡量您的网站体验的性能,具体因素为网页加载时间以及后续元素(如图像、脚本和文本)的响应能力。SpeedCurve 隐私政策
      Qualified
      Qualified is the Autodesk Live Chat agent platform. This platform provides services to allow our customers to communicate in real-time with Autodesk support. We may collect unique ID for specific browser sessions during a chat. Qualified Privacy Policy

      icon-svg-hide-thick

      icon-svg-show-thick

      改善您的体验 – 使我们能够为您展示与您相关的内容

      Google Optimize
      我们通过 Google Optimize 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Google Optimize 隐私政策
      ClickTale
      我们通过 ClickTale 更好地了解您可能会在站点的哪些方面遇到困难。我们通过会话记录来帮助了解您与站点的交互方式,包括页面上的各种元素。将隐藏可能会识别个人身份的信息,而不会收集此信息。. ClickTale 隐私政策
      OneSignal
      我们通过 OneSignal 在 OneSignal 提供支持的站点上投放数字广告。根据 OneSignal 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 OneSignal 收集的与您相关的数据相整合。我们利用发送给 OneSignal 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. OneSignal 隐私政策
      Optimizely
      我们通过 Optimizely 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Optimizely 隐私政策
      Amplitude
      我们通过 Amplitude 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Amplitude 隐私政策
      Snowplow
      我们通过 Snowplow 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Snowplow 隐私政策
      UserVoice
      我们通过 UserVoice 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. UserVoice 隐私政策
      Clearbit
      Clearbit 允许实时数据扩充,为客户提供个性化且相关的体验。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。Clearbit 隐私政策
      YouTube
      YouTube 是一个视频共享平台,允许用户在我们的网站上查看和共享嵌入视频。YouTube 提供关于视频性能的观看指标。 YouTube 隐私政策

      icon-svg-hide-thick

      icon-svg-show-thick

      定制您的广告 – 允许我们为您提供针对性的广告

      Adobe Analytics
      我们通过 Adobe Analytics 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Adobe Analytics 隐私政策
      Google Analytics (Web Analytics)
      我们通过 Google Analytics (Web Analytics) 收集与您在我们站点中的活动相关的数据。这可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。我们使用此数据来衡量我们站点的性能并评估联机体验的难易程度,以便我们改进相关功能。此外,我们还将使用高级分析方法来优化电子邮件体验、客户支持体验和销售体验。. Google Analytics (Web Analytics) 隐私政策
      AdWords
      我们通过 AdWords 在 AdWords 提供支持的站点上投放数字广告。根据 AdWords 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 AdWords 收集的与您相关的数据相整合。我们利用发送给 AdWords 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. AdWords 隐私政策
      Marketo
      我们通过 Marketo 更及时地向您发送相关电子邮件内容。为此,我们收集与以下各项相关的数据:您的网络活动,您对我们所发送电子邮件的响应。收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、电子邮件打开率、单击的链接等。我们可能会将此数据与从其他信息源收集的数据相整合,以根据高级分析处理方法向您提供改进的销售体验或客户服务体验以及更相关的内容。. Marketo 隐私政策
      Doubleclick
      我们通过 Doubleclick 在 Doubleclick 提供支持的站点上投放数字广告。根据 Doubleclick 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Doubleclick 收集的与您相关的数据相整合。我们利用发送给 Doubleclick 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Doubleclick 隐私政策
      HubSpot
      我们通过 HubSpot 更及时地向您发送相关电子邮件内容。为此,我们收集与以下各项相关的数据:您的网络活动,您对我们所发送电子邮件的响应。收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、电子邮件打开率、单击的链接等。. HubSpot 隐私政策
      Twitter
      我们通过 Twitter 在 Twitter 提供支持的站点上投放数字广告。根据 Twitter 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Twitter 收集的与您相关的数据相整合。我们利用发送给 Twitter 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Twitter 隐私政策
      Facebook
      我们通过 Facebook 在 Facebook 提供支持的站点上投放数字广告。根据 Facebook 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Facebook 收集的与您相关的数据相整合。我们利用发送给 Facebook 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Facebook 隐私政策
      LinkedIn
      我们通过 LinkedIn 在 LinkedIn 提供支持的站点上投放数字广告。根据 LinkedIn 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 LinkedIn 收集的与您相关的数据相整合。我们利用发送给 LinkedIn 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. LinkedIn 隐私政策
      Yahoo! Japan
      我们通过 Yahoo! Japan 在 Yahoo! Japan 提供支持的站点上投放数字广告。根据 Yahoo! Japan 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Yahoo! Japan 收集的与您相关的数据相整合。我们利用发送给 Yahoo! Japan 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Yahoo! Japan 隐私政策
      Naver
      我们通过 Naver 在 Naver 提供支持的站点上投放数字广告。根据 Naver 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Naver 收集的与您相关的数据相整合。我们利用发送给 Naver 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Naver 隐私政策
      Quantcast
      我们通过 Quantcast 在 Quantcast 提供支持的站点上投放数字广告。根据 Quantcast 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Quantcast 收集的与您相关的数据相整合。我们利用发送给 Quantcast 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Quantcast 隐私政策
      Call Tracking
      我们通过 Call Tracking 为推广活动提供专属的电话号码。从而,使您可以更快地联系我们的支持人员并帮助我们更精确地评估我们的表现。我们可能会通过提供的电话号码收集与您在站点中的活动相关的数据。. Call Tracking 隐私政策
      Wunderkind
      我们通过 Wunderkind 在 Wunderkind 提供支持的站点上投放数字广告。根据 Wunderkind 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Wunderkind 收集的与您相关的数据相整合。我们利用发送给 Wunderkind 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Wunderkind 隐私政策
      ADC Media
      我们通过 ADC Media 在 ADC Media 提供支持的站点上投放数字广告。根据 ADC Media 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 ADC Media 收集的与您相关的数据相整合。我们利用发送给 ADC Media 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. ADC Media 隐私政策
      AgrantSEM
      我们通过 AgrantSEM 在 AgrantSEM 提供支持的站点上投放数字广告。根据 AgrantSEM 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 AgrantSEM 收集的与您相关的数据相整合。我们利用发送给 AgrantSEM 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. AgrantSEM 隐私政策
      Bidtellect
      我们通过 Bidtellect 在 Bidtellect 提供支持的站点上投放数字广告。根据 Bidtellect 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Bidtellect 收集的与您相关的数据相整合。我们利用发送给 Bidtellect 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Bidtellect 隐私政策
      Bing
      我们通过 Bing 在 Bing 提供支持的站点上投放数字广告。根据 Bing 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Bing 收集的与您相关的数据相整合。我们利用发送给 Bing 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Bing 隐私政策
      G2Crowd
      我们通过 G2Crowd 在 G2Crowd 提供支持的站点上投放数字广告。根据 G2Crowd 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 G2Crowd 收集的与您相关的数据相整合。我们利用发送给 G2Crowd 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. G2Crowd 隐私政策
      NMPI Display
      我们通过 NMPI Display 在 NMPI Display 提供支持的站点上投放数字广告。根据 NMPI Display 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 NMPI Display 收集的与您相关的数据相整合。我们利用发送给 NMPI Display 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. NMPI Display 隐私政策
      VK
      我们通过 VK 在 VK 提供支持的站点上投放数字广告。根据 VK 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 VK 收集的与您相关的数据相整合。我们利用发送给 VK 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. VK 隐私政策
      Adobe Target
      我们通过 Adobe Target 测试站点上的新功能并自定义您对这些功能的体验。为此,我们将收集与您在站点中的活动相关的数据。此数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID、您的 Autodesk ID 等。根据功能测试,您可能会体验不同版本的站点;或者,根据访问者属性,您可能会查看个性化内容。. Adobe Target 隐私政策
      Google Analytics (Advertising)
      我们通过 Google Analytics (Advertising) 在 Google Analytics (Advertising) 提供支持的站点上投放数字广告。根据 Google Analytics (Advertising) 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Google Analytics (Advertising) 收集的与您相关的数据相整合。我们利用发送给 Google Analytics (Advertising) 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Google Analytics (Advertising) 隐私政策
      Trendkite
      我们通过 Trendkite 在 Trendkite 提供支持的站点上投放数字广告。根据 Trendkite 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Trendkite 收集的与您相关的数据相整合。我们利用发送给 Trendkite 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Trendkite 隐私政策
      Hotjar
      我们通过 Hotjar 在 Hotjar 提供支持的站点上投放数字广告。根据 Hotjar 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Hotjar 收集的与您相关的数据相整合。我们利用发送给 Hotjar 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Hotjar 隐私政策
      6 Sense
      我们通过 6 Sense 在 6 Sense 提供支持的站点上投放数字广告。根据 6 Sense 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 6 Sense 收集的与您相关的数据相整合。我们利用发送给 6 Sense 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. 6 Sense 隐私政策
      Terminus
      我们通过 Terminus 在 Terminus 提供支持的站点上投放数字广告。根据 Terminus 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 Terminus 收集的与您相关的数据相整合。我们利用发送给 Terminus 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. Terminus 隐私政策
      StackAdapt
      我们通过 StackAdapt 在 StackAdapt 提供支持的站点上投放数字广告。根据 StackAdapt 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 StackAdapt 收集的与您相关的数据相整合。我们利用发送给 StackAdapt 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. StackAdapt 隐私政策
      The Trade Desk
      我们通过 The Trade Desk 在 The Trade Desk 提供支持的站点上投放数字广告。根据 The Trade Desk 数据以及我们收集的与您在站点中的活动相关的数据,有针对性地提供广告。我们收集的数据可能包含您访问的页面、您启动的试用版、您播放的视频、您购买的东西、您的 IP 地址或设备 ID。可能会将此信息与 The Trade Desk 收集的与您相关的数据相整合。我们利用发送给 The Trade Desk 的数据为您提供更具个性化的数字广告体验并向您展现相关性更强的广告。. The Trade Desk 隐私政策
      RollWorks
      We use RollWorks to deploy digital advertising on sites supported by RollWorks. Ads are based on both RollWorks data and behavioral data that we collect while you’re on our sites. The data we collect may include pages you’ve visited, trials you’ve initiated, videos you’ve played, purchases you’ve made, and your IP address or device ID. This information may be combined with data that RollWorks has collected from you. We use the data that we provide to RollWorks to better customize your digital advertising experience and present you with more relevant ads. RollWorks Privacy Policy

      是否确定要简化联机体验?

      我们希望您能够从我们这里获得良好体验。对于上一屏幕中的类别,如果选择“是”,我们将收集并使用您的数据以自定义您的体验并为您构建更好的应用程序。您可以访问我们的“隐私声明”,根据需要更改您的设置。

      个性化您的体验,选择由您来做。

      我们重视隐私权。我们收集的数据可以帮助我们了解您对我们产品的使用情况、您可能感兴趣的信息以及我们可以在哪些方面做出改善以使您与 Autodesk 的沟通更为顺畅。

      我们是否可以收集并使用您的数据,从而为您打造个性化的体验?

      通过管理您在此站点的隐私设置来了解个性化体验的好处,或访问我们的隐私声明详细了解您的可用选项。