Define information requirements for AEC projects (according to the ISO 19650 series) - Quiz

Define information requirements for AEC projects (according to the ISO 19650 series) - Quiz

Required for course completion

8 questions

The Level of Information Need is a conceptual indication of what?

(Select one)
Select an answer

Acceptance criteria for information are based on what?

(Select one)
Select an answer

The Organizational Information Requirements (OIR), Asset Information Requirements (AIR), and Project Information Requirements (PIR) form the basis for what?

(Select one)
Select an answer

When is the Project Information Model (PIM) developed?

(Select one)
Select an answer

During the operational phase of the lifecycle of an asset, the Asset Information Model (AIM) may be changed as a result of a what?

(Select one)
Select an answer

What do the Exchange Information Requirements (EIR) set out?

(Select one)
Select an answer

Across a project team, there can be: (Select two.)

Select up to 2
Select an answer

The Exchange Information Requirements (EIR) from all contracted appointments should do what?

(Select one)
Select an answer

8/8 questions left unanswered