Pre-test

Before you begin this course, test your skills by taking the following assessment to see where you stand. 

Keep track of your incorrect answers to know which skills you should study. You'll have a chance to take this same practice test again at the end of the course to see how you've improved.

All questions must be answered to submit your assessment.

Pre-assessment

49 questions

What alignment is the width of a widening alignment based on?

(Select one)
Select an answer

What information is contained in the survey figure prefix database?

(Select one)
Select an answer

Please refer to the exhibit:
Exhibit_03_06.png 
What is the most efficient way to add major and minor station labels at specified intervals along an alignment?

(Select one)
Select an answer

How are raw descriptions assigned a full description?

(Select one)
Select an answer

After a surface analysis is performed, how is it displayed in a drawing?

(Select one)
Select an answer

A drawing contains a long linear project with a polyline representing the alignment. What should be used to create multiple plan only sheets?

(Select one)
Select an answer

Which pressure pipe editing tool will automatically adjust pipe elevations based on a predetermined depth below a selected surface?

(Select one)
Select an answer

A large linear project contains an alignment than spans multiple sheets. How should you annotate where the multiple sheets have been divided?

(Select one)
Select an answer

For a roadway project that extends across several sheets, how should the bearings and distances be annotated?

(Select one)
Select an answer

When a design profile between two existing roads creates too much cut or fill, which of these workflows should resolve the issue?

(Select one)
Select an answer

What is unique about feature lines created from a corridor?

(Select one)
Select an answer

Please refer to the exhibit:
Exhibit_02_09.png 
An Existing Ground surface has been created. The contour labeled "Contour A" does not correctly represent the curb and gutter identified with the survey points shown. Which of these workflows should be performed to produce the contour labeled "Contour B" in the Existing Ground surface?

(Select one)
Select an answer

How are elevations of a TIN surface calculated?

(Select one)
Select an answer

A point group named HIDE is created. It includes all points, has point styles and point label styles set to None, and style overrides are enabled. What is the result of point visibility in the drawing if this point group is at the top of the point group list?

(Select one)
Select an answer

Please refer to the exhibit: Exhibit_01_06 
The point labeled 1 is in a base drawing with UCS set to World. The point labeled 2 is how the point looks on a sheet with a different view rotation. What change should be made in the base drawing so that the COGO point labeled as 2 will match the correct rotation labeled as 1 in all sheet viewport rotations?

(Select one)
Select an answer

A proposed utility line crosses from within a public right-of-way into a public utility easement. Which of these workflows will include a label at this location in the profile view?

(Select one)
Select an answer

After creating a temporary rough grading surface with feature lines, how can grading groups for the proposed surface be prevented from interacting with these temporary surface feature lines?

(Select one)
Select an answer

What is the most efficient way to resolve variable width corridors with daylighting subassemblies that overlap without leaving any gaps in the daylight areas?

(Select one)
Select an answer

Please refer to the exhibit: Exhibit_02_03.png
A proposed pipe network crosses three surfaces: EG (existing grade), SG (site grading) and RG (road grading). Some site grading (SG) content overlaps the road grading (RG) content. To confirm minimum depth requirements, which workflow will create the required final design surface for the proposed pipe network to reference?

(Select one)
Select an answer

To automatically size tree blocks based on diameter, which point parameter would be used?

(Select one)
Select an answer

Please refer to the exhibit: 
Exhibit_05_04.png
After adding a crossing pipe to a profile view, where should the display settings be modified so that the red pipe appears as shown in the exhibit?

(Select one)
Select an answer

Which type of surface analysis is typically used to show cut fill calculations?

(Select one)
Select an answer

What objects can be created from a corridor?

(Select one)
Select an answer

Which of the following transparent commands should be used with the POLYLINE command to create a property boundary based on a recorded document?

(Select one)
Select an answer

Please refer to the exhibit:
Exhibit_03_22.png 
The alignment label set shown in area (A) is imported to the alignment shown in area B. What is the result?

(Select one)
Select an answer

What type of object is needed to create sample lines?

(Select one)
Select an answer

A drawing contains an existing ground surface, a feature line representing the centerline of a drainage ditch, and a drainage ditch assembly that includes daylight subassemblies. Which of these steps in the order shown will result in a corridor that represents the proposed drainage ditch?

(Select one)
Select an answer

Please refer to the exhibit:
Exhibit_02_16.png 
What step or steps should be taken to combine the two feature lines as shown in area (A) to make a single feature line as shown in area (B)?

(Select one)
Select an answer

What type of point is created when using the Point Creation toolbar?

(Select one)
Select an answer

Please refer to the exhibit: 
Exhibit_02_19.png
A feature line for the proposed curb edge of asphalt (A) has been created. Feature lines for the rest of the curb (B, C, and D) need to be created. The new feature lines need to have appropriate elevations assigned based on the exhibit. Which feature line command should be used?

(Select one)
Select an answer

To show contours within an interior courtyard surrounded by a building, what type of boundary should be used?

(Select one)
Select an answer

When creating multiple section views, what is required in the specified production template?

(Select one)
Select an answer

A single drawing contains multiple Civil 3D elements including alignments, surfaces, and pipe networks. To reduce the amount of time needed to open the drawing and to provide edit access to multiple team members, what should be done?

(Select one)
Select an answer

A drawing contains back of curb feature lines with elevations based on a rough grading surface. Which of these workflows will create a corridor with curbs?

(Select one)
Select an answer

Please refer to the exhibit: Exhibit_01_25.pngA parcel segment curve table has been created. The curve tag numbers are not in the correct order which is shown as numbers in green circles. How should the curve tag numbers be corrected and maintain the dynamic link to the curve segment table for future design changes?

(Select one)
Select an answer

After creating different grading objects for two portions of a feature line, what type of grading object should be created to connect the two grading objects?

(Select one)
Select an answer

In addition to lines and curves, what other object types can be made into an alignment using the Create Alignments from Objects command?

(Select one)
Select an answer

When creating an alignment using the Alignment Layout Tools, what are possible curve type options in the Curve and Spiral Settings?

(Select one)
Select an answer

After creating the walls and berm of a pond, what will add the bottom of the pond to the Grading Group surface?

(Select one)
Select an answer

A large tract of land is going to be subdivided into lots and blocks. How should the first parcel be created?

(Select one)
Select an answer

Please refer to the exhibit:
Exhibit_03_19.png 
Label (A) shows the elevation difference between crossing pipes in a profile view. This label remains linked to the profile view. What type of label is it?

(Select one)
Select an answer

When the Slope (Hold Start) value of a pipe is modified, which of these values will also change?

(Select one)
Select an answer

Please refer to the exhibit: 
Exhibit_03_09.png
What changes should be made to allow the profile view to fit inside the sheet viewport extent as outlined by the red polyline?

(Select one)
Select an answer

The angular difference between grade in and grade out of a design profile is by more than the standard design specifications. If the proposed grades need to be maintained, how should the proposed profile be modified to resolve the design issue?

(Select one)
Select an answer

If surface content is shown outside of an established surface boundary, what should be done to resolve the issue?

(Select one)
Select an answer

Before creating a data shortcut, what steps should be taken and in what order?

(Select one)
Select an answer

After placing structures at existing manhole locations, how should the rim elevation be set?

(Select one)
Select an answer

A proposed surface is being created. The design requires that the edge of an existing sidewalk remain as built. A feature line will be created from the polyline that represents the existing sidewalk. Which of these workflows will provide existing elevations that need to be matched in the proposed design?

(Select one)
Select an answer

A bend is what type of Civil 3D Pressure Pipe object?

(Select one)
Select an answer

49/49 questions left unanswered