Leveraging the I in BIM Using Schedules in Revit.

00:05

In this course, we're going to create and organized Schedules that can be placed on sheets and used for analysis.

00:11

While these examples are mechanical, the concepts and options can be used by all disciplines.

00:18

Working with Schedules can be used in every phase of a project workflow and even the full life cycle of a project,

00:25

from a list of room areas and conceptual design through coordinating schedules and design development,

00:31

to schedules placed on sheets and documentation and read in construction and facilities management.

00:37

Schedules organize information in a BIM project.

00:42

First, we're going to create a Building Component Schedule.

00:46

Next, we will use Schedule properties to organize and clarify the basic schedule,

00:51

and then create a copy of the Schedule and format it so it can be used for analysis.

00:57

We will finally insert an embedded Schedule to expand the analysis of the earlier Schedule more fully.

01:04

In these set of videos, we will create Building Component Schedule for use on a sheet,

01:10

organize scheduled fields for clarification and analysis, and insert an embedded Schedule.

Video transcript

00:01

Leveraging the I in BIM Using Schedules in Revit.

00:05

In this course, we're going to create and organized Schedules that can be placed on sheets and used for analysis.

00:11

While these examples are mechanical, the concepts and options can be used by all disciplines.

00:18

Working with Schedules can be used in every phase of a project workflow and even the full life cycle of a project,

00:25

from a list of room areas and conceptual design through coordinating schedules and design development,

00:31

to schedules placed on sheets and documentation and read in construction and facilities management.

00:37

Schedules organize information in a BIM project.

00:42

First, we're going to create a Building Component Schedule.

00:46

Next, we will use Schedule properties to organize and clarify the basic schedule,

00:51

and then create a copy of the Schedule and format it so it can be used for analysis.

00:57

We will finally insert an embedded Schedule to expand the analysis of the earlier Schedule more fully.

01:04

In these set of videos, we will create Building Component Schedule for use on a sheet,

01:10

organize scheduled fields for clarification and analysis, and insert an embedded Schedule.