& Construction
![architecture engineering and construction collection logo](https://damassets.autodesk.net/content/dam/autodesk/www/universal-header/flyout/architecture-engineering-construction-collection-uhblack-banner-lockup-364x40.png)
Integrated BIM tools, including Revit, AutoCAD, and Civil 3D
& Manufacturing
![product design manufacturing collection logo](https://damassets.autodesk.net/content/dam/autodesk/www/universal-header/flyout/product-design-manufacturing-collection-uhblack-banner-lockup-364x40.png)
Professional CAD/CAM tools built on Inventor and AutoCAD
Integrated BIM tools, including Revit, AutoCAD, and Civil 3D
Professional CAD/CAM tools built on Inventor and AutoCAD
Transcript
00:04
Once you have successfully run a hydraulic model through an
00:07
S,
00:08
you can review the results using the attribute tab of the model explorer.
00:12
And you can create tabular reports using the tools in the report manager
00:16
to begin
00:17
double click the desired project dot APR X file to open Argi
00:21
Pro.
00:23
Once the project starts,
00:24
click the info water pro tab to open the info water pro ribbon
00:29
in the project panel, click initialize
00:34
in the info water pro ribbon view panel. Open the report manager
00:39
in the report manager, click new
00:42
switch to the tabular report tab in select pipe report.
00:47
Make sure the complete report slash graph is selected
00:50
as the data scope and then click open.
00:53
You may have a similar report if you performed a steady state simulation,
00:57
but this report displays the output at multiple times.
01:01
Use the time dropdown to change the time.
01:05
Notice that the report values update based on the chosen time.
01:10
Typically the minimum and maximum values are
01:13
desired for an extended period simulation.
01:16
These values can be found in the range reports
01:20
in the report manager. Click new
01:25
in the tabular report tab select pipe range and then click open,
01:31
use the dropdown to select velocity,
01:35
click the max value column heading to select the whole column,
01:41
right, click and select data histogram plot.
01:45
Select the buy interval option and change the value to 0.5.
01:51
Click classify
01:54
this details the velocity distribution in the
01:56
system using 0.5 ft per second classes.
02:02
Close the histogram
02:04
in the report manager, click the format report icon,
02:10
arrange the display column section so that only max value and min value remain
02:18
click. Ok.
02:20
The report now only displays the specified columns.
02:25
Any report in info
02:26
water pro can be customized using this tool.
02:29
Click hide to close the report manager.
02:33
Every report and graph in the report manager is saved
02:36
in its current state until it is manually removed,
02:39
refreshed or the model is closed.
Video transcript
00:04
Once you have successfully run a hydraulic model through an
00:07
S,
00:08
you can review the results using the attribute tab of the model explorer.
00:12
And you can create tabular reports using the tools in the report manager
00:16
to begin
00:17
double click the desired project dot APR X file to open Argi
00:21
Pro.
00:23
Once the project starts,
00:24
click the info water pro tab to open the info water pro ribbon
00:29
in the project panel, click initialize
00:34
in the info water pro ribbon view panel. Open the report manager
00:39
in the report manager, click new
00:42
switch to the tabular report tab in select pipe report.
00:47
Make sure the complete report slash graph is selected
00:50
as the data scope and then click open.
00:53
You may have a similar report if you performed a steady state simulation,
00:57
but this report displays the output at multiple times.
01:01
Use the time dropdown to change the time.
01:05
Notice that the report values update based on the chosen time.
01:10
Typically the minimum and maximum values are
01:13
desired for an extended period simulation.
01:16
These values can be found in the range reports
01:20
in the report manager. Click new
01:25
in the tabular report tab select pipe range and then click open,
01:31
use the dropdown to select velocity,
01:35
click the max value column heading to select the whole column,
01:41
right, click and select data histogram plot.
01:45
Select the buy interval option and change the value to 0.5.
01:51
Click classify
01:54
this details the velocity distribution in the
01:56
system using 0.5 ft per second classes.
02:02
Close the histogram
02:04
in the report manager, click the format report icon,
02:10
arrange the display column section so that only max value and min value remain
02:18
click. Ok.
02:20
The report now only displays the specified columns.
02:25
Any report in info
02:26
water pro can be customized using this tool.
02:29
Click hide to close the report manager.
02:33
Every report and graph in the report manager is saved
02:36
in its current state until it is manually removed,
02:39
refreshed or the model is closed.
Once you have successfully run a hydraulic model through an EPS, you can review the results using the Attribute tab of the Model Explorer. You can also create tabular reports using the tools in the Report Manager.
You may have seen a similar report if you performed a steady state simulation, but this report displays the output at multiple times.
Typically, the minimum and maximum values are desired for an extended period simulation. These values can be found in the Range reports.
This details the velocity distribution using 0.5 feet per second classes.
Any report in InfoWater Pro can be customized using this tool. Click Hide to close the Report Manager. Every report and graph in the Report Manager is saved in its current state until it is manually removed, refreshed, or the model is closed.
How to buy
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © 2025 Autodesk Inc. All rights reserved
Sign in to start learning
Sign in for unlimited free access to all learning content.Save your progress
Take assessments
Receive personalized recommendations