& Construction
![architecture engineering and construction collection logo](https://damassets.autodesk.net/content/dam/autodesk/www/universal-header/flyout/architecture-engineering-construction-collection-uhblack-banner-lockup-364x40.png)
Integrated BIM tools, including Revit, AutoCAD, and Civil 3D
& Manufacturing
![product design manufacturing collection logo](https://damassets.autodesk.net/content/dam/autodesk/www/universal-header/flyout/product-design-manufacturing-collection-uhblack-banner-lockup-364x40.png)
Professional CAD/CAM tools built on Inventor and AutoCAD
Integrated BIM tools, including Revit, AutoCAD, and Civil 3D
Professional CAD/CAM tools built on Inventor and AutoCAD
Transcript
00:04
Once you set up various scenarios,
00:06
you can also create sub scenarios of
00:08
child scenarios that contain different conditions.
00:11
This allows you to analyze multiple alternatives
00:14
based on the conditions that you change.
00:17
In this exercise.
00:18
You set up three new proposed condition scenarios for annual average demands,
00:23
maximum day demands.
00:25
And the new pumping scheme,
00:27
these new proposed condition scenarios will be Children of the existing
00:32
E X max day and E X alt pumping scenarios respectively
00:38
to begin. Double click the desired project dot APR X file to open
00:42
Agis Pro.
00:44
Once the project starts,
00:45
click the info water pro tab to open the info water pro ribbon
00:51
in the project panel, click initialize
00:54
in the model explorer on the attribute tab, click the scenario explorer icon
01:01
in the scenario explorer under network data scenarios,
01:04
select the existing scenario and then in the toolbar click new scenario
01:11
in the new data scenario pop-up, assign a new id of 2030 to this sub scenario
01:16
and then click OK,
01:19
pipes will be added to this sub scenario.
01:21
So that proposed developments coming online by 2030 can be analyzed,
01:26
repeat this process for the next
01:29
day scenario
01:31
in the network data scenario section, select the
01:34
max day scenario.
01:36
Click new scenario,
01:39
assign a new id of 2030 underscore max day and click. OK.
01:44
This sub scenario will analyze the anticipated
01:51
Once more. Back in the network data scenario section, select the
01:56
alt pumping scenario.
01:58
Click new scenario,
02:00
assign a new id of 2030 underscore alt pumping
02:04
and then click. OK.
02:06
This sub scenario will analyze the anticipated 2030
02:10
facilities under the proposed new pumping operations.
02:14
These 2030 sub scenarios are now ready to be edited,
02:18
click exit to close the scenario explorer.
Video transcript
00:04
Once you set up various scenarios,
00:06
you can also create sub scenarios of
00:08
child scenarios that contain different conditions.
00:11
This allows you to analyze multiple alternatives
00:14
based on the conditions that you change.
00:17
In this exercise.
00:18
You set up three new proposed condition scenarios for annual average demands,
00:23
maximum day demands.
00:25
And the new pumping scheme,
00:27
these new proposed condition scenarios will be Children of the existing
00:32
E X max day and E X alt pumping scenarios respectively
00:38
to begin. Double click the desired project dot APR X file to open
00:42
Agis Pro.
00:44
Once the project starts,
00:45
click the info water pro tab to open the info water pro ribbon
00:51
in the project panel, click initialize
00:54
in the model explorer on the attribute tab, click the scenario explorer icon
01:01
in the scenario explorer under network data scenarios,
01:04
select the existing scenario and then in the toolbar click new scenario
01:11
in the new data scenario pop-up, assign a new id of 2030 to this sub scenario
01:16
and then click OK,
01:19
pipes will be added to this sub scenario.
01:21
So that proposed developments coming online by 2030 can be analyzed,
01:26
repeat this process for the next
01:29
day scenario
01:31
in the network data scenario section, select the
01:34
max day scenario.
01:36
Click new scenario,
01:39
assign a new id of 2030 underscore max day and click. OK.
01:44
This sub scenario will analyze the anticipated
01:51
Once more. Back in the network data scenario section, select the
01:56
alt pumping scenario.
01:58
Click new scenario,
02:00
assign a new id of 2030 underscore alt pumping
02:04
and then click. OK.
02:06
This sub scenario will analyze the anticipated 2030
02:10
facilities under the proposed new pumping operations.
02:14
These 2030 sub scenarios are now ready to be edited,
02:18
click exit to close the scenario explorer.
Once you set up various scenarios, you can also create sub-scenarios of child scenarios that contain different conditions. This allows you to analyze multiple alternatives based on the conditions that you change.
In this tutorial, you set up three new proposed condition scenarios for annual average demands, maximum day demands, and the new pumping scheme. These new proposed condition scenarios will be children of the EXISTING, EX_MAXDAY, and EX_ALTPUMPING scenarios, respectively.
Pipes will be added to this sub-scenario so that proposed developments coming online by 2030 can be analyzed.
This sub-scenario will analyze the anticipated 2030 facilities under a maximum day condition.
This sub-scenario will analyze the anticipated 2030 facilities under the proposed new pumping operations.
How to buy
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © 2025 Autodesk Inc. All rights reserved
Sign in to start learning
Sign in for unlimited free access to all learning content.Save your progress
Take assessments
Receive personalized recommendations