& Construction

Integrated BIM tools, including Revit, AutoCAD, and Civil 3D
& Manufacturing

Professional CAD/CAM tools built on Inventor and AutoCAD
Transcript
00:11
You can use Flow Generative Scheduling
00:13
across multiple Flow Production Tracking sites.
00:16
This could be particularly helpful
00:18
if you use one Flow Production Tracking site per project.
00:22
You can access the playgrounds you create from multiple sites
00:25
without reconnecting Flow Generative Scheduling to each of those sites.
00:29
You don't need to be connected to access the data
00:32
you have already pulled into a playground, since each playground is a snapshot of
00:36
the schedule from the time it was pulled, as opposed to being live data.
00:40
While you do not need to have Flow Generative Scheduling connected
00:43
to a Flow Production Tracking site to work within a playground,
00:46
you will need it to be connected to send the new schedule
00:49
you have created in your playground back to Flow Production Tracking.
00:54
Use the connection setup tool each time you need to pull a schedule or send a schedule
00:58
to Flow Production Tracking and to ensure you are
01:01
connected to the correct Flow Production Tracking site.
01:04
Flow Generative Scheduling can only be connected to
01:07
one Flow Production Tracking site at a time.
00:11
You can use Flow Generative Scheduling
00:13
across multiple Flow Production Tracking sites.
00:16
This could be particularly helpful
00:18
if you use one Flow Production Tracking site per project.
00:22
You can access the playgrounds you create from multiple sites
00:25
without reconnecting Flow Generative Scheduling to each of those sites.
00:29
You don't need to be connected to access the data
00:32
you have already pulled into a playground, since each playground is a snapshot of
00:36
the schedule from the time it was pulled, as opposed to being live data.
00:40
While you do not need to have Flow Generative Scheduling connected
00:43
to a Flow Production Tracking site to work within a playground,
00:46
you will need it to be connected to send the new schedule
00:49
you have created in your playground back to Flow Production Tracking.
00:54
Use the connection setup tool each time you need to pull a schedule or send a schedule
00:58
to Flow Production Tracking and to ensure you are
01:01
connected to the correct Flow Production Tracking site.
01:04
Flow Generative Scheduling can only be connected to
01:07
one Flow Production Tracking site at a time.
You can use Flow Generative Scheduling across multiple Flow Production Tracking sites. This can be particularly helpful if you use one Flow Production Tracking site per project.