Sharing data with BIM 360 Docs

00:00

In release 2020 project sink within both.

00:04

Professional 2020 has been extended to support all

00:07

customers in the infrastructure and civil engineering market

00:11

for streamline collaboration with an extended project team by

00:15

having a big directional connection with 3 16.

00:19

We know that civil infrastructure companies need

00:21

to collaborate on cat documents with owners,

00:24

contractors, engineering service providers and main consultants.

00:29

The documents are often shared and collaborated on across the company firewall.

00:33

Today this looks very complex and civil infrastructure

00:37

companies face the same challenges about using email,

00:40

copying data on ftp sites or using cloud storage is such

00:44

as dropbox one drive or box to collaborate with external users.

00:49

In fact,

00:50

we found out during the current survey that 70% of the

00:53

users continue to share design data with external collaborators via email.

00:58

Often the data is static and information is lost or incomplete.

01:03

This is why we are enabling both customers to connect their data to the cloud

01:08

to be clear, it's not all their data.

01:11

Just the data but they choose with full permissions and fully secure control,

01:15

gain efficiency and increase accessibility by making all relevant

01:19

design and construction data accessible on a single platform,

01:24

creating a single source of truth for everyone

01:27

and ensure that right team members access the right design

01:30

data at the right time throughout the defined process.

01:34

This eliminates the need to download and upload files and

01:38

reduces opportunities for errors in transmission and resulting rework.

01:43

Now relevant.

01:44

Design data is automatically sync between vote

01:47

and been 360 without any user interaction.

01:51

For example, when main consultants update models in

01:55

they get automatically updated to vote for the engineering teams,

01:60

administrators can decide at the project level

02:02

which data should be shared one way or two ways.

02:07

So in the same way as for fusion team here are three

02:10

examples of external collaboration that benefit from the link between being 3 60

02:16

bolt.

02:17

The first is for pre construction teams, contractors and owners

02:21

while designers work in design tools like

02:24

three D.

02:24

When it comes time to execute in the field.

02:27

Today all the data has to be printed

02:30

or translated to a viewable and consumable format

02:33

customers are looking to digitize the process and move

02:36

to paperless projects from the office to work force.

02:40

It means that owners,

02:41

contractors and operators need to consume the latest and greatest design files

02:46

from engineers.

02:47

In addition to that they need to be involved in construct ability reviews.

02:52

As today there's a gap between what happens to project designs

02:56

data and how it is used on the construction site.

02:60

The second is for engineering service providers,

03:03

engineering architecture and marketing teams also need to receive the latest and

03:08

greatest models which are designed and

03:10

maintained by outside engineering service providers

03:14

and enabling the customer to receive copies of

03:16

models and drawings to store for references.

03:20

Finally there is the integrated design collaboration with main consultants.

03:24

This must be a strong and high trust relationship.

03:28

A few examples of main consultants are lot specific consultants.

03:33

Master set consultants, M. E. P. and structural vendors.

03:38

To start with. These consultants need to consume a master set design fires.

03:42

CaD and region standards and at the same time

03:46

they need to contribute and update design fires as well as deliver new design fires.

03:52

Finally assured, not a banner about being 363 60.

03:56

News cases currently focused on data contained in a single file, such as DWG and PF.

04:03

The following types of fire references

04:05

and relationships are not currently supported

04:08

when using been 360 with project sink inventor references and relationships,

04:13

rabbit references and relationships and

04:15

micro station references and relationships.

Video transcript

00:00

In release 2020 project sink within both.

00:04

Professional 2020 has been extended to support all

00:07

customers in the infrastructure and civil engineering market

00:11

for streamline collaboration with an extended project team by

00:15

having a big directional connection with 3 16.

00:19

We know that civil infrastructure companies need

00:21

to collaborate on cat documents with owners,

00:24

contractors, engineering service providers and main consultants.

00:29

The documents are often shared and collaborated on across the company firewall.

00:33

Today this looks very complex and civil infrastructure

00:37

companies face the same challenges about using email,

00:40

copying data on ftp sites or using cloud storage is such

00:44

as dropbox one drive or box to collaborate with external users.

00:49

In fact,

00:50

we found out during the current survey that 70% of the

00:53

users continue to share design data with external collaborators via email.

00:58

Often the data is static and information is lost or incomplete.

01:03

This is why we are enabling both customers to connect their data to the cloud

01:08

to be clear, it's not all their data.

01:11

Just the data but they choose with full permissions and fully secure control,

01:15

gain efficiency and increase accessibility by making all relevant

01:19

design and construction data accessible on a single platform,

01:24

creating a single source of truth for everyone

01:27

and ensure that right team members access the right design

01:30

data at the right time throughout the defined process.

01:34

This eliminates the need to download and upload files and

01:38

reduces opportunities for errors in transmission and resulting rework.

01:43

Now relevant.

01:44

Design data is automatically sync between vote

01:47

and been 360 without any user interaction.

01:51

For example, when main consultants update models in

01:55

they get automatically updated to vote for the engineering teams,

01:60

administrators can decide at the project level

02:02

which data should be shared one way or two ways.

02:07

So in the same way as for fusion team here are three

02:10

examples of external collaboration that benefit from the link between being 3 60

02:16

bolt.

02:17

The first is for pre construction teams, contractors and owners

02:21

while designers work in design tools like

02:24

three D.

02:24

When it comes time to execute in the field.

02:27

Today all the data has to be printed

02:30

or translated to a viewable and consumable format

02:33

customers are looking to digitize the process and move

02:36

to paperless projects from the office to work force.

02:40

It means that owners,

02:41

contractors and operators need to consume the latest and greatest design files

02:46

from engineers.

02:47

In addition to that they need to be involved in construct ability reviews.

02:52

As today there's a gap between what happens to project designs

02:56

data and how it is used on the construction site.

02:60

The second is for engineering service providers,

03:03

engineering architecture and marketing teams also need to receive the latest and

03:08

greatest models which are designed and

03:10

maintained by outside engineering service providers

03:14

and enabling the customer to receive copies of

03:16

models and drawings to store for references.

03:20

Finally there is the integrated design collaboration with main consultants.

03:24

This must be a strong and high trust relationship.

03:28

A few examples of main consultants are lot specific consultants.

03:33

Master set consultants, M. E. P. and structural vendors.

03:38

To start with. These consultants need to consume a master set design fires.

03:42

CaD and region standards and at the same time

03:46

they need to contribute and update design fires as well as deliver new design fires.

03:52

Finally assured, not a banner about being 363 60.

03:56

News cases currently focused on data contained in a single file, such as DWG and PF.

04:03

The following types of fire references

04:05

and relationships are not currently supported

04:08

when using been 360 with project sink inventor references and relationships,

04:13

rabbit references and relationships and

04:15

micro station references and relationships.

Was this information helpful?