Accommodate changes in the alignment during detailed design by connecting Civil 3D to InfraWorks and updating the parameters as changes are made.
Type:
Tutorial
Length:
2 min.
Transcript
00:03
We will start to look at detailed design
00:06
specifically how we can accommodate changes in
00:08
the alignment easily as the project progresses
00:17
where the proposed alignment is available in civil 3d,
00:20
we can connect the drawing as a data source in Infra works.
00:25
Once connected,
00:26
the designer can select from the available components which data is to be used.
00:32
The selected component can then be configured.
00:35
The designer can choose between using the
00:37
corridor component road generated from civil 3D
00:41
which locks the design to the civil 3D design
00:44
or use the component road and configure the road within Infra works.
00:51
Once the road configuration is complete,
00:54
the road is generated in Infra works.
00:57
Now the road is in place.
00:59
The designer can create the bridge structure in the same
01:02
way as we've seen in previous videos in this series.
01:08
It is very common during projects of this nature for changes to be made regularly.
01:14
This can lead to a large amount of rework,
01:16
especially if something critical such as the alignment is modified.
01:22
However, by using this workflow,
01:24
we can avoid large amounts of rework by simply
01:28
refreshing the data from the modified civil 3D drawing.
01:34
Once the road designer has made
01:36
the necessary changes such as alignment modifications
01:40
and re wielding of the corridor.
01:42
They only need to be saved back to
01:44
the original drawing to facilitate the update process.
01:54
Back in Infra works.
01:55
The only operation required to consume the changes is for the
01:59
designer to re import the data and the bridge will rebuild parametric
02:03
automatically.
Video transcript
00:03
We will start to look at detailed design
00:06
specifically how we can accommodate changes in
00:08
the alignment easily as the project progresses
00:17
where the proposed alignment is available in civil 3d,
00:20
we can connect the drawing as a data source in Infra works.
00:25
Once connected,
00:26
the designer can select from the available components which data is to be used.
00:32
The selected component can then be configured.
00:35
The designer can choose between using the
00:37
corridor component road generated from civil 3D
00:41
which locks the design to the civil 3D design
00:44
or use the component road and configure the road within Infra works.
00:51
Once the road configuration is complete,
00:54
the road is generated in Infra works.
00:57
Now the road is in place.
00:59
The designer can create the bridge structure in the same
01:02
way as we've seen in previous videos in this series.
01:08
It is very common during projects of this nature for changes to be made regularly.
01:14
This can lead to a large amount of rework,
01:16
especially if something critical such as the alignment is modified.
01:22
However, by using this workflow,
01:24
we can avoid large amounts of rework by simply
01:28
refreshing the data from the modified civil 3D drawing.
01:34
Once the road designer has made
01:36
the necessary changes such as alignment modifications
01:40
and re wielding of the corridor.
01:42
They only need to be saved back to
01:44
the original drawing to facilitate the update process.
01:54
Back in Infra works.
01:55
The only operation required to consume the changes is for the
01:59
designer to re import the data and the bridge will rebuild parametric
02:03
automatically.
How to buy
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © 2025 Autodesk Inc. All rights reserved
Sign in for the best experience
Save your progress
Get access to courses
Receive personalized recommendations
May we collect and use your data?
Learn more about the Third Party Services we use and our Privacy Statement.May we collect and use your data to tailor your experience?
Explore the benefits of a customized experience by managing your privacy settings for this site or visit our Privacy Statement to learn more about your options.