Generate A+ schematic reports to showcase the details you want; however you want them.
Type:
Tutorial
Length:
5 min.
Transcript
00:03
AutoCAD Electrical is packed with impressive report-generating capabilities.
00:08
Once you create schematic and panel drawings,
00:11
you can generate a report to extract exactly the intelligence you want from these project drawings, format it, and display it on screen.
00:20
The possibilities for what you can create with a few quick clicks are endless.
00:26
On the ribbon, Reports tab, Schematic panel, click Reports to open the Schematic Reports dialog.
00:33
There are a couple of quick things to remember about reports.
00:37
Almost any information you put into a drawing can be extracted into a report.
00:42
Reports are divided into different types, each with related categories of information.
00:48
If the information you want in a report is not available for the selected type, try switching types.
00:55
Also, panel reports can be very similar to schematic reports.
00:60
For example, the schematic Bill of Material report is almost identical to the panel Bill of Material report,
01:07
which means that creating both may be redundant.
01:10
In the Schematic Reports dialog, the report types are listed under Report Name.
01:16
Bill of Material is selected by default, but if you select a different type, such as From/To, notice the options in the dialog change.
01:24
Select Missing Bill of Material, and then select Component to view their different options.
01:31
For this exercise, select Bill of Material.
01:34
Under Bill of Material, select Project to extract information from the entire project, and not just the Active drawing.
01:42
Expand the Category drop-down for a list of available options—Schematic, One-Line, One-Line bus tap, Hydraulic, Pneumatic, and P&ID.
01:53
Based on this selection and the symbols you have selected, relevant components are filtered out and included in the report.
02:01
For this example, leave Schematic selected.
02:05
Under Include, there are options to include cables, connectors, or jumpers.
02:10
In this case, leave All of the below selected.
02:13
The Display group box is specific to the Bill Of Material report.
02:17
These different ways of tallying or grouping report components allow you to change the focus of the report based on its use.
02:25
For example, you can create a purchase list or group a report by installation.
02:31
Select Freshen Project Database to refresh the project database once the report is created.
02:38
Click Format to use a previously saved format for your report.
02:41
In this case, there are none saved, but if you have one created, you can click Browse to select the existing format.
02:49
Click Cancel to close this dialog.
02:52
Most report types include the Installation and Location Code options, which filter the information to be extracted by the report.
03:01
This is a good example of the usefulness of these values.
03:05
When creating schematic designs, be sure to always enter at least the location code for your components.
03:13
In the Location codes to extract group box, select Named Location.
03:18
Next to List, select Project to open the All Locations — Project dialog.
03:23
In the location list, select M, and then click OK.
03:28
This instructs the report to list only components with a location value of M.
03:34
By adjusting this value, you can generate different Bill of Material reports for specific project components.
03:41
Click OK to open the Select Drawings to Process dialog.
03:46
Previously, you opted to create a project-wide report, but, if necessary, you can use this list to narrow it down to specific drawings.
03:56
For this example, click Do All to transfer all drawings to the lower pane, which means they will all be processed for the report.
04:04
Click OK to generate the report.
04:07
In the Report Generator dialog, you can view the report in the upper section, with options below for adding headers and page breaks.
04:16
At the bottom of the dialog, select Put on Drawing, Save to File, or Print to use the report as needed.
Video transcript
00:03
AutoCAD Electrical is packed with impressive report-generating capabilities.
00:08
Once you create schematic and panel drawings,
00:11
you can generate a report to extract exactly the intelligence you want from these project drawings, format it, and display it on screen.
00:20
The possibilities for what you can create with a few quick clicks are endless.
00:26
On the ribbon, Reports tab, Schematic panel, click Reports to open the Schematic Reports dialog.
00:33
There are a couple of quick things to remember about reports.
00:37
Almost any information you put into a drawing can be extracted into a report.
00:42
Reports are divided into different types, each with related categories of information.
00:48
If the information you want in a report is not available for the selected type, try switching types.
00:55
Also, panel reports can be very similar to schematic reports.
00:60
For example, the schematic Bill of Material report is almost identical to the panel Bill of Material report,
01:07
which means that creating both may be redundant.
01:10
In the Schematic Reports dialog, the report types are listed under Report Name.
01:16
Bill of Material is selected by default, but if you select a different type, such as From/To, notice the options in the dialog change.
01:24
Select Missing Bill of Material, and then select Component to view their different options.
01:31
For this exercise, select Bill of Material.
01:34
Under Bill of Material, select Project to extract information from the entire project, and not just the Active drawing.
01:42
Expand the Category drop-down for a list of available options—Schematic, One-Line, One-Line bus tap, Hydraulic, Pneumatic, and P&ID.
01:53
Based on this selection and the symbols you have selected, relevant components are filtered out and included in the report.
02:01
For this example, leave Schematic selected.
02:05
Under Include, there are options to include cables, connectors, or jumpers.
02:10
In this case, leave All of the below selected.
02:13
The Display group box is specific to the Bill Of Material report.
02:17
These different ways of tallying or grouping report components allow you to change the focus of the report based on its use.
02:25
For example, you can create a purchase list or group a report by installation.
02:31
Select Freshen Project Database to refresh the project database once the report is created.
02:38
Click Format to use a previously saved format for your report.
02:41
In this case, there are none saved, but if you have one created, you can click Browse to select the existing format.
02:49
Click Cancel to close this dialog.
02:52
Most report types include the Installation and Location Code options, which filter the information to be extracted by the report.
03:01
This is a good example of the usefulness of these values.
03:05
When creating schematic designs, be sure to always enter at least the location code for your components.
03:13
In the Location codes to extract group box, select Named Location.
03:18
Next to List, select Project to open the All Locations — Project dialog.
03:23
In the location list, select M, and then click OK.
03:28
This instructs the report to list only components with a location value of M.
03:34
By adjusting this value, you can generate different Bill of Material reports for specific project components.
03:41
Click OK to open the Select Drawings to Process dialog.
03:46
Previously, you opted to create a project-wide report, but, if necessary, you can use this list to narrow it down to specific drawings.
03:56
For this example, click Do All to transfer all drawings to the lower pane, which means they will all be processed for the report.
04:04
Click OK to generate the report.
04:07
In the Report Generator dialog, you can view the report in the upper section, with options below for adding headers and page breaks.
04:16
At the bottom of the dialog, select Put on Drawing, Save to File, or Print to use the report as needed.
How to buy
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © 2025 Autodesk Inc. All rights reserved
Sign in for the best experience
Save your progress
Get access to courses
Receive personalized recommendations
May we collect and use your data?
Learn more about the Third Party Services we use and our Privacy Statement.May we collect and use your data to tailor your experience?
Explore the benefits of a customized experience by managing your privacy settings for this site or visit our Privacy Statement to learn more about your options.