Convert duct and pipe placeholder layouts.
Type:
Tutorial
Length:
6 min.
Tutorial resources
These downloadable resources will be used to complete this tutorial:
Transcript
00:04
With traditional workflows.
00:06
Early stage mechanical layouts are sometimes discarded
00:10
as the project moves to detailed design
00:12
and the duct and piping networks recreated to
00:15
suit the requirements of the developing project.
00:19
Rivet duct and pipe placeholders can be used to leverage early stage
00:23
layouts to create detailed mechanical networks
00:26
utilizing and working with existing information.
00:29
Rather than starting over.
00:32
In this example,
00:33
we will review the duct and pipe placeholders already in the project,
00:37
then convert each layout to duct and pipe including fittings
00:41
while making positional changes as necessary.
00:44
We will finish by adding pipe accessories with the option of
00:47
additional duct and pipe accessories to complete the detailed layout.
00:53
Ensure the current view is set to H VAC floor plans.
00:58
One mec
01:01
let's start by reviewing the supply duct layout,
01:05
selecting a duct placeholder and reviewing the
01:08
properties shows the duct type size and elevation
01:13
using the tab key from the keyboard. Select the entire system
01:18
once selected use the type selector to change the duck type to round duct with Ts
01:25
and set the diameter to eight inches.
01:30
Finally select convert placeholder from the contextual ribbon tab.
01:38
The usual editing tools can now be used to make the necessary adjustments.
01:44
Remove the excess duct from the end of the system
01:50
and convert the cross fitting
01:52
to A T.
01:55
Then from the modify tab of the ribbon,
01:58
use the split element tool to create splits just after each takeoff along the run.
02:10
Select the first run of duct at the riser
02:14
and set the size to 14 inches.
02:23
Select the second run and set the size to 12 inches
02:34
and the third run to 10 inches.
02:41
Finally select a section of the main rum and
02:45
alter the elevation to 9 ft and four inches.
02:51
Further changes can be made to the duck type by selecting the relevant parts
02:56
of the network and choosing change type from the edit panel of the ribbon
03:00
and making the appropriate selection from the type selector.
03:06
Let's go ahead and convert the chilled water flow piping network in the same way,
03:14
use the tab key to chain,
03:16
select the pipework ensuring the pipework is
03:19
set to carbon steel screwed flange coupling.
03:24
Once selected, choose convert placeholder from the ribbon,
03:30
then remove the excess pipe at the end and convert the T to an elbow.
03:38
Finally
03:39
change the elevation for the piping network to 8 ft 10 inches
03:46
and the diameter to one and a quarter inches
03:56
follow the same procedure to convert the chilled water return piping network using
04:02
the same pipe type and setting the elevation to 9 ft nine inches.
04:12
Once converted, the piping networks can be repositioned
04:21
connected to equipment,
04:27
pipe and duct accessories can be added
04:34
and detailed coordination can be carried out,
04:39
finish connecting the remaining equipment to the
04:42
chilled water flow and chilled order,
04:44
return piping networks
04:46
and complete the detailed layout by adding pipe accessories.
04:51
If the details of the design are known at an early stage in a project,
04:55
then duct and pipe placeholders may not have been used
04:58
and a detailed coordinated layout created from the start.
05:02
However,
05:03
where placeholders have been used time can
05:05
be saved by utilizing the original intent
05:08
convert placeholders to duct and pipe
05:11
reposition and connect to equipment, fixtures and air terminals as required.
05:16
And finally add the appropriate duct and
05:19
pipe accessories to complete the detailed layout.
Video transcript
00:04
With traditional workflows.
00:06
Early stage mechanical layouts are sometimes discarded
00:10
as the project moves to detailed design
00:12
and the duct and piping networks recreated to
00:15
suit the requirements of the developing project.
00:19
Rivet duct and pipe placeholders can be used to leverage early stage
00:23
layouts to create detailed mechanical networks
00:26
utilizing and working with existing information.
00:29
Rather than starting over.
00:32
In this example,
00:33
we will review the duct and pipe placeholders already in the project,
00:37
then convert each layout to duct and pipe including fittings
00:41
while making positional changes as necessary.
00:44
We will finish by adding pipe accessories with the option of
00:47
additional duct and pipe accessories to complete the detailed layout.
00:53
Ensure the current view is set to H VAC floor plans.
00:58
One mec
01:01
let's start by reviewing the supply duct layout,
01:05
selecting a duct placeholder and reviewing the
01:08
properties shows the duct type size and elevation
01:13
using the tab key from the keyboard. Select the entire system
01:18
once selected use the type selector to change the duck type to round duct with Ts
01:25
and set the diameter to eight inches.
01:30
Finally select convert placeholder from the contextual ribbon tab.
01:38
The usual editing tools can now be used to make the necessary adjustments.
01:44
Remove the excess duct from the end of the system
01:50
and convert the cross fitting
01:52
to A T.
01:55
Then from the modify tab of the ribbon,
01:58
use the split element tool to create splits just after each takeoff along the run.
02:10
Select the first run of duct at the riser
02:14
and set the size to 14 inches.
02:23
Select the second run and set the size to 12 inches
02:34
and the third run to 10 inches.
02:41
Finally select a section of the main rum and
02:45
alter the elevation to 9 ft and four inches.
02:51
Further changes can be made to the duck type by selecting the relevant parts
02:56
of the network and choosing change type from the edit panel of the ribbon
03:00
and making the appropriate selection from the type selector.
03:06
Let's go ahead and convert the chilled water flow piping network in the same way,
03:14
use the tab key to chain,
03:16
select the pipework ensuring the pipework is
03:19
set to carbon steel screwed flange coupling.
03:24
Once selected, choose convert placeholder from the ribbon,
03:30
then remove the excess pipe at the end and convert the T to an elbow.
03:38
Finally
03:39
change the elevation for the piping network to 8 ft 10 inches
03:46
and the diameter to one and a quarter inches
03:56
follow the same procedure to convert the chilled water return piping network using
04:02
the same pipe type and setting the elevation to 9 ft nine inches.
04:12
Once converted, the piping networks can be repositioned
04:21
connected to equipment,
04:27
pipe and duct accessories can be added
04:34
and detailed coordination can be carried out,
04:39
finish connecting the remaining equipment to the
04:42
chilled water flow and chilled order,
04:44
return piping networks
04:46
and complete the detailed layout by adding pipe accessories.
04:51
If the details of the design are known at an early stage in a project,
04:55
then duct and pipe placeholders may not have been used
04:58
and a detailed coordinated layout created from the start.
05:02
However,
05:03
where placeholders have been used time can
05:05
be saved by utilizing the original intent
05:08
convert placeholders to duct and pipe
05:11
reposition and connect to equipment, fixtures and air terminals as required.
05:16
And finally add the appropriate duct and
05:19
pipe accessories to complete the detailed layout.
How to buy
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © 2025 Autodesk Inc. All rights reserved
Sign in for the best experience
Save your progress
Get access to courses
Receive personalized recommendations
May we collect and use your data?
Learn more about the Third Party Services we use and our Privacy Statement.May we collect and use your data to tailor your experience?
Explore the benefits of a customized experience by managing your privacy settings for this site or visit our Privacy Statement to learn more about your options.