& Construction

Integrated BIM tools, including Revit, AutoCAD, and Civil 3D
& Manufacturing

Professional CAD/CAM tools built on Inventor and AutoCAD
Run a batch simulation of multiple scenarios.
Tutorial resources
These downloadable resources will be used to complete this tutorial:
Transcript
00:04
Once you have set up multiple scenarios with various settings and conditions,
00:08
you can perform a batch simulation of all
00:10
scenarios to later compare the outputs between them.
00:14
The outputs can be displayed as graphs or tables
00:18
or you can use the scenario comparison tool
00:21
to begin.
00:22
Double click the desired project dot APR X file to open
00:26
Agis Pro.
00:28
Once the project starts,
00:30
click the info water pro tab to open the info water pro ribbon
00:35
in the project panel, click initialize
00:39
in the model explorer,
00:40
select base base data scenario from the scenario dropdown list.
00:47
Switch to the command center tab,
00:49
expand the tools folder
00:51
and then double click batch simulation
00:55
in the batch simulation manager. Ensure that the active scenario is set to base.
01:00
The simulation type is set to standard hydraulic slash quality simulation.
01:05
And the error handling option is set to continue regardless of errors,
01:11
expand the executive order dropdown and set it to bottom up.
01:15
Then in the scenario selection box rearrange the scenarios by selecting each
01:20
and then clicking move up or move down as needed in this order
01:25
base base data scenario,
01:28
existing
01:30
E
01:31
max day
01:33
E X all pumping
01:44
scenarios except for base base data scenario to select them.
01:50
The selected scenarios are highlighted in blue,
01:53
then click run.
01:55
Since the execution order is bottom up,
01:58
the existing scenario will be the active scenario when the process is finished.
02:03
Be sure to watch the message board to see if any scenario runs fail.
02:08
Once the scenarios have completed running,
02:10
click close to exit the batch simulation manager.
00:04
Once you have set up multiple scenarios with various settings and conditions,
00:08
you can perform a batch simulation of all
00:10
scenarios to later compare the outputs between them.
00:14
The outputs can be displayed as graphs or tables
00:18
or you can use the scenario comparison tool
00:21
to begin.
00:22
Double click the desired project dot APR X file to open
00:26
Agis Pro.
00:28
Once the project starts,
00:30
click the info water pro tab to open the info water pro ribbon
00:35
in the project panel, click initialize
00:39
in the model explorer,
00:40
select base base data scenario from the scenario dropdown list.
00:47
Switch to the command center tab,
00:49
expand the tools folder
00:51
and then double click batch simulation
00:55
in the batch simulation manager. Ensure that the active scenario is set to base.
01:00
The simulation type is set to standard hydraulic slash quality simulation.
01:05
And the error handling option is set to continue regardless of errors,
01:11
expand the executive order dropdown and set it to bottom up.
01:15
Then in the scenario selection box rearrange the scenarios by selecting each
01:20
and then clicking move up or move down as needed in this order
01:25
base base data scenario,
01:28
existing
01:30
E
01:31
max day
01:33
E X all pumping
01:44
scenarios except for base base data scenario to select them.
01:50
The selected scenarios are highlighted in blue,
01:53
then click run.
01:55
Since the execution order is bottom up,
01:58
the existing scenario will be the active scenario when the process is finished.
02:03
Be sure to watch the message board to see if any scenario runs fail.
02:08
Once the scenarios have completed running,
02:10
click close to exit the batch simulation manager.
Once you have set up multiple scenarios with various settings and conditions, you can perform a batch simulation of all scenarios to later compare the outputs between them. The outputs can be displayed as graphs or tables, or you can use the Scenario Comparison tool.
BASE, Base Data Scenario
EXISTING
EX_MAXDAY
EX_ALTPUMPING
2030
2030_MAXDAY
2030_ALTPUMPING
TIP: Watch the Message Board to see if any scenario runs fail.
Since the execution order was bottom up, the EXISTING scenario will be the active scenario when the process is finished.