Success Story
MR Group has been successfully operating in the property development market since 2003. The company is a leader in residential and commercial development. Its portfolio includes 50 projects with total area more than 7M m². The company has received plenty of honorable professional awards.
Since 2016, MR Group has been actively using BIM technology at all project lifecycle stages. After implementation of Employer’s Information Requirements (EIR) for design contractors, MR Group brings all advantages of digital technologies directly to the construction sites.
There is no doubt that construction is one of the most conservative industries. Any process adjustments are always facing with shifting in vision. MR Group is a dynamic company: it constantly searches, tests, and implements solutions that increase its efficiency and provide technology advantage. MR Group’s unique and solid product developed with high architectural standard, proper quality and delivered in time is a key factor for the company’s success. It becomes impossible without implementing building information modeling, digital construction and control tools.
"Our priorities are construction process control and optimization", Alex Obukhov, CEO of MR Group, notes. "The real estate developer wants to control scopes and schedule against the business plan considering the real situation on the construction site."
MR Group should use a regularly updated BIM model at all stages: design — construction—operation. The final task is to have a digital twin of the asset as a result of design and construction participants collaboration in a common data environment.
The first step was to develop unified digital information standards for its contractors. The next essential step was to choose the software that would help increase the efficiency of processes at the construction site using the available design data. At the same time, digital control should bring needed transparency.
MR Group chose Autodesk Service Provider SIGNAX for BIM 360 and Autodesk Construction Cloud implementation.
SIGNAX is a portfolio of digital products based on BIM. It increases project management efficiency in construction and provides all participants with identical, objective, and real-time information of the scopes, scheduling, cost, quality and construction risks.
MR Group has launched 3 projects using SIGNAX products. The project participants tested SIGNAX solutions in their daily activities on the construction sites.
They highlighted quick implementation and an easy-to-use experience. They also admitted the construction efficiency increase; project control acceleration; cost and labor savings due to digital document flow.
SIGNAX DASHBOARD module has become a unified reporting standard for all Customers' construction projects. MR Group’s management receives actual construction data for all project stakeholders in real-time mode.
SIGNAX services have allowed us to shorten the time of inspections and site work acceptance by 2 times, the number of construction site visits has decreased by 4 times.
"SIGNAX experts took into account our expectations while adopting the product. In addition, they helped improve our business processes, trained our team and quickly implemented pilot projects. As a result, we plan to bring SIGNAX to all MR Group projects in 2022," added Alex Obukhov.
"Thanks to SIGNAX and the Autodesk Docs common data environment, all construction participants (contractors, designers, consultants) have unified and transparent information on any mobile device online. It allows us to follow the project progress and be sure of the final result," summed up Alex Obukhov.
MR Group is sure that digital transformation of construction processes and the formation of a building digital twin for Stage Operation are the key drivers for success of the Real Estate development business.
Project summary
Duration & delivery
Autodesk solutions
Services provided
Customer industry
Making BIM as great power of construction phase
BTUK ME is an EPC contractor of the basalt fiber rebar manufacturing plant. The construction phase was critical, and leveraging the BIM models from the design stage on-site ensured their total value and consistency.Coordination of disciplinesNumerous changes in one discipline of the BIM model should be coordinated with others to prevent outdated information in drawings and potential clashes inside a single discipline or between several disciplines.Masterplan drawings are not actualThe site’s landscaping and utilities were carried out without an up‑to‑date master plan, the as‑built documentation for these works was provided late, and the design decisions were behind the construction works. This problem led to challenges in coordinating utilities and landscaping, resulting in delayed decision‑making on the construction site. It necessitated significant time to conduct site inspections and become acquainted with the existing conditions and construction updates.Tracking work dynamics and project progressA significant challenge is obtaining real-time and accurate data from the construction site for daily progress reporting. Data collection by classic report methods may lead to delays and potential inaccuracies and not always depict the visual nuances of construction progress. Maintaining consistency and standardization in daily logs across various teams and subcontractors can be difficult.Difference between as‑built and shop drawings. Not enough data for Digital TwinOne of the customer’s requirements was the development of a Digital Twin of the plant, for which it was necessary to combine shop drawings, as‑built documentation, and real‑time sensor data. The survey of MEP systems inside the building was not carried out; as‑built documentation was developed without considering in‑place changes and insufficient data regarding rising pipes and duct elbows. As a result, the actual situation in the facilities differed from that in the drawings.
Contact Partner Finder for help using the online search tool and more. The Autodesk Assistant can help with Autodesk products, answer questions, or send you to an agent.
Partner Finder Terms of Use
By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.
Translation tool disclaimer
This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.