Perfection Reached in UK Reynolds Building By Using Autodesk’s Products

Perfection Reached in UK Reynolds Building By Using Autodesk’s Products

Customer challenge

CINFAB LLC has previously undertaken various building projects for the University of Kentucky Campus, underscoring the significance of their reputation in this venture. As one of the leading Sheet Metal subcontractors in the region, the client's stature is at stake for this particular project. Given that the building already exists, careful consideration of the specifications, materials, and insulation is essential, accounting for the building's current status.


The primary challenge in this project revolves around coordination, compounded by the presence of extensive scan files serving as the architectural and structural 3D model. These files are voluminous and pose a considerable challenge in terms of handling. Difficulties have surfaced in aligning with the Engineer's design model or the 2D layout, particularly when considering intricate project specifications such as proper insulation, materials, fittings, accessories, and more.

Project goals

  • Develop a fabrication-ready model from the design model.
  • Ensure seamless BIM coordination.
  • Minimize rework in the presence of existing site conditions.
  • Create MAJ files for efficient prefabrication of ductwork.

Solution

MODELING

The team at Pinnacle went through the existing condition thoroughly to understand the situation at the original site. We then reviewed the design file to check if it suited the site condition or not. After reviewing the design model with the existing site condition, we moved forward and started preparing the fabrication-level model.


COORDINATION

The most challenging part was initially fitting the services into the existing condition and then coordinating them. The BIM 360 platform helped us use the central file option, which kept both parties updated simultaneously. The Autodesk Construction Cloud server served as a coordination tool, creating a common data environment for all stakeholders.


PREFABRICATION AND INSTALLATION DRAWINGS

The Revit fabrication tool helped us obtain accurate Bills of Materials (BOM) and MAJ files, facilitating the prefabrication process. This tool also assisted in preparing installation drawings, including sections that aided the on-site team in the installation of ductwork.

Business outcome

Utilizing BIM to assess how new services would function in the existing site conditions resulted in several business outcomes, including:

  • Minimization of rework due to existing site conditions.

  • Cost optimization.

  • Streamlined prefabrication of ductwork.

  • Real-time tracking of updates from various stakeholders.

  • Enhanced communication among stakeholders through a common data environment.

Conclusion

Pinnacle assisted the client by implementing the BIM process to elevate the quality of work. This resulted in an almost perfect prefabricated product, significantly reducing manual efforts on-site. The Common Data Environment provided by Autodesk played a pivotal role in addressing the intricate coordination challenges associated with an existing property.

Project summary

    Duration & delivery

  • 275
  • 2023-04-10

    Autodesk solutions

  • Architecture, Engineering & Construction Collection
  • BIM 360
  • Navisworks
  • ReCap Pro
  • Revit
  • Autodesk Platform Services

    Services provided

  • API/Script Support
  • BIM/CAD Standards
  • Forge
  • Migration, Data Loading & Interoperability
  • Assessment of Needs
  • Implementation
  • Pipeline Development
  • Process Automation
  • Strategy & Planning
  • Workflow Optimization
  • Optimize Accelerator Delivery
  • 3D Modeling
  • Concept Development
  • Design/Sales Automation
  • Plotting
  • Prototyping

    Customer industry

  • Architecture
  • Construction Design
  • Facility Management
  • MEP Engineering
  • Structural Engineering
More success stories

Freight Drive Business Park's Quality Output using Autodesk Revit

Sensum Engineering unique background in both project management and design qualifies them as an industry leader in modern construction solutions. They specialize in inherently complex infrastructure projects which include the diverse needs of multiple stakeholders, tight delivery time frames and/or budgetary constraints. Sensum consists of an agile team of highly motivated and experienced staff dedicated to providing a unique and personalized project management service to our clients. They collaborative team brings a wealth of varied perspectives and construction knowledge through trade, commercial construction, property development, and business administration backgrounds. There are few challenges such as few missing specifications of steel members, continuous footing & slab edge, reference dimension for dowels & embeds for precast wall and erection tag with framing family.


View

Facebook Data Center

Founded by Roy Pence and Dale Pence in 1949, Pence/Kelly Concrete, LLC is dedicated to the fundamental principles of honesty and hard work. For six decades, their team has been anchored in Salem, Oregon, providing the Pacific Northwest with the best in structural concrete excellence. The company’s leadership team is comprised of Dave Hays, President and Paul Schulz, Partner.Pence/Kelly’s expertise in structural concrete work spans the construction industry spectrum, from small tilt-up or foundation packages to multi-million dollar elevated structures. Their team has built both simple warehouses and complicated research facilities. They have exceeded client expectations for excellence in concrete throughout California, Oregon, Washington and Alaska. Some of the challenges as follows such as collaboration issue, huge project area to be modeled in a limited time frame; required to create many families for execution, able to shop drawing submissions as per tight schedule, able to grid coordination issues for the separate building, three buildings were part of the same project, making the file size larger and complex to handle, the short time frame for model submission and challenging to coordinate buildings as the admin building connected CCO-5 and CCO-6.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.