Design pipes to meet no-flood criteria by setting the network design criteria.
Type:
Tutorial
Length:
3 min.
Transcript
00:03
for drainage designs to be valid. They first have to meet the no surcharge criteria
00:08
and then they must meet the no flood criteria.
00:12
In this example, the no surcharge criteria have already been designed
00:16
and the pipes have been sized adequately for no surcharge.
00:21
First
00:22
edit the rainfall data so that you are using a longer period storm
00:26
on the ribbon rainfall slash pollutants tab rainfall panel,
00:31
click rainfall manager to open the rainfall manager.
00:35
The design dot rainfall dot I D R X file is already active
00:41
in the tree view,
00:42
expand the design storms node and expand the F S R node and select rain one to edit it
00:49
The Rain one Parameters appear,
00:52
click the return periods tab.
00:55
Currently
00:56
there is a two year period set up,
00:59
click add to add another return period
01:02
Under return period years,
01:04
enter 30,
01:06
Then
01:07
enable the use option for the new 30-year storm and
01:10
then disable the two year storm to deactivate it.
01:14
Click the storm durations tab
01:16
here, leave all nine of these storms active,
01:20
return to the return periods tab to ensure the 30 year storm is active.
01:24
And then click the parameters tab here, leave both summer and winter active,
01:29
which multiplied by the nine active storms gives you an
01:37
click save and then exit the rainfall manager.
01:41
Keep in mind that the no flood criteria
01:43
are quite different from the no surcharge criteria.
01:47
The no flood considers a much longer period of time
01:50
as well as the extreme changes to the rainfall amounts,
01:53
whereas the no surcharge criteria took into account
01:56
a steady state or steady flow of runoff.
02:00
Now that the rainfall criteria have been set,
02:03
you can configure the analysis criteria
02:06
on the ribbon,
02:07
click the analysis tab and then in the criteria panel click analysis criteria.
02:13
The analysis criteria, dialog opens
02:17
here, you stipulate which storms you will run the analysis with.
02:21
In this case there is only one storm,
02:23
so click the checkbox next to rain one to select it
02:28
As soon as you do,
02:29
you can see the method number of storms and the maximum runtime values
02:35
appear as FS are the 18 storms 2880 minutes of runtime respectively.
02:43
Notice the output interval value set to one minute.
02:48
This indicates that the program is reporting a calculated result every minute.
02:54
It is actually performing the calculations every few seconds.
02:57
But for the purposes of the graphing and table tools, it is reported once per minute,
03:03
expand the time step drop down.
03:05
This affects how often the program performs the calculations,
03:09
you can set it to default
03:11
reduced or shortest.
03:15
Essentially this option helps you set the
03:17
balance for creating a stable hydrology model
03:20
in which you can trust the calculations are correct
03:24
info drainage uses S W M M
03:26
a very well understood
03:28
stable calculation model.
03:31
If you were to set this to shortest,
03:33
it would take longer for the calculations to complete.
03:37
In addition,
03:38
it is best to use when you have a more complicated system
03:41
that has storage areas or any constrictions to the flow.
03:44
But since this model is just one line of pipes running downhill,
03:48
you can keep the time step set to default.
03:53
The next parameter urban creep is used to take into
03:56
account that over time the pimp value will increase.
04:00
Property owners may install additional structures or
04:03
they may add a paved parking area,
04:05
all of which would increase the percentage impervious value.
04:10
This can be set to use a global value or
04:13
it can be added to each subcategory within the model
04:17
For this exercise.
04:18
Leave it set to apply global value and leave the percentage set to zero
04:24
the junction flood risk margin is whether the water has come within a certain
04:27
distance of the cover levels in times that it has flooded or nearly flooded.
04:32
This is set to 300
04:35
by default, but you can change this if you need to
04:39
leave the perform no discharge analysis option d selected
04:42
as it is not a normal part of the no flood criteria
04:46
and will not be needed for this exercise.
04:49
Click ok
04:51
with the design criteria set.
04:53
It is time to validate the calculation model
04:57
on the ribbon analysis tab analysis panel, click validate
05:03
the validate. Dialogue opens showing that the site is okay
05:08
if there were any errors such as a pipe that did not have a
05:11
length specified or a manhole that did not have a cover level specified.
05:15
They would appear here under the site node.
05:19
You would be able to click on them to see where in the model the error was
05:23
and the relevant dialog box would open
05:25
so that you could fix the error.
05:28
This is a simple model, however, so no errors occurred.
05:32
Keep in mind that this validation tool checks to
05:35
make sure all the necessary data is there,
05:38
It does not check to make sure the data makes sense.
05:41
For example, if you had an oversized or undersized pipe,
05:45
it would not recognize that here,
05:47
but if those values were completely missing, it would list the error,
05:51
click cancel.
Video transcript
00:03
for drainage designs to be valid. They first have to meet the no surcharge criteria
00:08
and then they must meet the no flood criteria.
00:12
In this example, the no surcharge criteria have already been designed
00:16
and the pipes have been sized adequately for no surcharge.
00:21
First
00:22
edit the rainfall data so that you are using a longer period storm
00:26
on the ribbon rainfall slash pollutants tab rainfall panel,
00:31
click rainfall manager to open the rainfall manager.
00:35
The design dot rainfall dot I D R X file is already active
00:41
in the tree view,
00:42
expand the design storms node and expand the F S R node and select rain one to edit it
00:49
The Rain one Parameters appear,
00:52
click the return periods tab.
00:55
Currently
00:56
there is a two year period set up,
00:59
click add to add another return period
01:02
Under return period years,
01:04
enter 30,
01:06
Then
01:07
enable the use option for the new 30-year storm and
01:10
then disable the two year storm to deactivate it.
01:14
Click the storm durations tab
01:16
here, leave all nine of these storms active,
01:20
return to the return periods tab to ensure the 30 year storm is active.
01:24
And then click the parameters tab here, leave both summer and winter active,
01:29
which multiplied by the nine active storms gives you an
01:37
click save and then exit the rainfall manager.
01:41
Keep in mind that the no flood criteria
01:43
are quite different from the no surcharge criteria.
01:47
The no flood considers a much longer period of time
01:50
as well as the extreme changes to the rainfall amounts,
01:53
whereas the no surcharge criteria took into account
01:56
a steady state or steady flow of runoff.
02:00
Now that the rainfall criteria have been set,
02:03
you can configure the analysis criteria
02:06
on the ribbon,
02:07
click the analysis tab and then in the criteria panel click analysis criteria.
02:13
The analysis criteria, dialog opens
02:17
here, you stipulate which storms you will run the analysis with.
02:21
In this case there is only one storm,
02:23
so click the checkbox next to rain one to select it
02:28
As soon as you do,
02:29
you can see the method number of storms and the maximum runtime values
02:35
appear as FS are the 18 storms 2880 minutes of runtime respectively.
02:43
Notice the output interval value set to one minute.
02:48
This indicates that the program is reporting a calculated result every minute.
02:54
It is actually performing the calculations every few seconds.
02:57
But for the purposes of the graphing and table tools, it is reported once per minute,
03:03
expand the time step drop down.
03:05
This affects how often the program performs the calculations,
03:09
you can set it to default
03:11
reduced or shortest.
03:15
Essentially this option helps you set the
03:17
balance for creating a stable hydrology model
03:20
in which you can trust the calculations are correct
03:24
info drainage uses S W M M
03:26
a very well understood
03:28
stable calculation model.
03:31
If you were to set this to shortest,
03:33
it would take longer for the calculations to complete.
03:37
In addition,
03:38
it is best to use when you have a more complicated system
03:41
that has storage areas or any constrictions to the flow.
03:44
But since this model is just one line of pipes running downhill,
03:48
you can keep the time step set to default.
03:53
The next parameter urban creep is used to take into
03:56
account that over time the pimp value will increase.
04:00
Property owners may install additional structures or
04:03
they may add a paved parking area,
04:05
all of which would increase the percentage impervious value.
04:10
This can be set to use a global value or
04:13
it can be added to each subcategory within the model
04:17
For this exercise.
04:18
Leave it set to apply global value and leave the percentage set to zero
04:24
the junction flood risk margin is whether the water has come within a certain
04:27
distance of the cover levels in times that it has flooded or nearly flooded.
04:32
This is set to 300
04:35
by default, but you can change this if you need to
04:39
leave the perform no discharge analysis option d selected
04:42
as it is not a normal part of the no flood criteria
04:46
and will not be needed for this exercise.
04:49
Click ok
04:51
with the design criteria set.
04:53
It is time to validate the calculation model
04:57
on the ribbon analysis tab analysis panel, click validate
05:03
the validate. Dialogue opens showing that the site is okay
05:08
if there were any errors such as a pipe that did not have a
05:11
length specified or a manhole that did not have a cover level specified.
05:15
They would appear here under the site node.
05:19
You would be able to click on them to see where in the model the error was
05:23
and the relevant dialog box would open
05:25
so that you could fix the error.
05:28
This is a simple model, however, so no errors occurred.
05:32
Keep in mind that this validation tool checks to
05:35
make sure all the necessary data is there,
05:38
It does not check to make sure the data makes sense.
05:41
For example, if you had an oversized or undersized pipe,
05:45
it would not recognize that here,
05:47
but if those values were completely missing, it would list the error,
05:51
click cancel.
For drainage designs to be valid in the UK, they first have to meet the no-surcharge criteria, and then they must meet the no-flood criteria. In this example, the no-surcharge criteria have already been met, so now, it is necessary to check the no flood criteria.
How to buy
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © 2025 Autodesk Inc. All rights reserved
Sign in for the best experience
Save your progress
Get access to courses
Receive personalized recommendations
May we collect and use your data?
Learn more about the Third Party Services we use and our Privacy Statement.May we collect and use your data to tailor your experience?
Explore the benefits of a customized experience by managing your privacy settings for this site or visit our Privacy Statement to learn more about your options.