Customer challenge

The project for COBB Mechanical Contractors and Fort Bliss Hospital consisted of coordinating the mechanical and plumbing trades at the manufacturing level for a 1,130,000 m² project including the main hospital, inpatient and outpatient clinics, the research administration building, the central service plant and the car park. All buildings were highly complex and met strict requirements.

Project goals

The main objective was to coordinate the mechanical and plumbing trades and all required seismic bracing as efficiently as possible to minimize costs, time and problems in the field. In addition, it was to advise on any potential design issues and work in the early stages to receive responses from the design team prior to fabrication and installation. Complements were incorporated to improve the performance of the work.

Solution

By combining the help of AutoCAD MEP and Navisworks, we were able to detect and easily communicate the coordination issues to the other stakeholders and reach for the best solution possible.

Business outcome

We helped the Fort Bliss Hospital to rethink all their plumbing systems and to unify them in their different enclosures. This project also was an opportunity for us to work with big companies and show how professional and committed our team is. Not only for the level of complexity of the work but also for being able to overcome all the obstacles that arise in such long projects.

Conclusion

Whether upstream, during the coordination process, or downstream, during the preparation of shop drawings, Autodesk tools offer countless possibilities to prepare for success, even on the largest and longest projects. And the possibilities are endless, as it is always possible to incorporate and even create additions and improvements throughout the process.

Project summary

    Duration & delivery

  • 1095
  • 2019-07-19

    Autodesk solutions

  • Architecture, Engineering & Construction Collection

    Customer industry

  • MEP Engineering
More success stories

Digital Transformation With Zero Downtime and Zero Productivity Loss: A Voyansi-RedBuilt Case Study

In 2018, RedBuilt found itself at a crossroads. They had weathered the great recession in good form, but the experience had raised tough questions about the kind of company that RedBuilt should become, and where they wanted to be positioned in the marketplace. RedBuilt had always prided themselves on staying ahead of the curve, especially when it came to their innovative portfolio of structural wood products. But their digital infrastructure was merely keeping pace with the rest of the industry, and the company was keen to change that. To navigate that transformation, they sought help from Autodesk Solution Provider Voyansi.


View

Kenect Apartment Tower

UEB/Katerra needed to simulate the building’s construction in a 3D environment to get coordinated layouts of the MEP and FP systems to the Architectural and Structural design team. The challenge was construction was ongoing while the BIM Coordination process took place. The main priority was to get accurate concrete penetrations located on-site ahead of the concrete pouring schedule. An added benefit was to actually verify the engineer’s design and confirm feasibility or propose a solution.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.