Success Story
UEB/Katerra needed to simulate the building’s construction in a 3D environment to get coordinated layouts of the MEP and FP systems to the Architectural and Structural design team. The challenge was construction was ongoing while the BIM Coordination process took place. The main priority was to get accurate concrete penetrations located on-site ahead of the concrete pouring schedule. An added benefit was to actually verify the engineer’s design and confirm feasibility or propose a solution.
UEB/Katerra had the following priority project goals: 1) Collaboratively coordinate the MEP and FP systems of a 24-story mixed-use building while constructing the building and 2) Simulate the building's construction in a 3D environment to verify the engineer's design and confirm feasibility
Setting up ground rules for coordination using a BEP, we put together a collaborative process of modeling using Autodesk Revit, and BIM Coordination combining all trade’s models with Autodesk Navisworks. Through good communication and being able to show the added value of the process for all stakeholders, we were able to validate the design, come up with alternatives, solve construction problems before they actually occurred, and end up with a 3D coordination model for the whole building.
Key business outcomes included being able to save construction time and costs by “testing” the design intent of all trades involved in a 3D environment and enhancing communication of all stakeholders through a collaborative process resulting in fewer RFIs and faster response time.
There’s always room for improvement and innovation when it comes to facing new clients with different needs. The Autodesk tools have proven to be flexible and easy to interact with, giving AEC Resource the opportunity to quickly overcome issues and work out solutions.
Project summary
Duration & delivery
Autodesk solutions
Customer industry
Digital Transformation With Zero Downtime and Zero Productivity Loss: A Voyansi-RedBuilt Case Study
In 2018, RedBuilt found itself at a crossroads. They had weathered the great recession in good form, but the experience had raised tough questions about the kind of company that RedBuilt should become, and where they wanted to be positioned in the marketplace. RedBuilt had always prided themselves on staying ahead of the curve, especially when it came to their innovative portfolio of structural wood products. But their digital infrastructure was merely keeping pace with the rest of the industry, and the company was keen to change that. To navigate that transformation, they sought help from Autodesk Solution Provider Voyansi.
Improve Fort Bliss Hospital Mechanical and Plumbing Systems
The project for COBB Mechanical Contractors and Fort Bliss Hospital consisted of coordinating the mechanical and plumbing trades at the manufacturing level for a 1,130,000 m² project including the main hospital, inpatient and outpatient clinics, the research administration building, the central service plant and the car park. All buildings were highly complex and met strict requirements.
Contact Partner Finder for help using the online search tool and more. The Autodesk Assistant can help with Autodesk products, answer questions, or send you to an agent.
Partner Finder Terms of Use
By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.
Translation tool disclaimer
This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.