Exterior Improvement - Barrio 31 Masterplan

Customer challenge

The project with Buenos Aires City Hall was a public project with many stakeholders and time/budget constraints. The Barrio 31 neighborhood was built with no regulation, so surveying the site through traditional methods would have taken 4 to 6 months and a team of 20+ architects.

Project goals

The project consisted of the improvement of existing houses and the construction of new ones, the provision of definitive water, sewage, electricity, gas and telephone installations; the transformation of public space with the opening of streets, squares and parks; as well as the refurbishment and construction of new community equipment (schools, libraries, health and sports centers). In this puzzle, AEC’s BIM, software and reality capture services fit in the external improvement of existing processes.

Solution

This project was made possible by implementing BIM along with a team of highly proactive people with great leadership, automated processes, and good teamwork. Otherwise, the time constraints would not have allowed for delivering such a huge amount of work (improvements to around 1100 homes were designed and fully documented).

Business outcome

The business outcomes are:

1. Time reduced with manual work and errors through automation, from 24 to 8 hours per parcel

2. Quality assurance throughout the whole process with reduced quality control time

3. Reduced time on less important repetitive work to afford the team time to focus on more important design-oriented tasks

4. Improved documentation delivery time so work on-site would start without delays

5. Consistency gained among the team drawings

6. Design and criteria improved

Conclusion

This project was a success by implementing a technology that can effectively improve business outcomes and also transform reality for the better in contexts in which it is normally not applied: a low-income emergency neighborhood in Latin America.

Project summary

    Duration & delivery

  • 180
  • 2023-08-23

    Autodesk solutions

  • Dynamo Studio
  • Revit

    Services provided

  • Virtualization

    Customer industry

  • Architecture
  • Civil Engineering
  • Construction Design
  • Facility Management
  • MEP Engineering
  • Mining & Quarrying
  • Oil & Gas
  • Other Engineering Industries
  • Structural Engineering
  • Utilities & Telecommunications
  • Water & Wastewater
More success stories

Digital Transformation With Zero Downtime and Zero Productivity Loss: A Voyansi-RedBuilt Case Study

In 2018, RedBuilt found itself at a crossroads. They had weathered the great recession in good form, but the experience had raised tough questions about the kind of company that RedBuilt should become, and where they wanted to be positioned in the marketplace. RedBuilt had always prided themselves on staying ahead of the curve, especially when it came to their innovative portfolio of structural wood products. But their digital infrastructure was merely keeping pace with the rest of the industry, and the company was keen to change that. To navigate that transformation, they sought help from Autodesk Solution Provider Voyansi.


View

Kenect Apartment Tower

UEB/Katerra needed to simulate the building’s construction in a 3D environment to get coordinated layouts of the MEP and FP systems to the Architectural and Structural design team. The challenge was construction was ongoing while the BIM Coordination process took place. The main priority was to get accurate concrete penetrations located on-site ahead of the concrete pouring schedule. An added benefit was to actually verify the engineer’s design and confirm feasibility or propose a solution.


Improve Fort Bliss Hospital Mechanical and Plumbing Systems

The project for COBB Mechanical Contractors and Fort Bliss Hospital consisted of coordinating the mechanical and plumbing trades at the manufacturing level for a 1,130,000 m² project including the main hospital, inpatient and outpatient clinics, the research administration building, the central service plant and the car park. All buildings were highly complex and met strict requirements.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.