Key Learnings
- Recognize the challenge related to the implementation of BIM for substations
- Judge the different areas that need to be developed for BIM implementation for substation projects
- Describe how the Revit can be customized to be used as an 3D authoring tool for substation design
Speakers
- Kosta Snajderov(Primary and Secondary Electrical Design) Engineer; BIM Coordinator; CAD Manager; @ Siemens Energy LLC Dubai
- ASAjmal SaudagarAjmal Hussein Saudagar is a BIM Engineer at Siemens GP EPC TS in Dubai, UAE. With a background combining Project Management and BIM Modelling, he is currently working on implementing Building Information Modelling within Siemens for substation design. Having delivered a successful Proof of Concept along with Autodesk, he is now devising BIM workflows, standards and BIM modelling procedures for Siemens within the region.