Description
Key Learnings
- To get an AHA experience about new ways to work in big projects by focusing on 3D models and BIMdata instead of drawings to achieve an unbroken flow of digital information
- To understand how to set up a project to be able to accomplish design and production without drawings as a deliverable
- To understand which information carriers (deliverables) that is needed instead of traditional 2D drawings.
- To understand which processes that is needed to implement a drawingless design, review and production in a 500 team members project
Speaker
- JSJohan StribeckJohan have lead a Business Area in Tikab, that offers BIM Strategy and Implementation for companies and projects in Sweden for 20 years. Tikab BuildTech Management includes a team that develop interactive solutions thanks to programmers, system architects and game developers. Today Johan have passed the responsibility to other leaders and works with R&D, Marketing and as a strategist in BIM projects. An Example of high end BIM projects are Slussen - an $1.2BN infrastructure project in central Stockholm where the design team delivers documentation as 3D-geometry models for stakeout, BIM data models and databases instead of traditional drawings. Project Slussen is considered one of the projects that have made most progress in digitization and BIM in Sweden so far where the contractor is using BIM and geometry models in the field.
Downloads
Tags
Product | |
Industries | |
Topics |